2km |
24/04/2024 |
N/A |
Kilmore, Brinny, Co.Cork, |
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (planning ref s/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of existing access; importation of c. 180,000 tonnes of inert soil... login required. |
Details... |
1.6km |
12/12/2023 |
N/A |
A site of c. 8.75 ha located at lands Brinny, Innishannon, Co.Cork, |
Permission for the construction of a solar PV energy development comprising the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries, inverters, transformer stations, all ancillary underground cabling and ducting, internal site access tracks, perimeter security fencing, secur... login required. |
Details... |
980m |
19/10/2023 |
N/A |
Brianville Lodge, Garryhankard, Upton, Co. Cork |
The development will consist of a new entrance consisting of a gate, support pillars, sidewalls, and end pillars.... login required. |
Details... |
1.8km |
24/08/2023 |
Conditional Permission |
Kilmore, Brinny, Co Cork, |
Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works.... login required. |
Details... |
980m |
14/08/2023 |
N/A |
Brianville Lodge, Garryhankard, Upton, Co Cork |
Permission for construction of a new entrance. The development will consist of a new entrance consisting of a gate, support pillars, sidewalls and end pillars.... login required. |
Details... |
1.8km |
04/08/2023 |
N/A |
Kilmore Townland, Brinny, Co.Cork, |
Permission for retention of; a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works... login required. |
Details... |
2.6km |
12/04/2023 |
Conditional Permission |
Dromkeen, Innishannon, Co. Cork, |
(A) Construction of shed for storage of farm machinery, (B) Construction of silage slab, retaining walls and concrete apron to front for storage of baled silage, (C) Construction of roof over existing dung stead together with all associated site works... login required. |
Details... |
2.9km |
15/03/2023 |
Conditional Permission |
Callatrim, Bandon, Co.Cork, |
Permission for the retention of the following works : a) a front porch and side sunroom extension to an existing dwelling, b) a detached domestic garage, c) all ancillary site works... login required. |
Details... |
2.2km |
08/02/2023 |
Conditional Permission |
Curranure, Innishannon, Co.Cork, |
Permission to construct (i) cubicle shed over existing open tank, (ii) loose shed, (iii) roofed soil water tank and drafting area and all associated site works. Demolition of open tank is also required... login required. |
Details... |
850m |
27/01/2023 |
Conditional Permission |
Brinny, Innishannon, Co. Cork, |
Demolish existing cottage and construct new two storey dwelling, detached domestic garage/store building, proprietary wastewater treatment system and percolation area, new vehicular entrance from the public road and all ancillary site development works. ... login required. |
Details... |
2.6km |
19/12/2022 |
Conditional Permission |
Dromkeen, Innishannon, Co.Cork, |
(1) Retention of Eastern gable addition to bungalow incorporating study, lobby & recessed porch. (2) Retention of North facing pitched roof over front of bungalow in lieu of flat roof previously granted under Plan... login required. |
Details... |
1.7km |
13/12/2022 |
Conditional Permission |
Dunkereen, Innishannon, Co.Cork, |
The construction of a one and a half storey domestic garage to side of existing dwelling house... login required. |
Details... |
2.7km |
12/12/2022 |
Conditional Permission |
Wickle Cottage, Barna, Innishannon, Co. Cork |
Permission for alterations and extensions to dwellinghouse consisting of a ground floor entrance infill extension with a first floor extension over, elevational changes and any associated site works.... login required. |
Details... |
2.6km |
17/11/2022 |
N/A |
Dromkeen, Innishannon, Co. Cork, |
(1) Retention of Eastern gable addition to bungalow incorporating study, lobby & recessed porch. (2) Retention of North facing pitched roof over front of bungalow in lieu of flat roof previously granted under Plan... login required. |
Details... |
1.7km |
11/11/2022 |
N/A |
Dunkereen, Innishannon, Co.Cork, |
The construction of a one and a half-storey domestic garage to side of existing dwelling house... login required. |
Details... |
2.4km |
09/11/2022 |
Conditional Permission |
Plot 35 Dromkeen View, Laherfineen, Innishannon, Co Cork |
The construction of a dwelling house (increase in floor area from that permitted by Pl.Reg.No. 20/5851 which superseded Pl.Reg.No. 05/9838 (as extended under Pl.Reg.No. 14/5861)). Access to proposed development will be via the existing Barr na Claise estate entrance and internal road.... login required. |
Details... |
1.7km |
14/10/2022 |
Refused |
Clashanimud, Knockavilla, Innishannon, Co.Cork |
The construction of a single dwelling house, the construction of a detached domestic garage, the construction of a site entrance, the installation of a private well, the installation of a wastewater treatment unit and associated soil polishing filter, and all ancillary site works... login required. |
Details... |
1.6km |
14/10/2022 |
N/A |
Kilmore, Brinny, Co. Cork, |
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (planning ref. S/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of the existing access; importation of c. 180,000 tonnes of inert soi... login required. |
Details... |
1.8km |
05/09/2022 |
N/A |
Kilmore, Brinny, Co. Cork, |
The proposed development will comprise an extension (extraction area c. 10.8 hectares) of the existing sand & gravel pit (planning ref. S/02/1023); completion of extraction within the existing sand & gravel pit; continuance of use of the existing processing plant and related water management system; continuance of use of the existing concrete plant and ancillary buildings; continuance of use of the existing access; importation of c. 180,000 tonnes of inert soi... login required. |
Details... |