0m |
25/07/2024 |
CONDITIONAL |
DRUMAWARK , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A PORTAL FRAMED MACHINERY AND DRY FEED STORE, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
0m |
17/06/2024 |
CONDITIONAL |
DRUMAWARK , PETTIGO , CO DONEGAL |
CONSTRUCTION OF A PORTAL FRAMED SHEEP HOUSE, SLATTED TANK BELOW, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
08/05/2024 |
CONDITIONAL |
CARN , PETTIGO , CO. DONEGAL |
REMOVAL OF THE EXISTING SILO PIT AND CONSTRUCTION OF A LOOSE CATTLE HOUSE (SIMILAR TO THAT PREVIOUSLY GRANTED UNDER REF. NO. 23/50989), CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
... login required. |
Details... |
2.4km |
02/05/2024 |
N/A |
CARN , PETTIGO , CO DONEGAL |
(1) REMOVAL OF EXISTING SILO PIT, (2) CONSTRUCTION OF A LOOSE CATTLE HOUSE (SIMILAR TO THAT PREVIOUSLY GRANTED UNDER 23/50989), CONCRETE APRON AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
07/07/2023 |
CONDITIONAL |
CARN , PETTIGO , DONEGAL PO |
ROOFING OVER OF AN EXISTING SILAGE PIT, CONNECTION TO EXISTING SOAK AWAY, CONCRETE APRON INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
13/06/2023 |
N/A |
CARN TD , PETTIGO , DONEGAL PO |
ROOFING OVER OF AN EXISTING SILAGE PIT, CONNECTION TO EXISTING SOAK AWAY, CONCRETE APRON INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
13/06/2023 |
CONDITIONAL |
CARN LOWER , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A PORTAL FRAMED DRY FEED STORAGE SHED AND CONCRETE APRON, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
26/05/2023 |
N/A |
CARN/CARN LOWER , PETTIGO , DONEGAL PO |
ROOFING OVER OF AN EXISTING SILAGE PIT AND CONNECTION TO EXISTING SOAK AWAY, CONSTRUCTION OF A PORTAL FRAMED DRY FEED STORAGE SHED AND CONCRETE APRON INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
590m |
26/05/2023 |
CONDITIONAL |
DRUMAWARK , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANKS BELOW, MACHINERY SHED, SILAGE PIT WITH CONCRETE APRON AND STORM WATER SOAKAWAYS TO INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
19/04/2023 |
N/A |
CARN , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A NEW PORTAL FRAMED DRY STORAGE SHED OVER AN EXISTING SILAGE PIT INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
19/04/2023 |
N/A |
CARN LOWER , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A NEW PORTAL FRAMED DRY STORAGE SHED AND EXTERNAL CONCRETE APRON, INCLUDING ALL ASSOCIATED SITE AND DRAINAGE WORKS... login required. |
Details... |
2.1km |
04/10/2022 |
CONDITIONAL |
DRUMCHRIN , PETTIGO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE AND CONNECTION TO EXISTING SECONDARY AND TERTIARY EFFLUENT TREATMENT SYSTEM AS GRANTED UNDER 20/50219... login required. |
Details... |
1.3km |
03/11/2021 |
CONDITIONAL |
TULLYLARK , PETTIGO , DONEGAL PO |
(1) ERECTION OF DWELLING HOUSE AND THE INSTALLATION OF A TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT AREA (2) WIDEN AND ALTERATIONS TO EXISTING FARM ENTRANCE ONTO PUBLIC ROAD TO SERVE PROPOSED DWELLING HOUSE... login required. |
Details... |