1.2km |
07/11/2024 |
N/A |
19-21 UPPER MAIN STREET , LETTERKENNY , CO. DONEGAL |
DEMOLITION AND REINSTATEMENT OF THE EXISTING FRONT WALL STRUCTURE AND THE REMOVAL AND REINSTATEMENT OF THE EXISTING PITCHED ROOF STRUCTURE, INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
970m |
04/11/2024 |
N/A |
RAMELTON ROAD , LETTERKENNY , CO. DONEGAL |
(1) CONSTRUCTION OF (A) A NEW BUILDING TO PROVIDE 32 NO. STUDENT APARTMENTS AND (B) ANCILLARY AND ASSOCIATED ACCOMMODATION TO THE STUDENT APARTMENTS INCLUDING A DAY ROOM, SERVERY, LAUNDRY ROOM, I.T. ROOM AND PLANT ROOM, (2) PROVISION OF (A) A NEW FOUL SEWER CONNECTION TO TH... login required. |
Details... |
1.4km |
22/10/2024 |
N/A |
KILTOY , LETTERKENNY , CO. DONEGAL |
CONSTRUCTION OF 2 NO. EXTENSIONS TO EXISTING STORAGE CENTRE WITH ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2.3km |
21/10/2024 |
N/A |
CARRYGALLEY , LETTERKENNY , CO. DONEGAL |
(1) MODIFICATION TO SITE BOUNDARIES AND ACCESS THROUGH APPROVED ENTRANCE GRANTED UNDER PLANNING REF. NO. 22/51854, (2) CHANGE OF HOUSE DESIGN AND CHANGE OF HOUSE POSITION / ... login required. |
Details... |
1.3km |
18/10/2024 |
N/A |
LOWER MAIN STREET , LETTERKENNY , CO. DONEGAL |
CHANGE OF USE OF EXISTING OFFICE UNIT TO STUDENT ACCOMMODATION AT SECOND FLOOR LEVEL AND ASSOCIATED WORKS... login required. |
Details... |
920m |
18/10/2024 |
N/A |
64 PORT RD , LETTERKENNY , CO. DONEGAL |
REPLACEMENT OF EXISTING HIGH-LEVEL FACIA SIGNAGE WITH NEW INTERNALLY ILLUMINATED FACIA SIGNAGE WITH SPECSAVERS CORPORATE LOGO, STRAPLINE AND AN INTERNALLY ILLUMINATED PROJECTING SIGN... login required. |
Details... |
2.5km |
10/10/2024 |
N/A |
DRUMANY , LETTERKENNY , CO. DONEGAL |
ERECTION OF DWELLING HOUSE WITH SEPTIC TANK INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.3km |
09/10/2024 |
N/A |
LOWER MAIN STREET , LETTERKENNY , CO. DONEGAL |
CHANGE OF USE OF EXISTING FIRST AND SECOND FLOOR OFFICE UNITS TO STUDENT ACCOMMODATION AT EACH FLOOR LEVEL AND ASSOCIATED WORKS... login required. |
Details... |
1.3km |
08/10/2024 |
N/A |
LOWER MAIN STREET , LETTERKENNY , CO. DONEGAL |
CHANGE OF USE OF OFFICE UNIT TO 1 NO. APARTMENT AT SECOND FLOOR LEVEL AND ASSOCIATED WORKS... login required. |
Details... |
910m |
03/10/2024 |
N/A |
DRUMNAHOAGH , LETTERKENNY , CO. DONEGAL |
RELOCATION OF AN AMENDED WASTEWATER TREATMENT SYSTEM PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 23/50669 AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
02/10/2024 |
N/A |
DRUMANY , LETTERKENNY , CO. DONEGAL |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
800m |
01/10/2024 |
N/A |
DRUMNAHOAGH , LETTERKENNY , CO. DONEGAL |
A NEW PEDESTRIAN ACCESS AND CYCLEWAY TO SERVICE PERMITTED DEVELOPMENT OF WORKSHOPS INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
590m |
26/09/2024 |
CONDITIONAL |
UNIT 31 LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY |
EMERGENCY ESCAPE DOOR TO THE EXTERNAL WALL OF UNIT 31 ON THE SOUTH ELEVATION ADJACENT TO THE SOUTH ENTRANCE OF THE SHOPPING CENTRE... login required. |
Details... |
1.8km |
25/09/2024 |
CONDITIONAL |
LISMONAGHAN , LETTERKENNY , CO. DONEGAL |
CONSTRUCTION OF AN EXTENSION AND RENOVATIONS TO EXISTING DWELLING AND ALL ANCILLARY WORKS WITH CONNECTION TO EXISTING SERVICES... login required. |
Details... |
930m |
19/09/2024 |
CONDITIONAL |
PEARSE ROAD , LETTERKENNY , CO. DONEGAL |
CONSTRUCTION OF NEW PREFABRICATED MULTI-PURPOSE BUILDING, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
590m |
16/09/2024 |
N/A |
LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY PO |
EXTENSION OF THE EXISTING SOUTHEAST SERVICE YARD AND THE ASSOCIATED EXTERNAL SCREEN WALL WITH GATE ACCESS ADJACENT TO THE SOUTH ENTRANCE... login required. |
Details... |
970m |
12/09/2024 |
CONDITIONAL |
BALLYRAINE , LETTERKENNY , CO. DONEGAL |
DEMOLITION OF ALL BUILDINGS AND STRUCTURES CONTAINED WITHIN THE GROUNDS OF THE FORMER TELECOM PREMISES ALONG WITH THE REPAIR OF EXISTING FENCE AND INSTALLATION OF NEW PERIMETER SECURITY FENCE... login required. |
Details... |
1.8km |
12/09/2024 |
CONDITIONAL |
NO. 75 MEADOWBANK PARK , BALLYBOE GLENCAR , LETTERKENNY |
CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE AND CONVERSION OF INTEGRAL GARAGE TO PROVIDE ANCILLARY ACCOMMODATION CONSISTING OF A NEW ACCESSIBLE BEDROOM WITH EN-SUITE SHOWER ROOM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
420m |
02/09/2024 |
N/A |
ATLANTIC TECHNOLOGICAL UNIVERSITY - DONEGAL LETTERKENNY CAMPUS , PORT RD GORTLEE , LETTERKENNY |
DEVELOPMENT ON A SITE EXTENDING TO 1.08 HECTARES CONSISTING OF THE FOLLOWING: (1) CONSTRUCTION OF A 3-STOREY LIBRARY, IT AND GENERAL EDUCATION BUILDING (5156 SQM) COMPRISING READING ROOMS/BOOK STACKS, GENERAL AND SPECIALIST TEACHING SPACES (LECTURE THEATRE, CLASSROOMS, COMPUTER LABS, GROUP STUDY ROOMS ETC.), STAFF OFFICES, ADMINISTRATION SPACES AND ANCILLARY SERVICE AREAS WITH SCREENED ROOF LEVEL PLANT, (2) PROVISION OF A NORTH-SOU... login required. |
Details... |