2.4km |
28/08/2024 |
N/A |
ARDSBEG , GORTAHORK , LETTERKENNY PO |
EXTENSION AND REFURBISHMENT TO EXISTING DWELLING HOUSE AND CONNECTION TO APPROVED WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
3km |
27/08/2024 |
N/A |
SRUHANREAGH , FALCARRAGH , LETTERKENNY PO |
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.7km |
06/08/2024 |
N/A |
ESB NETWORKS AN TSRÁID MHÓR , AN FÁL CARRACH , CO. DHÚN NA NGALL |
CONSTRUCTION OF A 4-BAY STORAGE SHED (18M X 6M X 4M), THAT INCLUDES NO. 3 OPEN BAYS WITH NO. 1 CLOSED BAY, SECURED BY A ROLLER-DOOR WITH SIDE PEDESTRIAN ACCESS, ERECTED ON ... login required. |
Details... |
2.5km |
08/07/2024 |
CONDITIONAL |
SHROUGHAN , FALCARRAGH , LETTERKENNY PO |
DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.6km |
19/06/2024 |
N/A |
BALLINTEMPLE , FALCARRAGH , CO DONEGAL |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.4km |
04/06/2024 |
CONDITIONAL |
BALLINA , FALCARRAGH , LETTERKENNY PO |
ERECTION OF STORAGE SHED WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
23/05/2024 |
N/A |
BALLYNESS , FALCARRAGH , LETTERKENNY |
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THE APPLICATION... login required. |
Details... |
2.5km |
17/05/2024 |
N/A |
BALLYCONNELL , FALCARRAGH , LETTERKENNY |
REMOVAL OF EXISTING TEMPORARY BUILDINGS AND ERECTION OF A NEW CLUBHOUSE WHICH WILL CONTAIN A MEMBERS BAR, KITCHEN, RECEPTION AREA, CHANGING FACILITIES, TOILETS, OFFICE AND STORE ALONG WITH A WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
08/05/2024 |
N/A |
BALLYCONNELL , FALCARRAGH , CO. DONEGAL |
REMOVAL OF EXISTING TEMPORARY BUILDINGS AND ERECTION OF A NEW CLUBHOUSE WHICH WILL CONTAIN A MEMBERS BAR, KITCHEN, RECEPTION AREA, CHANGING FACILITIES, TOILETS, OFFICE AND STORE ALONG WITH A WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
220m |
11/04/2024 |
N/A |
UPPER KILLULT , FALCARRAGH , LETTERKENNY PO |
CONSTRUCTION OF A DWELLING HOUSE WITH ATTACHED DOMESTIC GARAGE AND TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
10/04/2024 |
N/A |
BALLYCONNELL , FALCARRAGH , CO DONEGAL |
(1) REMOVAL OF EXISTING TEMPORARY BUILDINGS, (2) ERECTION OF A NEW CLUBHOUSE WHICH WILL CONTAIN A MEMBERS BAR, KITCHEN, RECEPTION AREA, CHANGING FACILITIES, TOILETS, OFFICE AND STORE ALONG WITH A WASTE WATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.7km |
05/04/2024 |
N/A |
CASHEL , GORTAHORK , CO DONEGAL |
(1) ERECTION OF A PRIVATE WEAVING STUDIO BESIDE EXISTING DWELLING HOUSE, (2) CONNECTION TO EXISTING SEPTIC TANK, AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.8km |
20/03/2024 |
CONDITIONAL |
FALCARRAGH , LETTERKENNY PO , DONEGAL |
(1) CONSTRUCTION OF 2 NO. EXTENSIONS AND RENOVATIONS TO EXISTING DWELLING HOUSE, (2) DECOMISSIONING EXISTING SEPTIC TANK AND INSTALLATION OF NEW SEPTIC TANK AND POLISHING FILTER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.7km |
05/03/2024 |
CONDITIONAL |
BALLYCONNELL , FALCARRAGH , LETTERKENNY |
CHANGE OF USE OF A GARAGE WHICH WAS GRANTED UNDER PLANNING REF. NO. 22/51103 TO BE USED AS A GRANNY FLAT WHICH WILL BE AUXILIARY TO THE MAIN HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS WHICH WILL INCLUDE CONNECTION TO THE PUBLIC SEWER... login required. |
Details... |
1.7km |
27/02/2024 |
CONDITIONAL |
AONAD TIONSCLAÍOCH 2 , BAILE CHONAILL , AN FÁL CARRACH |
(1) LEATHNÚCHAN DHÁ STÓR A CHUR LE HAONAD 2, (2) AN MONARCHAN REATHA INA BHFUIL OIFIGÍ COIMHDEACH AGUS ÁISEANNA LEASA FOIRNE AG CORA TINE TEORANTA FAOI LÁTHAIR, (3) BEIDH SPÁS URLÁIR BHREISE DE THART AR 980M/2 AR FÁIL NUAIR A BHEAS AN... login required. |
Details... |
1.7km |
22/02/2024 |
N/A |
UNIT 2 , BALLYCONNELL INDUSTRIAL ESTATE , FALCARRAGH |
LEATHNÚCHAN DHÁ STÓR A CHUR LE HAONAD 2, AN MONARCHAN REATHA INA BHFUIL OIFIGÍ COIMHDEACH AGUS ÁISEANNA LEASA FOIRNE AG CORA TINE TEORANTA FAOI LÁTHAIR. BEIDH SPÁS URLÁIR BHREISE DE THART AR 980M/2 AR FÁIL NUAIR A BHEAS AN L... login required. |
Details... |
2.5km |
31/01/2024 |
N/A |
BALLYCONNELL , FALCARRAGH , LETTERKENNY |
REMOVAL OF EXISTING TEMPORARY BUILDINGS AND ERECTION OF A NEW CLUBHOUSE WHICH WILL CONTAIN A MEMBERS BAR, KITCHEN, RECEPTION AREA, CHANGING FACILITIES, TOILETS, OFFICE AND STORE ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.9km |
21/12/2023 |
CONDITIONAL |
CHURCH ROAD , FALCARRAGH , LETTERKENNY |
ALTERATIONS TO THE APPROVED PLANNING PERMISSION 19/51090 WHICH INCLUDES THE FOLLOWING: (1) PROVISION OF 5 ADDITIONAL 2 BEDROOM DWELLING HOUSES, (2) PROVISION OF A 5 BEDROOM GROUP HOME, (3) ALTERATIONS TO THE DEVELOPMENT LAYOUT WHICH INCLUDES THE DWELLING LAYOUTS, INTERNAL ACCESS ROAD, CAR... login required. |
Details... |
1.1km |
08/12/2023 |
N/A |
BALLYNESS , FALCARRAGH , LETTERKENNY |
CONSTRUCTION OF 21 NO. DWELLINGS CONSISTING OF 5 NO. 4 BEDROOM DETACHED DWELLINGS, 8 NO. 4 BEDROOM SEMI-DETACHED DWELLINGS AND 8 NO. 3 BEDROOM SEMI-DETACHED DWELLINGS WITH CONNECTI... login required. |
Details... |