2km |
30/04/2024 |
N/A |
Doorosheath , Fivealley , Birr Co. Offaly |
A new office and secure store room and all associated site works.... login required. |
Details... |
2.9km |
26/04/2023 |
CONDITIONAL |
CURRAGHMORE , KILCORMAC , CO. OFFALY |
CONSTRUCTION OF A CATTLE SHED WITH UNDERGROUND SLATTED SLURRY STORAGE, CATTLE HANDLING AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.1km |
24/04/2023 |
CONDITIONAL |
DOOROSHEATH , FIVEALLEY BIRR , CO. OFFALY R42 DR79 |
A NEW SLATTED LIVESTOCK SHED INCLUDING EFFLUENT TANKS AND CATTLE BEDDING SHED AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
02/03/2023 |
CONDITIONAL |
BROUGHAL , KILCORMAC , CO. OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.2km |
23/02/2023 |
CONDITIONAL |
COOLOGE FIVEALLEY , BIRR , CO. OFFALY |
DOMESTIC GARAGE, FUEL SHED AND ALL ASSOCIATED SITE WORKS AND SERVICES ... login required. |
Details... |
2.5km |
07/11/2022 |
CONDITIONAL |
BROUGHAL , KILCORMAC , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS.... login required. |
Details... |
1.3km |
01/07/2022 |
N/A |
CLONBEALE BEG GLEBE RATHURE NORTH (PARCEL 1) AND , PARKMORE (PARCEL 2) , CO. OFFALY |
A 10 YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF SOLAR PV DEVELOPMENT ON TWO SEPARATE AND DETACHED PARCELS OF LAND, PARCEL 1 IS LOCATED IN THE TOWNLAND OF CLONBEALE BEG GLEBE, RATHURE NORTH, WHILE PARCEL 2 IS LOCATED IN THE TOWNLAND OF PARKMORE. BOTH SEPARATE PARCELS WILL BE CONNECTED TO AN EXISTING PERMITTED SOLAR DEVELOPMENT UNDER PLANNING APPLICATION REF: PR20/476 BY UNDERGROUND CABLES (WILL BE SUBJECT TO A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT CONSENT APPLICATION). EACH DETACHED PARCEL CONTAINING PV PANELS WILL BE LAID OUT IN ARRAYS OVER A TOTAL ... login required. |
Details... |
2.8km |
06/10/2021 |
CONDITIONAL |
BROUGHAL AND DRINAGH , CO OFFALY |
A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 25MW COMPRISING OF CA.55,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 10 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 ... login required. |
Details... |
2.6km |
30/08/2021 |
CONDITIONAL |
J GRENAN & SONS TINNACROSS RATH BIRR , CO. OFFALY , R42YA49 |
THE INSTALLATION OF A ROOF TOP SOLAR PHOTOVOLTAIC ARRAY (2476 SQ.M) AND ASSOCIATED ELECTRICAL INFRASTRUCTURE ON EXISTING MANUFACTURING FACILITY... login required. |
Details... |
70m |
23/04/2021 |
CONDITIONAL |
BALLYKEALY , FIVEALLEY BIRR , CO. OFFALY |
NEW DWELLING HOUSE, HOME OFFICE, SHED, ACCESS ROAD, WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
2.3km |
16/02/2021 |
CONDITIONAL |
COOLOGE FIVEALLEY , BIRR , CO. OFFALY |
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, INSTALLATION OF SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
28/01/2021 |
CONDITIONAL |
RAHEENGLASS , RATH , BIRR CO. OFFALY |
CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |