580m |
29/08/2024 |
REFUSED |
In the Townlands of Kilbane Killeagy (Ryan) Shannaknock , Killeagy (Stritch) Killeagy (Goonan) Ballymoloney , Magherareagh and Lackareagh Beg Co. Clare. |
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure,
wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational a... login required. |
Details... |
580m |
21/08/2024 |
N/A |
Kilbane Killeagy (Ryan) Shannaknock Killeagy (Stritch) , Killeagy (Goonan) Ballymoloney Magherareagh and Lackareagh Beg , Co. Clare. |
a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind turbines with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 No. permanent 38kV electrical substation including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank and all ancillary works, in the townland of Killeagy (Goonan), Co Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 No. permanent meteorological mast of c. 36.5m in height, associat... login required. |
Details... |
1.7km |
22/05/2024 |
N/A |
Ballymaloney & Ballyquin More , Kilbane , Co. Clare |
for the phased extraction of 2.9 hectares of sand and gravel over a period of 7 years, on land located in the townland of Ballymaloney. The proposed development includes for the provision of a new site entrance and vehicular access road; on site wheel wash facility; new drainage channel, silt fence and settlement ... login required. |
Details... |
1.4km |
27/11/2023 |
REFUSED |
Ballymoloney , Broadford , Co Clare |
for to demolish old "outhouses", extend existing dwelling house, install an effluent system, new entrance and all associated site works ... login required. |
Details... |
2.5km |
09/03/2023 |
REFUSED |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Sec... login required. |
Details... |
2.5km |
13/01/2023 |
N/A |
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghers) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed |
for development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including welfare facilities, electrical infrastructure, parking, wastewater holding tank, rainwater harvesting tank, sec... login required. |
Details... |
1.5km |
23/08/2022 |
CONDITIONAL |
Kilbane , Broadford , Co Clare |
for construction of a new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works... login required. |
Details... |
1.5km |
09/08/2022 |
CONDITIONAL |
Kilbane , Broadford , Co Clare |
for construction of new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works ... login required. |
Details... |
1.6km |
25/05/2022 |
CONDITIONAL |
Kilbane , Broadford , Co Clare |
to erect a dwelling house, garage, entrance, install an effluent treatment system and percolation area and all associated site works... login required. |
Details... |
1.5km |
06/05/2022 |
CONDITIONAL |
Kilbane , Broadford , Co Clare |
for detached single storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, new entrance together with all associated ancillary and incidental site works... login required. |
Details... |
1.7km |
14/07/2021 |
CONDITIONAL |
St. Joseph's NS , Kilbane , Co Clare V94 P791 |
to convert St. Joseph's National School to dwelling house and carry out all ancillary site works ... login required. |
Details... |
2.2km |
28/06/2021 |
CONDITIONAL |
Aillemore , Killaloe , Co. Clare |
to erect a dwelling house, garage, driveway, install a septic tank and percolation area and all associated works... login required. |
Details... |
2.2km |
14/05/2021 |
CONDITIONAL |
The Glen School , Lackareagh Beg , Killaloe Co Clare |
to RETAIN relocated site entrance, PERMISSION for new circa 2m high rendered blockwork boundary wall adjacent to existing house, RETENTION of additional roof lights to existing ... login required. |
Details... |
2.2km |
15/01/2021 |
CONDITIONAL |
Ballyquin More , Kilbane , Broadford Co Clare |
to RETAIN alterations to elevations and roof of existing house together with all associated site works... login required. |
Details... |
1.4km |
15/01/2021 |
CONDITIONAL |
Killeagy (Goonan) , Kilbane , Broadford Co Clare |
for the demolition of existing shed and construction of a single storey extension to rear of house together with all associated site works... login required. |
Details... |