2.1km |
25/10/2024 |
N/A |
Faheymore North , O’Briensbridge , Co. Clare |
for development at this site Faheymore North, O’Briensbridge, Co. Clare. The development will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to... login required. |
Details... |
1.9km |
05/10/2024 |
N/A |
Knockadereen , Bridgetown Killaloe , Co Clare |
for the construction of a detached 2 storey dwelling, new entrance, bored well, onsite wastewater treatment system, connection to necessary services and all associated ancillary and site works... login required. |
Details... |
1.5km |
08/08/2024 |
N/A |
Fahy Beg , Bridgetown , Co. Clare |
of partially constructed detached dormer dwelling house and PERMISSION for completion of same, onsite wastewater treatment system and percolation area, connection to necessary services, construction of new entrance detail together with all associated ancillary and incidental site works... login required. |
Details... |
2km |
06/08/2024 |
CONDITIONAL |
Ross , O'Briensbridge , County Clare |
for a single dwelling house, attached carport and garage, advanced wastewater treatment system along with ancillary site works... login required. |
Details... |
1.9km |
25/07/2024 |
N/A |
Ryan Inn , O' Brien's Bridge , Co. Clare |
for the change of use of an existing derelict public house for use as a dwelling house. Permission is also being sought for the following to facilitate the change to a dwelling house:- 1) renovation of the existing building to include elevational changes; 2) demolition of existing single storey extension to the rear; 3) construction of a single storey exten... login required. |
Details... |
2km |
28/06/2024 |
N/A |
O'Briensbridge , Co. Clare |
for development, the development consists of a new floating mooring for canoe, row boat and small craft access, access platform and gangway upgrade of existing onshore access path. A Natura Impact Statement and Ecological Impact Assessment have been prepared in respect of the proposed development... login required. |
Details... |
2.2km |
07/06/2024 |
N/A |
Ardataggle , Bridgetown , Co. Clare V94 DD2R |
to construct an extension and alterations to existing house, amendment to existing vehicular entrance, and all associated site development works... login required. |
Details... |
970m |
07/12/2023 |
CONDITIONAL |
Fahybeg , Bridgetown , Co Clare |
for the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works... login required. |
Details... |
2.9km |
28/11/2023 |
N/A |
Portcrusha , Montpelier , Co. Limerick |
the construction of a vehicular entrance off private driveway, dwelling house, domestic waste water treatment system & polishing filter together with all associated site works... login required. |
Details... |
1.2km |
12/10/2023 |
CONDITIONAL |
Bridgetown , O Briensbridge , Co. Clare |
for the construction of 4 new dwellings, new vehicular entrance, pedestrian access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works.... login required. |
Details... |
2km |
08/08/2023 |
REFUSED |
Ard na Taggle , O'Briensbridge , Co Clare |
to Extend the Appropriate Period of Planning Permission for P18/178 for the construction of a 44 bedroom two storey over part basement nursing home ( floor area = 3161m2), a standalone single storey services building ( floor area = 40m2 ), a standalone single storey grounds keeping store ( floor area = 22m2), together with the provision a proprietary waste water treatment sys... login required. |
Details... |
0m |
09/06/2023 |
CONDITIONAL |
Clonboy , Bridgetown , Co Clare |
for to erect an extension to the side of house and all associated site works... login required. |
Details... |
2.8km |
17/05/2023 |
N/A |
Montpelier , Castleconnell , Co. Limerick |
a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
1.7km |
12/05/2023 |
CONDITIONAL |
Knockadrohid , O'Briens Bridge , Co. Clare V94 PF7K |
for change of use from residential dwelling to Long-term residential care facility for people with disabilities and retain existing rear extension all as per drawing documentation submitted together with all ancillary site works and services.... login required. |
Details... |
2km |
12/05/2023 |
N/A |
O'Briensbridge , Co Clare |
for development the development consists of a new floating mooring for canoe, row boat and small craft access, access platform and gangway, upgrade of existing onshore access path. A Natura Impact Statement and Ecological Impact Assessment have prepared in respect of the proposed development ... login required. |
Details... |
2.3km |
12/04/2023 |
N/A |
Fahy More North Td , Bridgetown , Co Clare |
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, using existing site entrance, including all ancillary site works... login required. |
Details... |
2.4km |
05/04/2023 |
CONDITIONAL |
Ardcloony , Killaloe , Co. Clare |
for development which will consist of a new single storey dwelling house and a new waste water treatment system and a new vehicular and pedestrian entrance onto the public road and all associated site works... login required. |
Details... |
2.4km |
09/03/2023 |
REFUSED |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Sec... login required. |
Details... |
1.2km |
06/03/2023 |
N/A |
Bridgetown , O'Brien's Bridge , Co Clare |
for the construction of 9 New Dwellings, New Vehicular Entrance, Pedestrian Access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works ... login required. |
Details... |