2.5km |
09/11/2024 |
N/A |
Toormacleane , New Inn , Ballinasloe |
to create a new field entrance from the public road and all associated site development works... login required. |
Details... |
2.5km |
28/10/2024 |
N/A |
Castlebin South , New Inn , Co. Galway |
for the change of house plans from those previously permitted under Planning Reference 24/60585 and all associated site works. Gross floor space of proposed works: 184 sqm (house)... login required. |
Details... |
2.3km |
23/10/2024 |
N/A |
Castlebin East , New Inn , Ballinalsoe |
to 1; construct extension to existing milking facilities shed to cover existing slatted collection area. 2; Construct extension to existing slatted/cubicl... login required. |
Details... |
2.3km |
03/09/2024 |
N/A |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 200 sqm (house)... login required. |
Details... |
2.3km |
22/07/2024 |
REFUSED |
Castlebin South , New Inn , Co. Galway |
of the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 196.00 sqm... login required. |
Details... |
2.6km |
14/07/2024 |
N/A |
Castlebin South , New Inn , Ballinasloe |
for the construction of 1) a two classroom special educational needs base to the existing school, 2) upgrade of the existing wastewater treatment system including soil polishing filter, 3) upgrade and changes to the r... login required. |
Details... |
2.5km |
10/06/2024 |
CONDITIONAL |
Carra , Bullaun , Loughrea |
for the construction of a single-storey dwelling, domestic garage, new sewage treatment system, percolation area and all associated site development works. Gross floor space of proposed works: 196.00 sqm (house) & 60.00 sqm (garage)... login required. |
Details... |
2.5km |
21/05/2024 |
CONDITIONAL |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 213 sqm (house)... login required. |
Details... |
2.5km |
21/05/2024 |
CONDITIONAL |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm... login required. |
Details... |
2.5km |
06/03/2024 |
CONDITIONAL |
Toormacleane , New Inn , Ballinasloe |
for the demolition of existing sub-standard out-buildings, renovation and extension of existing derelict dwelling, new sewage treatment system and percolation area, relocation of existing en... login required. |
Details... |
680m |
16/02/2024 |
CONDITIONAL |
RATHGLASS , NEW INN , Galway |
to create a new field entrance from the public road. Gross floor space of proposed works: 35sqm... login required. |
Details... |
30m |
22/12/2023 |
CONDITIONAL |
Rathglass , NewInn , Ballinasloe |
to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works. Gross floor space of proposed works: 213.45 sqm... login required. |
Details... |
1km |
25/11/2023 |
CONDITIONAL |
Carra , Bullaun Loughrea , Co. Galway |
of different treatment plant installed on site to that granted in planning reference number 18/1434... login required. |
Details... |
2.4km |
13/11/2023 |
CONDITIONAL |
Castlebin South , New Inn , Ballinalsoe |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)... login required. |
Details... |
2.5km |
13/11/2023 |
CONDITIONAL |
Castlebin South , New Inn , Co. Galway |
for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)... login required. |
Details... |
2.8km |
31/10/2023 |
CONDITIONAL |
Cross , New Inn , Ballinasloe |
to construct a three bay single slatted cattle shed (floor area 104sqm)... login required. |
Details... |
80m |
03/10/2023 |
CONDITIONAL |
Rathglass , New Inn , Ballinasloe |
for existing two storey dwelling, detached outbuilding & existing septic tank system. Permission for demolition of existing front door porch, rear kitchen porch & substandard central chimney, minor alterations & renovation to existing dwelling floor plan to reconfigure layout & alterations to existing east, south, west & nor... login required. |
Details... |
2.7km |
26/04/2023 |
CONDITIONAL |
Castlebin South New Inn , Ballinasloe , Co. Galway |
for change of use of shop to a before & after school childcare facility & all associated site works... login required. |
Details... |
2.5km |
24/03/2023 |
CONDITIONAL |
Castlebin South , New Inn , Ballinasloe Co. Galway |
for: (i) demolition of former public house, shop & hardware store (area of demolished building for which retention permission is 593 sqm) (ii) construction of single storey building comprising convenience shop & retail unit (floor area 392 sqm) & permission for (i) demolition of existing 2 storey office building (area for demolition 230 sqm) (ii) alterations to existing commercial warehouse/workshop building including partial demolition (area for demolition 445 sqm), elevational changes & the change of use from commercial warehouse/workshop to retail warehouse use (area for change of use 195 sqm), (iii) construction of a ... login required. |
Details... |