2.4km |
15/07/2024 |
N/A |
Ballyporeen , Cahir , Co. Tipperary |
the construction of a dwelling, garage, entrance, septic tank and percolation area and all associated site works... login required. |
Details... |
620m |
16/05/2024 |
CONDITIONAL |
Kilcarroon , Clogheen , Co. Tipperary |
(i) Slatted shed with crush & underground effluent tank (ii) slatted shed (iii) walled silage slab extension with apron and all associated site works. Demolition of silage slab is also required... login required. |
Details... |
2.3km |
08/03/2024 |
CONDITIONAL |
Killeatin , Clogheen , County Tipperary |
1) the as constructed alterations to the fenestration of existing house, the addition of rooflights and the removal of existing chimney.
2) Permission for retention for a new veh... login required. |
Details... |
2km |
31/01/2024 |
CONDITIONAL |
Newcastle , Ballyporeen , Co.Tipperary |
the extension, re-roofing, to make elevational changes and re-positioning of the existing entrance to the existing dwelling... login required. |
Details... |
1.3km |
29/01/2024 |
CONDITIONAL |
Gorteeshal , Ballyporeen , Co. Tipperary |
the construction of a single storey dwelling, a vehicular entrance, a tertiary treatment system and infiltration/treatment area and to allow for all ancillary site works... login required. |
Details... |
2km |
24/01/2024 |
N/A |
Newcastle , Ballyporeen , Co.Tipperary |
extension, re-roof, make elevational changes and re-position entrance to dwelling house... login required. |
Details... |
2.1km |
09/01/2024 |
REFUSED |
Glenacunna , Ballyporeen , Co. Tipperary |
the construction of a cubicle house, dairy wash tank, open slurry tank, silage slab, slatted channel, dungstead, demolition of existing silage slab dungstead and covered slurry tank and associated works... login required. |
Details... |
1.5km |
29/12/2023 |
CONDITIONAL |
Gorteeshal , Ballyporeen , Co Tipperary |
(1) the relocation of the existing polytunnel currently situated south of the creche to a new location on the green west of the creche, (2) the construction of two new prefabricated log cabins, one log cabin shall be situated to the south of the creche and the ... login required. |
Details... |
1.4km |
08/12/2023 |
N/A |
Gorteeshal , Ballyporeen , Co Tipperary |
(1) the relocation of the existing polytunnel currently situated south of the creche to a new location on the green west of the creche, (2) the construction of two new prefabricated log cabins, one shall be situated to the south of the creche and the se... login required. |
Details... |
3km |
31/10/2023 |
CONDITIONAL |
Carriganroe , Ballyporeen , Co. Tipperary |
the construction of a cattle underpass, slatted effluent tank and all associated site works... login required. |
Details... |
2.7km |
17/10/2023 |
CONDITIONAL |
Glenacunna Ballyporeen , Cahir , Co. Tipperary |
a new two storey-dwelling, wastewater treatment system with percolation area, the change of use of existing single storey bungalow into an office and all associated site works... login required. |
Details... |
2.7km |
23/08/2023 |
N/A |
Glenacunna Ballyporeen , Cahir , Co. Tipperary |
a new two storey-dwelling, wastewater treatment system with percolation area, the change of use of existing single storey bungalow into an office and all associated site works... login required. |
Details... |
2.6km |
03/08/2023 |
N/A |
Glenacunna Ballyporeen , Cahir , Co. Tipperary |
a new two storey-dwelling, wastewater treatment system with percolation area and all associated site works... login required. |
Details... |
1.9km |
22/06/2023 |
CONDITIONAL |
Glenacunna , Ballyporeen , Co. Tipperary |
the construction of a new single-storey dwelling with detached garage, vehicular entrance, septic tank and percolation area, and associated site boundary and site development works... login required. |
Details... |
1.9km |
01/06/2023 |
CONDITIONAL |
River Lane , Riverstown , Ballyporeen Co. Tipperary |
the extension and renovation of existing dwelling and permission to raise the walls and roof of the dwelling to develop first floor accommodation and permission to demol... login required. |
Details... |
2.1km |
13/04/2023 |
CONDITIONAL |
Killeatin , Clogheen , Co. Tipperary |
construction of a new part single storey, part one & a half storey, split level dwelling and single-storey garage to the north, with a packaged wastewater ... login required. |
Details... |
1.8km |
13/03/2023 |
CONDITIONAL |
Glenacunna Td. , Ballyporeen , Cahir |
a bungalow as constructed, which was previously granted under planning permission number: P3/1490 and Permission for Retention for extensions to rear and sides (including domestic garage/shed) ... login required. |
Details... |
1.7km |
13/01/2023 |
CONDITIONAL |
Lower Main Street , Ballyporeen , Cahir |
the refurbishment of Balllyporeen Old Boys National School. Erect new fencing segregating Old from New school and replace neighbouring fence with screen fence. Construct 1.8 m walkway path on East side with en... login required. |
Details... |
2km |
11/01/2023 |
CONDITIONAL |
Castle Yard , Newcastle , Ballyporeen |
three detached dwellings and associated works ... login required. |
Details... |