2.2km |
10/08/2024 |
N/A |
Ballyboe , Ballypatrick , Co.Tipperary |
the construction of a new dormer dwelling and to renovate and make minor alterations to the the existing derelict dwelling, which will be integrated into the new dwelling; installation of a new domestic wastewater treatment system and all associated works... login required. |
Details... |
1.3km |
05/08/2024 |
N/A |
Cooloran , Ballypatrick , Clonmel Co. Tipperary |
the construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and
All necessary associated site works and services... login required. |
Details... |
1.4km |
19/02/2024 |
CONDITIONAL |
Lisnatrubid , Ballypatrick , Clonmel |
the construction of new side and rear extension and to complete all associated site works... login required. |
Details... |
2.7km |
20/12/2023 |
CONDITIONAL |
Anner Castle , Ballinamore , Co. Tipperary |
the fitting-out of Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref: 14/600555) to include the following: a) 8 bedrooms and associated bathrooms, b) wheelchair accessible lift, c) refurbishment and extension of th... login required. |
Details... |
2.6km |
15/12/2023 |
N/A |
Anner Castle , Ballinamore , Co Tipperary |
fit-out Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref:14/600555). This is to include the following: a- 8 bedrooms and associated bathrooms, b- Wheelchair accessible lift, c- Refurbishment and extension o... login required. |
Details... |
1.3km |
18/08/2023 |
CONDITIONAL |
Templetney Ballypatrick , Clonmel , Co. Tipperary |
erection of a dwelling house, treatment system, entrance, driveway and all associated site development works... login required. |
Details... |
1.2km |
23/12/2022 |
CONDITIONAL |
Lisnatubbrid , Ballypatrick , Clonmel |
(i) Existing domestic stable building, (ii) Existing detached garage and dog houses, (iii) Existing detached dog house, (iv) Existing entrance structure, (v) ... login required. |
Details... |
660m |
23/03/2022 |
CONDITIONAL |
Killurney , Clonmel , Co. Tippeary |
demolition of existing non original extensions to rear of farmhouse and construction of new single storey extension to rear and upgrade of associated waste water treatment system alongsi... login required. |
Details... |
570m |
21/03/2022 |
N/A |
Killurney , Clonmel , Co Tipperary |
The development will consist of; demolition of existing non original extensions to rear of farmhouse and construction of a new single storey extension to rear and upgrade of associated waste water treatme... login required. |
Details... |
1.1km |
17/02/2022 |
CONDITIONAL |
Killurney , Ballypatrick , Clonmel |
the following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works ... login required. |
Details... |
2km |
30/09/2021 |
UNCONDITIONAL |
Ballyknockane , Clonmel , Co. Tipperary |
filling the remaining void in the existing quarry and reinstate to levels... login required. |
Details... |
2.6km |
24/09/2021 |
CONDITIONAL |
Ballyknockane & Ballyboe , Ballypatrick , Clonmel |
demolition of an existing two storey dwelling and for the construction of a single storey replacement dwelling with associated effluent treatment plant a... login required. |
Details... |
1.1km |
28/04/2021 |
CONDITIONAL |
Cooloran , Ballypatrick , Clonmel |
demolition of existing single storey extension and construct part 2 storey part single storey extension, raise roof of existing dwelling, upgrade wastewater system to current EPA standards, construct wing walls and piers to existing entrance and all other associated site works... login required. |
Details... |
1.8km |
29/03/2021 |
CONDITIONAL |
Ballyboe , Clonmel , Co. Tipperary |
amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment a... login required. |
Details... |
150m |
09/02/2021 |
CONDITIONAL |
Killurney , Ballypatrick , Clonmel |
a dormer type residence, vehicular entrance, septic tank treatment system and percolation area, new water supply borehole and all associated site works... login required. |
Details... |