280m |
25/10/2024 |
N/A |
Faheymore North , O’Briensbridge , Co. Clare |
for development at this site Faheymore North, O’Briensbridge, Co. Clare. The development will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to... login required. |
Details... |
860m |
08/08/2024 |
N/A |
Fahy Beg , Bridgetown , Co. Clare |
of partially constructed detached dormer dwelling house and PERMISSION for completion of same, onsite wastewater treatment system and percolation area, connection to necessary services, construction of new entrance detail together with all associated ancillary and incidental site works... login required. |
Details... |
1.1km |
07/06/2024 |
N/A |
Ardataggle , Bridgetown , Co. Clare V94 DD2R |
to construct an extension and alterations to existing house, amendment to existing vehicular entrance, and all associated site development works... login required. |
Details... |
2.6km |
22/05/2024 |
N/A |
Ballymaloney & Ballyquin More , Kilbane , Co. Clare |
for the phased extraction of 2.9 hectares of sand and gravel over a period of 7 years, on land located in the townland of Ballymaloney. The proposed development includes for the provision of a new site entrance and vehicular access road; on site wheel wash facility; new drainage channel, silt fence and settlement ... login required. |
Details... |
1.6km |
07/05/2024 |
REFUSED |
Ballybrack Td , O'Briensbridge , Co Clare |
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works... login required. |
Details... |
1.5km |
07/12/2023 |
CONDITIONAL |
Fahybeg , Bridgetown , Co Clare |
for the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works... login required. |
Details... |
3km |
27/11/2023 |
REFUSED |
Ballymoloney , Broadford , Co Clare |
for to demolish old "outhouses", extend existing dwelling house, install an effluent system, new entrance and all associated site works ... login required. |
Details... |
1.7km |
12/10/2023 |
CONDITIONAL |
Bridgetown , O Briensbridge , Co. Clare |
for the construction of 4 new dwellings, new vehicular entrance, pedestrian access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works.... login required. |
Details... |
2km |
12/09/2023 |
REFUSED |
Fahy More , Kilmore , Co. Clare |
for the construction of a detached single storey dwelling, detached domestic garage, new entrance, onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works... login required. |
Details... |
1.8km |
23/06/2023 |
CONDITIONAL |
Leitrim , Kilmore , Co Clare |
for the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works ... login required. |
Details... |
2.3km |
09/06/2023 |
CONDITIONAL |
Clonboy , Bridgetown , Co Clare |
for to erect an extension to the side of house and all associated site works... login required. |
Details... |
2.3km |
15/05/2023 |
N/A |
Clonboy , Bridgetown , Co Clare |
for to erect an extension to the side of house and all associated site works... login required. |
Details... |
2km |
23/03/2023 |
CONDITIONAL |
Springmount , Kilmore , County Clare |
to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works... login required. |
Details... |
1.3km |
09/03/2023 |
REFUSED |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Sec... login required. |
Details... |
1.8km |
06/03/2023 |
N/A |
Bridgetown , O'Brien's Bridge , Co Clare |
for the construction of 9 New Dwellings, New Vehicular Entrance, Pedestrian Access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works ... login required. |
Details... |
0m |
01/03/2023 |
N/A |
Fahy More North Td , Bridgetown , Co Clare |
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, using existing site entrance, including all ancillary site works... login required. |
Details... |
2.1km |
16/02/2023 |
N/A |
Ballybrack , Clonlara , Co. Clare |
to RETAIN (a) importation of inert material to site of 17.05.04 2,700 tons and (b) permission to import inert materials to site to improve the lands for good agricultural land ... login required. |
Details... |
2.8km |
03/02/2023 |
N/A |
Aughboy , Clonlara , Co. Clare |
for the demolition of existing semi-derelict dwelling house, construction of replacement detached dormer dwelling house, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, together with all associated ancillary and incidental site works... login required. |
Details... |
1.3km |
13/01/2023 |
N/A |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghers) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including welfare facilities, electrical infrastructure, parking, wastewater holding tank, rainwater harvesting tank, sec... login required. |
Details... |