2.1km |
09/11/2024 |
N/A |
Toormacleane , New Inn , Ballinasloe |
to create a new field entrance from the public road and all associated site development works... login required. |
Details... |
410m |
28/10/2024 |
N/A |
Castlebin South , New Inn , Co. Galway |
for the change of house plans from those previously permitted under Planning Reference 24/60585 and all associated site works. Gross floor space of proposed works: 184 sqm (house)... login required. |
Details... |
970m |
23/10/2024 |
N/A |
Castlebin East , New Inn , Ballinalsoe |
to 1; construct extension to existing milking facilities shed to cover existing slatted collection area. 2; Construct extension to existing slatted/cubicl... login required. |
Details... |
1.7km |
25/09/2024 |
N/A |
Grange , New Inn , Ballinasloe |
to construct a fully serviced private dwelling house with waste water treatment system and private garage/store to include all associated site works. Gross floor space of proposed works: 207.38 sqm (H) & 53.94 sqm (G)... login required. |
Details... |
510m |
03/09/2024 |
N/A |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 200 sqm (house)... login required. |
Details... |
540m |
22/07/2024 |
REFUSED |
Castlebin South , New Inn , Co. Galway |
of the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 196.00 sqm... login required. |
Details... |
770m |
09/07/2024 |
CONDITIONAL |
Castlebin North , New Inn Ballinasloe , Co. Galway |
to install a new wastewater treatment plant and polishing filter, and to decommission old septic tank and soak pit and all associated site works... login required. |
Details... |
390m |
21/05/2024 |
CONDITIONAL |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 213 sqm (house)... login required. |
Details... |
410m |
21/05/2024 |
CONDITIONAL |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm... login required. |
Details... |
1.7km |
10/05/2024 |
CONDITIONAL |
Grange , New Inn , Ballinasloe |
to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works. Gross floor space of proposed works: (House) 213.98 sqm & (Garage) 22.72 sqm... login required. |
Details... |
2km |
06/03/2024 |
CONDITIONAL |
Toormacleane , New Inn , Ballinasloe |
for the demolition of existing sub-standard out-buildings, renovation and extension of existing derelict dwelling, new sewage treatment system and percolation area, relocation of existing en... login required. |
Details... |
2.3km |
16/02/2024 |
CONDITIONAL |
RATHGLASS , NEW INN , Galway |
to create a new field entrance from the public road. Gross floor space of proposed works: 35sqm... login required. |
Details... |
2.6km |
16/02/2024 |
CONDITIONAL |
Killagh More , Kilconnell Ballinasloe , Co.Galway |
for existing two storey dwelling & detached garage. Permission for demolition of existing dwelling rear two storey block only. Minor alterations & renovation to existing dwelling & garage floor plans to reconfigure layout & alterations to existing elevations to suit. Full planning permission for single storey e... login required. |
Details... |
2.6km |
14/02/2024 |
CONDITIONAL |
Lisnamoltaun , New Inn , Ballinasloe |
to renovate dwelling house and storage shed and install wastewater treatment system to include all associated site works... login required. |
Details... |
2.6km |
22/12/2023 |
CONDITIONAL |
Rathglass , NewInn , Ballinasloe |
to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works. Gross floor space of proposed works: 203.21 sqm (house) & 22.72 sqm (garage)... login required. |
Details... |
2.6km |
22/12/2023 |
CONDITIONAL |
Rathglass , NewInn , Ballinasloe |
to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works. Gross floor space of proposed works: 213.45 sqm... login required. |
Details... |
520m |
13/11/2023 |
CONDITIONAL |
Castlebin South , New Inn , Ballinalsoe |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)... login required. |
Details... |
430m |
13/11/2023 |
CONDITIONAL |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)... login required. |
Details... |
2.7km |
03/10/2023 |
CONDITIONAL |
Rathglass , New Inn , Ballinasloe |
for existing two storey dwelling, detached outbuilding & existing septic tank system. Permission for demolition of existing front door porch, rear kitchen porch & substandard central chimney, minor alterations & renovation to existing dwelling floor plan to reconfigure layout & alterations to existing east, south, west & nor... login required. |
Details... |