1.6km |
09/04/2024 |
N/A |
The Meadows , Ballyporeen , Co Tipperary |
the demolition of 5 no. partially constructed dwellings as well as planning permission for 20 no. new dwellings together with the completion of roads, footpath... login required. |
Details... |
2km |
29/01/2024 |
CONDITIONAL |
Gorteeshal , Ballyporeen , Co. Tipperary |
the construction of a single storey dwelling, a vehicular entrance, a tertiary treatment system and infiltration/treatment area and to allow for all ancillary site works... login required. |
Details... |
1.8km |
22/01/2024 |
N/A |
Main Street , Ballyporeen , Co. Tipperary |
an extension to their dwelling consisting of a ground floor bedroom and bathroom... login required. |
Details... |
1.2km |
09/01/2024 |
REFUSED |
Glenacunna , Ballyporeen , Co. Tipperary |
the construction of a cubicle house, dairy wash tank, open slurry tank, silage slab, slatted channel, dungstead, demolition of existing silage slab dungstead and covered slurry tank and associated works... login required. |
Details... |
1.8km |
29/12/2023 |
N/A |
Gorteeshal , Ballyporeen , Co Tipperary |
(1) The relocation of the existing polytunnel currently situated south of the creche to a new location on the green west of the creche. (2). The construction of two new prefabricated log cabins. One log cabin shall be situated to the south of the creche and the ... login required. |
Details... |
1.8km |
08/12/2023 |
N/A |
Gorteeshal , Ballyporeen , Co Tipperary |
(1) the relocation of the existing polytunnel currently situated south of the creche to a new location on the green west of the creche, (2) the construction of two new prefabricated log cabins, one shall be situated to the south of the creche and the se... login required. |
Details... |
50m |
17/10/2023 |
N/A |
Glenacunna Ballyporeen , Cahir , Co. Tipperary |
a new two storey-dwelling, wastewater treatment system with percolation area, the change of use of existing single storey bungalow into an office and all associated site works... login required. |
Details... |
1.7km |
23/08/2023 |
CONDITIONAL |
Upper Main St , Ballyporeen , Co. Tipperary |
the following: 1) demolish existing dwelling house & agricultural sheds, 2) construct 4no. 3 bedroom terraced dwellings, 3) new site entrance, 4) roadside boundary works, 5) public sewer connection, 6) and all associated works... login required. |
Details... |
80m |
03/08/2023 |
N/A |
Glenacunna Ballyporeen , Cahir , Co. Tipperary |
a new two storey-dwelling, wastewater treatment system with percolation area and all associated site works... login required. |
Details... |
1.7km |
06/07/2023 |
N/A |
Upper Main St , Ballyporeen , Co. Tipperary |
1) demolish existing dwelling house & agricultural sheds, 2) construct 4 no. 3 bedroom terraced dwellings, 3) new site entrance, 4) roadside boundary works, 5) public sewer connection, 6) and all associated works... login required. |
Details... |
1.4km |
22/06/2023 |
CONDITIONAL |
Glenacunna , Ballyporeen , Co. Tipperary |
the construction of a new single-storey dwelling with detached garage, vehicular entrance, septic tank and percolation area, and associated site boundary and site development works... login required. |
Details... |
1.8km |
01/06/2023 |
CONDITIONAL |
River Lane , Riverstown , Ballyporeen Co. Tipperary |
the extension and renovation of existing dwelling and permission to raise the walls and roof of the dwelling to develop first floor accommodation and permission to demol... login required. |
Details... |
1.6km |
13/03/2023 |
CONDITIONAL |
Glenacunna Td. , Ballyporeen , Cahir |
a bungalow as constructed, which was previously granted under planning permission number: P3/1490 and Permission for Retention for extensions to rear and sides (including domestic garage/shed) ... login required. |
Details... |
2.1km |
11/01/2023 |
CONDITIONAL |
Castle Yard , Newcastle , Ballyporeen |
three detached dwellings and associated works ... login required. |
Details... |
2km |
06/12/2022 |
N/A |
Main Street , Ballyporeen , Co. Tipperary |
the refurbishment of Ballyporeen Old School Boys National School (2 no. rooms) to modern standard. Erect new fencing segregating old from new school and replace neighbouring fence with screen fence. Construct 1.8m walkway path on side with ... login required. |
Details... |
2km |
12/10/2022 |
N/A |
Main Street , Ballyporeen , Co. Tipperary |
the refurbishment of Ballyporeen Old School Boys National School (2 no. rooms) to modern standard. Erect new fencing segregating old from new school and replace neighbouring fence with screen fence. Construct 1.8m walkway path on side with ... login required. |
Details... |
2.1km |
08/06/2022 |
N/A |
Castle Yard , Newcastle , Ballyporeen |
three detached dwellings and assoicated works ... login required. |
Details... |
1.8km |
25/02/2022 |
REFUSED |
The Orchards , Main Street , Ballyporeen |
The development consists of; 1) Retention of polytunnel, 2) retention of the open storage of motor vehicles or other objects or substances 3) Retention of a metal storage unit 4) permission to relocate and to extend the metal storage unit ... login required. |
Details... |
2.2km |
14/02/2022 |
CONDITIONAL |
Glenacunna , Ballyporeen , Co. Tipperary |
Construction of a single storey dwelling house with waster water treatment plant and associated services and site entrance ... login required. |
Details... |