520m |
15/10/2024 |
N/A |
Unit 8 , Hollyhill Industrial Estate , Hollyhill |
permission for 1) the erection of two roof mounted insulated chimneys 2)two diesel storage tanks each with a capacity of 10000 litres 3)two water storage tanks each with the capacity of 10000 litres 4) one bund area consisting of a total capacity of 11000 litres. additionally permission is sought for the rete... login required. |
Details... |
600m |
12/03/2024 |
CONDITIONAL |
Faggott Hill , Clogheen , Co. Cork |
Permission is sought for the demolition of adjoining garage and office, elevational alterations including: new bay window extension to south elevation, alter hipped roof, all to ex... login required. |
Details... |
480m |
22/01/2024 |
REFUSED |
Hollymount Industrial Estate , Hollyhill , Cork City |
Permission is sought for: (1) An increase in the permitted tonnage of end-of-life tyres from 2500 tonnes per annum (permitted under planning reference 11/34954) to 7000 tonnes per annum; (2) Installation of a proposed Petrol Interceptor at Hollymount Industrial Estate, Hollyhill, Cork. Retention p... login required. |
Details... |
470m |
19/12/2023 |
CONDITIONAL |
Units 5 and 6 , Clogheen Business Park , Blarney Road |
Permission to (1) Demolish an existing single-storey storage building (34 sqm) to western side of existing warehouse and 2 no. internal first-floor storage mezzanines (194 sqm), (2) Remove existing office portacabin (58 sqm), (3) Construct a two-storey extension (293 sqm) to existing warehouse to house offices and staff fac... login required. |
Details... |
520m |
07/09/2023 |
CONDITIONAL |
Hollymount Industrial Estate , Hollyhill , Cork |
Permission for the demolition of part of an existing warehousing building and the construction of a new extension to the warehousing building including a cantilever canopy, waste enclosure with a roof level generator within a plant enclosure and all associated site development works at the Hollymount Industrial Estate, Hollyhill, Cork. The proposed use of new extension includes warehouse space and a central f... login required. |
Details... |
720m |
09/03/2023 |
CONDITIONAL |
No.1 Ardcullen Close , Hollyhill , Cork |
Permission for the demolition of an existing rear single-storey extension, removal of 2 no. existing sheds at the rear, construction of a rear two-stor... login required. |
Details... |
320m |
17/02/2023 |
CONDITIONAL |
Hollymount 2 , Hollymount Industrial Estate , Hollyhill |
Permission for modifications to and the expansion of the existing plant compound permitted by Ref. No. 21/39966 and all associated site development works at Hollymount 2, Hollymount Industrial Estate, Hollyhill, Cork. The proposed works consist of: (1) The construction of an expanded plant compound and the installation of (A) Condenser units, (B) ... login required. |
Details... |
480m |
19/09/2022 |
CONDITIONAL |
Units 5 and 6 , Clogheen Business Park , Blarney Road |
Permission to install rooftop photovoltaic solar panel arrays consisting of approximately 1,759 sqm of photovoltaic solar panels and associated fall arrest systems fixed to the existing roof slopes of existing buildings.... login required. |
Details... |
880m |
07/09/2022 |
CONDITIONAL |
Old Blarney Road , Clogheen , Co. Cork |
Permission is sought for the construction of a new dwelling, treatment system, domestic entrance and all associated site works.... login required. |
Details... |
160m |
24/05/2022 |
CONDITIONAL |
Hollyhill Industrial Estate , Tadgh Barry Road and lands , adjacent to David McCarthy Road and |
Permission for the construction of a four storey over partial lower ground floor level office building providing office space, meeting rooms, staff welfare, service areas and all ancillary site development works. The proposed office building will be constructed within the existing carpark and will connect to an existing office building known as ‘HH4’ to the southeast by way of a cantilevered link corridor at first floor level resulting in façade amendments and internal reconfigurations to the existing ‘HH4’ building. A central pedestrian avenue will also be provided between the existing and proposed building. The proposed development includes a single storey commute hub building providing bicycle/scooter parking, storage and staff facilities serving the wider Apple campus, a single storey energy centre building and 2 no. single storey security huts. A new surface car park on lands to the ... login required. |
Details... |
540m |
26/04/2022 |
CONDITIONAL |
113 Ardcullen , Hollyhill , Co.Cork |
Retention permission for development of this site at: 113 Ardcullen, Hollyhill, Co.Cork, T23H96V. The development consists of : Permission for the retention of (1) A singl... login required. |
Details... |
770m |
23/02/2022 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission for the construction of a wastewater pumping station and associated site works on part of a site originally granted permission under Planning Reg. No.'s 16/37010 and 21/40555.... login required. |
Details... |
220m |
15/02/2022 |
CONDITIONAL |
Hollymount 2 , (The Former Banta Site) , Hollymount Industrial Estate |
Permission for the construction of a new substation building consisting of a medium voltage switchroom and electrical distribution room and all associated site development works.... login required. |
Details... |
760m |
08/10/2021 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission on a site located at Mile Stream, Shanakiel, Cork City. Planning permission is sought for the following, (1) Minor amendments to house typologies previously permitted under planning ref: 16/37010. The amendments will include minor internal... login required. |
Details... |
760m |
15/09/2021 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission for the following, (1) The demolition of 4 no. unfinished 2-storey semi-detached dwelling houses, (2) The construction of 4 no. 2 storey semi-detached dwelling houses (c... login required. |
Details... |
530m |
14/07/2021 |
CONDITIONAL |
Hollymount Industrial Estate , Blarney Road , Cork |
Permission for development to consist of 1010m2 (543 No) of roof mounted Solar PV panels and all associated works across 2 roofs... login required. |
Details... |
880m |
11/05/2021 |
REFUSED |
Old Blarney Road , Clogheen , Co.Cork |
Permission for the construction of a new dwelling, treatment system, domestic entrance and all associated site works.... login required. |
Details... |
740m |
10/03/2021 |
REFUSED |
"The Arches" , Mount Desert , Clogheen (Old Blarney Road) |
Permission to construct 2 no. additional apartments for short term/holiday letting on my site together with the installation of a new wastewater treatment system and percolation Area, all associated site works including the provision of 27 car parking spaces to new extended site area... login required. |
Details... |
320m |
02/03/2021 |
CONDITIONAL |
The Former Banta Site , Hollymount Industrial Estate , Hollyhill |
Permission for modifications to the existing warehouse building and all ancillary site development works at the Former Banta site, Hollymount Industrial Estate, Hollyhill, Cork. The proposed development consists of a change of use of part of the existing warehouse building to use as a testing and measurement facility with ancillary office use and modifications to the building consisting of: the construction of a new mezzanine floor; and modifications to the façade including (1) New windows at first floor level, relocation of doors and opening... login required. |
Details... |