2.8km |
09/10/2024 |
N/A |
Belrose, Innishannon, Co.Cork, |
Permission for retention of 1) two-storey extension to rear of existing two-storey farmhouse and 2) elevational alterations to existing two-storey farmhouse... login required. |
Details... |
2.1km |
07/10/2024 |
N/A |
Kilmore, Brinny, Co Cork, |
1) Permission for retention and continued use of the existing processing plant and related water management system, the existing concrete plant and ancillary buildings, site access and all related ancillary works/facilities (wheel wash, bunded fuel storage with hydrocarbon interceptor, weighbridge, etc.) permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising recycling of c. 15,000 tonnes of ... login required. |
Details... |
1.3km |
19/07/2024 |
Conditional Permission |
Lissaniskey, Innishannon, Co. Cork, |
Retention Permission for existing single storey prefabricated building used for child minding purpose ancillary to existing creche facility and for associated site works.... login required. |
Details... |
1.5km |
07/06/2024 |
Conditional Permission |
Brinny, Innishannon, Co. Cork, |
Permission for the installation of 8 no. floodlight to existing pitch, a generator and all site works.... login required. |
Details... |
2.1km |
31/05/2024 |
Conditional Permission |
Kill, Innishannon, Co. Cork, |
Permission for Retention of a front porch to an existing dwelling house and all associated site works.... login required. |
Details... |
2.1km |
08/05/2024 |
Conditional Permission |
Dunkereen, Innishannon, Co.Cork, |
Permission for : 1) Retention of ground floor & first floor extensions consisting of new roof, dormer windows and rooflights and for, 2) Internal alterations consisting of ground floor extension... login required. |
Details... |
2.3km |
24/04/2024 |
N/A |
Kilmore, Brinny, Co Cork, |
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (Pl.Ref.No. S/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of existing access; importation of c. 180,000 tonnes of inert soil ... login required. |
Details... |
1.2km |
12/12/2023 |
Conditional Permission |
A site of c. 8.75 ha located at lands Brinny, Innishannon, Co.Cork, |
Permission for the construction of a solar PV energy development comprising the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries, inverters, transformer stations, all ancillary underground cabling and ducting, internal site access tracks, perimeter security fencing, secur... login required. |
Details... |
2.8km |
08/12/2023 |
N/A |
Belrose House, Belrose, Innishannon, Co Cork |
Works to existing dwelling to comprise reconstruction of roof to facilitate increase in height of building, modifications to elevations, construction of part-single storey extension, part two-storey extension to said dwelling and all associated site works.... login required. |
Details... |
1.7km |
20/11/2023 |
Conditional Permission |
Rockfort, Innishannon, Co. Cork, |
The development consists of the proposed construction of a new detached dwelling house, detached garage, provision of waste water treatment unit with percolation area and all associated site works.... login required. |
Details... |
1.7km |
19/10/2023 |
Conditional Permission |
Brianville Lodge, Garryhankard, Upton, Co. Cork |
The development will consist of a new entrance consisting of a gate, support pillars, sidewalls, and end pillars.... login required. |
Details... |
1.9km |
24/08/2023 |
Conditional Permission |
Kilmore, Brinny, Co Cork, |
Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works.... login required. |
Details... |
1.7km |
14/08/2023 |
N/A |
Brianville Lodge, Garryhankard, Upton, Co Cork |
Permission for construction of a new entrance. The development will consist of a new entrance consisting of a gate, support pillars, sidewalls and end pillars.... login required. |
Details... |
1.9km |
04/08/2023 |
N/A |
Kilmore Townland, Brinny, Co.Cork, |
Permission for retention of; a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works... login required. |
Details... |
2.2km |
30/06/2023 |
Conditional Permission |
Kill, Innishannon, Co.Cork, |
Permission for 1) construct a calf rearing shed, 2) to construct a loose house shed for straw/fodder storage and to carry out all associated site works... login required. |
Details... |
1.3km |
27/01/2023 |
Conditional Permission |
Brinny, Innishannon, Co. Cork, |
Demolish existing cottage and construct new two storey dwelling, detached domestic garage/store building, proprietary wastewater treatment system and percolation area, new vehicular entrance from the public road and all ancillary site development works. ... login required. |
Details... |
2km |
13/12/2022 |
Conditional Permission |
Dunkereen, Innishannon, Co.Cork, |
The construction of a one and a half storey domestic garage to side of existing dwelling house... login required. |
Details... |
2km |
11/11/2022 |
N/A |
Dunkereen, Innishannon, Co.Cork, |
The construction of a one and a half-storey domestic garage to side of existing dwelling house... login required. |
Details... |
2.2km |
14/10/2022 |
N/A |
Kilmore, Brinny, Co. Cork, |
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (planning ref. S/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of the existing access; importation of c. 180,000 tonnes of inert soi... login required. |
Details... |