2.3km |
30/07/2024 |
CONDITIONAL |
Knocknahorna , Banagher , Co.Offaly |
a new dwelling house, domestic garage, wastewater treatment system, bored well, driveway and entrance and all associated site works.... login required. |
Details... |
1.3km |
01/03/2024 |
N/A |
Clondallow , Birr , Co. Offaly |
100MW Battery Energy Storage Station with 53 battery containers and associated equipment, with a control room container, site entrance, and all associated works... login required. |
Details... |
2.1km |
30/11/2023 |
CONDITIONAL |
Annagh , Birr , Co Tipperary |
(1) a new farm building for the housing of livestock with a solid concrete floor and external concrete yard, all completed with associated siteworks; (2) Permission to construct a new farm building for the housing of livestock with a solid concrete floor, external concrete yard and perime... login required. |
Details... |
2.7km |
03/11/2023 |
CONDITIONAL |
Annagh , Rathcabbin , Roscrea Co. Tipperary |
dwelling house, garage, implement shed, new septic tank and percolation area, all associated site works and a new entrance... login required. |
Details... |
1.6km |
13/10/2023 |
CONDITIONAL |
RIGDE ROAD , BEGGARSTOWN , LUSMAGH CO. OFFALY |
THE RENOVATION OF AN EXISTING SINGLE STOREY DWELLING AND THE CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE REAR, A DOMESTIC GARAGE, ALL INTERNAL MODIFICATIONS, A PROPOSED SEPTIC TANK AND PERCOLATION AREA, FRONT BOUNDARY ADJUSTMENTS AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
06/10/2023 |
CONDITIONAL |
In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly |
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the prop... login required. |
Details... |
3km |
22/09/2023 |
N/A |
in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly |
a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the propos... login required. |
Details... |
2.3km |
24/05/2023 |
REFUSED |
KNOCKNAHORNA , BANAGHER , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, BORED WELL, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
29/11/2021 |
CONDITIONAL |
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY |
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
29/11/2021 |
CONDITIONAL |
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY |
INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
08/11/2021 |
N/A |
WOODFIELD OR TULLYNISK , BIRR , CO OFFALY |
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2km |
27/10/2021 |
CONDITIONAL |
Annagh , Birr , Co. Tipperary |
a part two-storey dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works... login required. |
Details... |
180m |
04/06/2021 |
CONDITIONAL |
KILNAGLINNY , BIRR , CO. OFFALY |
CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, INTEGRATED DOMESTIC GARAGE, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA, A BORED WELL, AND ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE... login required. |
Details... |