1.2km |
30/03/2024 |
N/A |
Oola Hills East , Oola , Co. Limerick |
the construction of entrance, dwelling house, sewage treatment system and percolation area... login required. |
Details... |
1.5km |
27/03/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development works... login required. |
Details... |
1.9km |
08/03/2024 |
N/A |
Gortakilleen , Oola , Co. Limerick |
new domestic extension to an existing dwelling, and all associated site works... login required. |
Details... |
1.2km |
26/02/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
change of layout of layout and house type previously granted under planning ref 20388 ... login required. |
Details... |
1.2km |
12/02/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a new dwelling house and domestic garage (change of layout and house design granted under planning ref 20388) ... login required. |
Details... |
1.5km |
25/01/2024 |
N/A |
Monahalla (Monahilla) , Oola , Co. Limerick. |
the construction of an extension to the side and rear of our dwelling house, to include a privacy/screen wall attached to the front of the dwelling house and all ancillary site works... login required. |
Details... |
2.3km |
19/12/2023 |
N/A |
Oola Enterprise Centre , Castlelloyd Oola , Co. Limerick |
the construction a new vehicular entrance and to erect a new 2.4m high boundary fence including all ancillary site works... login required. |
Details... |
2.7km |
14/12/2023 |
CONDITIONAL |
Longford West , Oola , Co. Limerick |
the demolition of existing rear annex to existing house, demolition of existing outbuilding, construction of a new extension to side of existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, together with all associated site works... login required. |
Details... |
1.8km |
04/10/2023 |
N/A |
Hogans Public House and adjoining vacant site , Main Street , Oola Co. Limerick |
the demolition of a small single storey store to the south east of the Public House and its replacement with residential accommodation spread over 2 levels and joining in to the present first floor level over the Public House for use as their private family home, as well as the construction of 2 no. 2 storey house... login required. |
Details... |
1.4km |
27/09/2023 |
CONDITIONAL |
Moanahila , Oola , Co. Limerick |
the construction of a single storey extension to existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, erection of recessed wing walls to improve existing vehicular entrance, together with all associated site works... login required. |
Details... |
1.8km |
02/04/2023 |
CONDITIONAL |
Main Street , Oola , Co. Limerick |
the following: Boiler shed/store attached to rear of garage. Increase in height of rear boundary wall and all associated site and ancillary works.... login required. |
Details... |
2.8km |
17/02/2023 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
(a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development works ... login required. |
Details... |
1.5km |
26/01/2023 |
REFUSED |
Oola Hills West , Oola , Co. Limerick |
the construction of a two storey dwelling house, detached domestic garage, waste water treatment system, percolation area, entrance and all other ancillary site works... login required. |
Details... |
1.8km |
21/12/2022 |
CONDITIONAL |
Seskin , Co. Tipperary |
(i) alterations to site entrance, (ii) the boundary wall and piers to the south and west of the site, (iii) the internal wall to facilitate the ESB services, (iv) the hardcore gravel area, (v) the shed and storage container on site and associated site works ... login required. |
Details... |
1.5km |
07/10/2022 |
CONDITIONAL |
Oola Hills East , Oola |
an agricultural shed incorporating a slatted tank and all associated site works... login required. |
Details... |
2.4km |
16/08/2022 |
CONDITIONAL |
Barnanalleen , Moanmore and , Seskin |
a solar PV development on a 92 ha site consisting of:
- The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping;
- 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses;
- 1 no. on-site IPP switching substation and associated works a... login required. |
Details... |
2.2km |
08/08/2022 |
N/A |
Barnanalleen Moanmore Seskin , Seskin , Co Tipperary |
a solar PV development on a 92 ha site consisting of: (1) The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; (2) 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; (3) 1 no. on-site IPP switchi... login required. |
Details... |
2km |
13/07/2022 |
CONDITIONAL |
O'Donovans Londis , Main Street , Moanoola (Oola) Co. Limerick |
an off-licence use as part of an existing shop, including all associated site works... login required. |
Details... |
2.3km |
08/06/2022 |
CONDITIONAL |
Monard Lower , Monard , Co Tipperary |
the demolition of some remaining old house walls and the construction of a dwelling house, wastewater treatment system, amendments to existing field entrance with all ancillary site works ... login required. |
Details... |
2.9km |
27/05/2022 |
CONDITIONAL |
Ballyvalode , Near Oola , Co. Limerick |
a 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated works on a site of approximately 6.20 hectares. This will include the following: A substation occupying 2.11 hectares, comprising: TSO (Eirgrid) compound with electrical equipment, transformer sub-compound, bus bars sub-compound, cable chairs and substation building (435m2), enclosed by palisade fencing at 0.95 hectares in area. One transformer up to 110kV within the TSO compound and the provision of an area for a second transformer if future Eirgrid expansion is required. Required TSO expansion area enclosed by palisade fencing at 0.79 hectares. Operators compound (with switchroom building, electrical equipment, rainwater collection system) enclosed by palisade fencing at 0... login required. |
Details... |