2.1km |
10/08/2024 |
N/A |
Ballyboe , Ballypatrick , Co.Tipperary |
the construction of a new dormer dwelling and to renovate and make minor alterations to the the existing derelict dwelling, which will be integrated into the new dwelling; installation of a new domestic wastewater treatment system and all associated works... login required. |
Details... |
1.6km |
05/08/2024 |
N/A |
Cooloran , Ballypatrick , Clonmel Co. Tipperary |
the construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and
All necessary associated site works and services... login required. |
Details... |
2.6km |
24/06/2024 |
CONDITIONAL |
Ballyvaughan House , Ballyvaughan , Clonmel Co. Tipperary |
proposed extensions and renovations to existing dwelling ... login required. |
Details... |
2.9km |
11/04/2024 |
CONDITIONAL |
Ballyvaughan , Powerstown , Clonmel Co. Tipperary |
the construction of a 4-bedroom, detached dormer dwelling, proprietary wastewater treatment system, new vehicular entrance, and all associated site development and boundary treatment works necessary to facilitate the development... login required. |
Details... |
370m |
19/02/2024 |
CONDITIONAL |
Lisnatrubid , Ballypatrick , Clonmel |
the construction of new side and rear extension and to complete all associated site works... login required. |
Details... |
1.8km |
20/12/2023 |
CONDITIONAL |
Anner Castle , Ballinamore , Co. Tipperary |
the fitting-out of Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref: 14/600555) to include the following: a) 8 bedrooms and associated bathrooms, b) wheelchair accessible lift, c) refurbishment and extension of th... login required. |
Details... |
1.6km |
15/12/2023 |
N/A |
Anner Castle , Ballinamore , Co Tipperary |
fit-out Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref:14/600555). This is to include the following: a- 8 bedrooms and associated bathrooms, b- Wheelchair accessible lift, c- Refurbishment and extension o... login required. |
Details... |
230m |
18/08/2023 |
CONDITIONAL |
Templetney Ballypatrick , Clonmel , Co. Tipperary |
erection of a dwelling house, treatment system, entrance, driveway and all associated site development works... login required. |
Details... |
1.2km |
06/03/2023 |
CONDITIONAL |
Killurney , Ballypatrick , Clonmel |
(1) the construction of new single storey dwelling, (2) a new site entrance (3) a new waste-water treatment system and percolation area, (4) a new external store and (5) all necessary services and site works... login required. |
Details... |
2.9km |
23/12/2022 |
N/A |
Ballyvaughan , Powerstown , Clonmel |
dwelling, septic tank and proprietary effluent treatment system; new vehicular entrance and all associated site development and landscaping works... login required. |
Details... |
2.5km |
06/05/2022 |
CONDITIONAL |
Redmondstown , Clonmel , Co Tipperary |
the demolition of existing extension and shed, new single storey extension to existing dwelling, new waste water treatment system to replace existing septic tank, detached garage togethe... login required. |
Details... |
1.3km |
23/03/2022 |
CONDITIONAL |
Killurney , Clonmel , Co. Tippeary |
demolition of existing non original extensions to rear of farmhouse and construction of new single storey extension to rear and upgrade of associated waste water treatment system alongsi... login required. |
Details... |
1.4km |
21/03/2022 |
N/A |
Killurney , Clonmel , Co Tipperary |
The development will consist of; demolition of existing non original extensions to rear of farmhouse and construction of a new single storey extension to rear and upgrade of associated waste water treatme... login required. |
Details... |
1.4km |
17/02/2022 |
CONDITIONAL |
Killurney , Ballypatrick , Clonmel |
the following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works ... login required. |
Details... |
2.8km |
19/10/2021 |
CONDITIONAL |
Ballinamore , Clonmel , Co. Tipperary |
fill the existing gravel pit and reinstate to levels, including all associated site development works... login required. |
Details... |
2.6km |
30/09/2021 |
UNCONDITIONAL |
Ballyknockane , Clonmel , Co. Tipperary |
filling the remaining void in the existing quarry and reinstate to levels... login required. |
Details... |
2.9km |
24/09/2021 |
CONDITIONAL |
Ballyknockane & Ballyboe , Ballypatrick , Clonmel |
demolition of an existing two storey dwelling and for the construction of a single storey replacement dwelling with associated effluent treatment plant a... login required. |
Details... |
670m |
28/04/2021 |
CONDITIONAL |
Cooloran , Ballypatrick , Clonmel |
demolition of existing single storey extension and construct part 2 storey part single storey extension, raise roof of existing dwelling, upgrade wastewater system to current EPA standards, construct wing walls and piers to existing entrance and all other associated site works... login required. |
Details... |
1.8km |
29/03/2021 |
CONDITIONAL |
Ballyboe , Clonmel , Co. Tipperary |
amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment a... login required. |
Details... |