2.4km |
29/10/2024 |
N/A |
Ballykildea , Killaloe , Co. Clare |
Application to RETAIN existing Garden shed, all associated site works at above address... login required. |
Details... |
3km |
05/10/2024 |
N/A |
Knockadereen , Bridgetown Killaloe , Co Clare |
for the construction of a detached 2 storey dwelling, new entrance, bored well, onsite wastewater treatment system, connection to necessary services and all associated ancillary and site works... login required. |
Details... |
2.2km |
29/08/2024 |
REFUSED |
In the Townlands of Kilbane Killeagy (Ryan) Shannaknock , Killeagy (Stritch) Killeagy (Goonan) Ballymoloney , Magherareagh and Lackareagh Beg Co. Clare. |
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure,
wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational a... login required. |
Details... |
2.4km |
23/08/2024 |
N/A |
Ballykildea , Killaloe , Co. Clare |
to erect a dwelling house and garage, install an effluent system and all associated site works... login required. |
Details... |
2.2km |
21/08/2024 |
N/A |
Kilbane Killeagy (Ryan) Shannaknock Killeagy (Stritch) , Killeagy (Goonan) Ballymoloney Magherareagh and Lackareagh Beg , Co. Clare. |
a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind turbines with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 No. permanent 38kV electrical substation including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank and all ancillary works, in the townland of Killeagy (Goonan), Co Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 No. permanent meteorological mast of c. 36.5m in height, associat... login required. |
Details... |
2.9km |
03/06/2024 |
CONDITIONAL |
Gortmagy , Hill Road , Killaloe Co. Clare |
to erect a dwellinghouse including car port and home office, install an effluent system and and percolation area entrance and all associated site works... login required. |
Details... |
2.4km |
17/01/2024 |
REFUSED |
Ballykildea , Killaloe , Co Clare |
to extend the appropriate period of planning for P18/591 to construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works... login required. |
Details... |
2.2km |
19/10/2023 |
CONDITIONAL |
Killeagy (Goonan) , Co. Clare |
for development which will consist of: 1. The erection of a temporary 100m high lattice type meteorological mast for a period of 5 years which will be fixed to ground anchors ... login required. |
Details... |
2.6km |
18/07/2023 |
CONDITIONAL |
Lackenbaun , Killaloe , Co. Clare |
of extensions to the front, side and rear of their house and permission to retain steel framed shed to the rear of their house, and also for PERMISSION to replace existing sub standard septic tank with an effluent treatment system and soil polishing filter and all associated site works... login required. |
Details... |
2.9km |
15/03/2023 |
REFUSED |
Gortmagee , Hill Road , Killaloe Co Clare |
to raise the level of the land for agricultural purposes by infilling low lying land with topsoil, subsoil, rock and construction rubble and carry out associated site works in accordance with the submitted details... login required. |
Details... |
2km |
01/03/2023 |
N/A |
Ballykildea , Killaloe , Co. Clare |
for as-constructed detached stable building, new agricultural entrance and agricultural roadway, sand ring together with all associated incidental and site works... login required. |
Details... |
3km |
14/09/2022 |
CONDITIONAL |
Lackenbaun , Killaloe , Co Clare |
to (i) amend the design of the glamping pods and toilet block (ii) amend the site layout of planning permission as granted under Planning Reg. Ref. P21-900... login required. |
Details... |
2km |
07/09/2022 |
CONDITIONAL |
Gaarraunboy , Killaloe , Co. Clare |
of agricultural stables and sand arena as constructed ... login required. |
Details... |
3km |
26/08/2021 |
CONDITIONAL |
Lackenbawn , Killaloe , Co Clare |
to apply for six glamping pods, toilet block, car parking area, vehicular access, wastewater treatment plant, and ancillary site works... login required. |
Details... |
1.9km |
03/08/2021 |
CONDITIONAL |
Ballygarreen , Killaloe , Co Clare |
of two storey extension as constructed to existing house and all associated site works... login required. |
Details... |
2.4km |
25/06/2021 |
CONDITIONAL |
An Teach Nua , Garraunboy , Killaloe Co Clare |
to RETAIN an existing two storey dwelling as constructed, and PERMISSION for the construction of a new single storey extension to the side of the existing dwelling and the incorporation of a new window to the gable of the dwelling... login required. |
Details... |
1.8km |
24/05/2021 |
CONDITIONAL |
Ballykildea , Killaloe , Co Clare |
for the development of a private garage and polytunnel and associated site works... login required. |
Details... |
910m |
14/05/2021 |
CONDITIONAL |
The Glen School , Lackareagh Beg , Killaloe Co Clare |
to RETAIN relocated site entrance, PERMISSION for new circa 2m high rendered blockwork boundary wall adjacent to existing house, RETENTION of additional roof lights to existing ... login required. |
Details... |
2.4km |
09/04/2021 |
N/A |
An Teach Nua , Garraunboy , Killaloe Co Clare |
for the construction of a single storey extension to the side of an existing dwelling ... login required. |
Details... |