270m |
15/10/2024 |
N/A |
Unit 8 , Hollyhill Industrial Estate , Hollyhill |
permission for 1) the erection of two roof mounted insulated chimneys 2)two diesel storage tanks each with a capacity of 10000 litres 3)two water storage tanks each with the capacity of 10000 litres 4) one bund area consisting of a total capacity of 11000 litres. additionally permission is sought for the rete... login required. |
Details... |
950m |
23/07/2024 |
N/A |
221 Blarney Road , Sunday's Well , Cork |
Permission for change of use of existing building previously known Kennedy's bar to an Off Licence... login required. |
Details... |
930m |
26/03/2024 |
CONDITIONAL |
Former Saint Kevins Hospital , and grounds , Shanakiel |
Permission for a Large-Scale Residential Development comprising amendments to a permitted Strategic Housing Development of 265 no. units (An Bord Pleanála Ref: 308923- 20) on the site of the Former St Kevin’s Hospital and Grounds, Shanakiel, Cork (A Protected Structure, ‘Saint Kevin’s Hospital’ RPS Ref. PS1154). The proposed amendments include: Replacement of the permitted Block G (A c. 1072.5sq m, 3 no. storey apartment building comprising 5 no. two bedroom duplex apartments and 5 no. four bedroom duplex apartments) with 6 no. two storey townhouses (4 no. three bedroom, 2 no. four bedroom townhouses, cumulatively c. 675.2sq m) including associated private amenity space. The proposed development will also comprise of the internal reconfiguration and change of use of the permitted ground floor creche within the Former St Kevin’s Hospital building (c. 440 sq m; RPS r... login required. |
Details... |
560m |
12/03/2024 |
CONDITIONAL |
Faggott Hill , Clogheen , Co. Cork |
Permission is sought for the demolition of adjoining garage and office, elevational alterations including: new bay window extension to south elevation, alter hipped roof, all to ex... login required. |
Details... |
160m |
22/01/2024 |
REFUSED |
Hollymount Industrial Estate , Hollyhill , Cork City |
Permission is sought for: (1) An increase in the permitted tonnage of end-of-life tyres from 2500 tonnes per annum (permitted under planning reference 11/34954) to 7000 tonnes per annum; (2) Installation of a proposed Petrol Interceptor at Hollymount Industrial Estate, Hollyhill, Cork. Retention p... login required. |
Details... |
180m |
19/12/2023 |
CONDITIONAL |
Units 5 and 6 , Clogheen Business Park , Blarney Road |
Permission to (1) Demolish an existing single-storey storage building (34 sqm) to western side of existing warehouse and 2 no. internal first-floor storage mezzanines (194 sqm), (2) Remove existing office portacabin (58 sqm), (3) Construct a two-storey extension (293 sqm) to existing warehouse to house offices and staff fac... login required. |
Details... |
320m |
14/12/2023 |
CONDITIONAL |
Hollyhill Industrial Estate , Kilmore Heights , Hollyhill |
Permission for the construction of a new substation building within a car park permitted under Council Ref: 22/41121 to cater for additional electrical vehicle (EV) charging points at Hollyhill... login required. |
Details... |
220m |
07/09/2023 |
CONDITIONAL |
Hollymount Industrial Estate , Hollyhill , Cork |
Permission for the demolition of part of an existing warehousing building and the construction of a new extension to the warehousing building including a cantilever canopy, waste enclosure with a roof level generator within a plant enclosure and all associated site development works at the Hollymount Industrial Estate, Hollyhill, Cork. The proposed use of new extension includes warehouse space and a central f... login required. |
Details... |
980m |
16/06/2023 |
CONDITIONAL |
Heather House , St. Marys Campus , Gurranabraher |
Permission is sought by the Health Service Executive for the construction of a day room and link corridor extension at ground level (95.5sqm) and retention of 2 no. walled bin enclosures (27.5sqm + 26.0sqm) to t... login required. |
Details... |
520m |
09/03/2023 |
CONDITIONAL |
No.1 Ardcullen Close , Hollyhill , Cork |
Permission for the demolition of an existing rear single-storey extension, removal of 2 no. existing sheds at the rear, construction of a rear two-stor... login required. |
Details... |
20m |
17/02/2023 |
CONDITIONAL |
Hollymount 2 , Hollymount Industrial Estate , Hollyhill |
Permission for modifications to and the expansion of the existing plant compound permitted by Ref. No. 21/39966 and all associated site development works at Hollymount 2, Hollymount Industrial Estate, Hollyhill, Cork. The proposed works consist of: (1) The construction of an expanded plant compound and the installation of (A) Condenser units, (B) ... login required. |
Details... |
960m |
01/02/2023 |
CONDITIONAL |
4 Hollyhill Lane , Blarney Street , Cork |
Retention is sought for a single-storey extension to the rear of the dwelling.... login required. |
Details... |
900m |
23/12/2022 |
CONDITIONAL |
No.7 Shanakiel Park , Shanakiel , Cork |
Permission for to construct new side ground floor window, new first-floor front and rear bedroom extensions to existing semi-detached dwelling.... login required. |
Details... |
190m |
19/09/2022 |
CONDITIONAL |
Units 5 and 6 , Clogheen Business Park , Blarney Road |
Permission to install rooftop photovoltaic solar panel arrays consisting of approximately 1,759 sqm of photovoltaic solar panels and associated fall arrest systems fixed to the existing roof slopes of existing buildings.... login required. |
Details... |
950m |
07/09/2022 |
CONDITIONAL |
Old Blarney Road , Clogheen , Co. Cork |
Permission is sought for the construction of a new dwelling, treatment system, domestic entrance and all associated site works.... login required. |
Details... |
360m |
24/05/2022 |
CONDITIONAL |
Hollyhill Industrial Estate , Tadgh Barry Road and lands , adjacent to David McCarthy Road and |
Permission for the construction of a four storey over partial lower ground floor level office building providing office space, meeting rooms, staff welfare, service areas and all ancillary site development works. The proposed office building will be constructed within the existing carpark and will connect to an existing office building known as ‘HH4’ to the southeast by way of a cantilevered link corridor at first floor level resulting in façade amendments and internal reconfigurations to the existing ‘HH4’ building. A central pedestrian avenue will also be provided between the existing and proposed building. The proposed development includes a single storey commute hub building providing bicycle/scooter parking, storage and staff facilities serving the wider Apple campus, a single storey energy centre building and 2 no. single storey security huts. A new surface car park on lands to the ... login required. |
Details... |
440m |
26/04/2022 |
CONDITIONAL |
113 Ardcullen , Hollyhill , Co.Cork |
Retention permission for development of this site at: 113 Ardcullen, Hollyhill, Co.Cork, T23H96V. The development consists of : Permission for the retention of (1) A singl... login required. |
Details... |
910m |
20/04/2022 |
CONDITIONAL |
231 Blarney Road , Cork |
Permission for ground and first floor extensions and alterations to rear of existing two storey dwelling house with associated site works.... login required. |
Details... |
450m |
23/02/2022 |
CONDITIONAL |
Mile Stream , Shanakiel , Cork City |
Permission for the construction of a wastewater pumping station and associated site works on part of a site originally granted permission under Planning Reg. No.'s 16/37010 and 21/40555.... login required. |
Details... |
100m |
15/02/2022 |
CONDITIONAL |
Hollymount 2 , (The Former Banta Site) , Hollymount Industrial Estate |
Permission for the construction of a new substation building consisting of a medium voltage switchroom and electrical distribution room and all associated site development works.... login required. |
Details... |