1.8km |
05/11/2024 |
N/A |
BALLYMACAWARD , BALLYSHANNON , DONEGAL PO |
SUBTERRANEAN BASEMENT AREA AND BALCONY AND PERMISSION FOR THE CHANGE OF USE OF THE GROUND AND FIRST FLOOR OF DWELLING TO A TEN-BEDROOM GUESTHOUSE... login required. |
Details... |
1.9km |
01/11/2024 |
N/A |
ABBEYLANDS , BALLYSHANNON , DONEGAL PO |
REPLACEMENT OF A THATCHED ROOF WITH A NEW SLATE ROOF AND ALL ASSOCIATED WORKS... login required. |
Details... |
1km |
01/11/2024 |
N/A |
PORTNASON , BALLYSHANNON , DONEGAL PO |
RENOVATION OF EXISTING DWELLING HOUSE TO INCLUDE ADDITIONAL FENESTRATION, CONSTRUCTION OF EXTENSIONS TO SIDE AND REAR, REPLACEMENT OF EXISTING ROOF AND ALL ASSOCIATED SITEWORKS... login required. |
Details... |
1.8km |
07/10/2024 |
N/A |
BALLYMACAWARD , BALLYSHANNON , DONEGAL PO |
SUBTERRANEAN BASEMENT AREA AND BALCONY AND PERMISSION FOR THE CHANGE OF USE OF THE GROUND AND FIRST FLOOR OF DWELLING TO A TEN-BEDROOM GUESTHOUSE... login required. |
Details... |
1.7km |
03/10/2024 |
N/A |
BALLYMACAWARD , BALLYSHANNON , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE, DETACHED GARAGE, FOUL DRAINAGE SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.9km |
27/09/2024 |
N/A |
COOLCHOLLY , BALLYSHANNON , DONEGAL PO |
ERECTION OF 3 NO. DETACHED DWELLING HOUSES AND CONNECTION TO PUBLIC SEWER AND STORM SYSTEM... login required. |
Details... |
1.9km |
25/07/2024 |
CONDITIONAL |
THE MALL , TOWNPARKS , BALLYSHANNON DONEGAL PO |
CHANGE OF USE FROM COMMERCIAL SPACE TO 2 NO. RESIDENTIAL UNITS AND DEMOLITION OF PART OF THE EXISTING COMMERCIAL SPACE... login required. |
Details... |
1.5km |
23/07/2024 |
CONDITIONAL |
NO. 10 SAIMER DRIVE , BALLYSHANNON , DONEGAL PO |
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE OF EXISTING DWELLING... login required. |
Details... |
2.9km |
10/07/2024 |
UNCONDITIONAL |
LEGALTAN TD , BALLYSHANNON , DONEGAL PO |
(1) CONSTRUCTION OF A POULTRY SHED INCORPORATING A RAINWATER HARVESTING SYSTEM, (2) CONSTRUCTION OF AN EFFLUENT HOLDING TANK AND (3) ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
1.6km |
04/07/2024 |
CONDITIONAL |
ABBEYLANDS , BALLYSHANNON , CO. DONEGAL |
ERECTION OF A DWELLING HOUSE, CONNECTION TO PUBLIC SEWER AND STORM SYSTEM... login required. |
Details... |
2.5km |
19/06/2024 |
CONDITIONAL |
BALLYMACAWARD , BALLYSHANNON , CO DONEGAL |
ROOFING OF EXISTING YARD AND EXTENSION OF EXISTING SHED TO PROVIDE ADDITIONAL DRY FLOOR AREA... login required. |
Details... |
3km |
14/06/2024 |
CONDITIONAL |
KILDONEY GLEBE , BALLYSHANNON , CO DONEGAL |
CONSTRUCTION OF CATTLE CRUSH... login required. |
Details... |
2.5km |
14/06/2024 |
N/A |
BALLYMACAWARD , BALLYSHANNON , CO DONEGAL |
ROOFING EXISTING YARD AND EXTENDING EXISTING SHED TO PROVIDE ADDITIONAL DRY FLOOR AREA... login required. |
Details... |
3km |
16/02/2024 |
CONDITIONAL |
BALLYMUNTERHIGGIN , BALLYSHANNON , CO. DONEGAL |
CHANGE OF USE FROM ATTIC STORAGE SPACE TO USE AS DOMESTIC ACCOMMODATION AT FIRST FLOOR LEVEL OF EXISTING DWELLING WITH ASSOCIATED ELEVATIONAL CHANGES INCLUDING ADDITIONAL ROOFLIGHTS ... login required. |
Details... |
2km |
16/02/2024 |
CONDITIONAL |
CASTLE STREET , BALLYSHANNON , CO. DONEGAL |
CHANGE OF USE FROM RETAIL UNIT TO USE AS A RESTAURANT WITH ALL ASSOCIATED ELEVATIONAL CHANGES / SIGNAGE... login required. |
Details... |
1.5km |
08/02/2024 |
CONDITIONAL |
CARRICKBOY , BALLYSHANNON , CO DONEGAL |
(1) SUBSTANTIAL DEMOLITION OF REAR WALLS AND ROOFS OF 4 NO. TWO STOREY PROTECTED STRUCTURES WITH STREET FRONTAGE RETAINED TO WEST PORT ROAD/R267 AT WEST END OF SITE, (2) SUBSTANTIAL DEMOLITION OF SIDE AND REAR STONE WALLS AND BARREL ROOF TO LARGE, P... login required. |
Details... |
3km |
07/02/2024 |
N/A |
BALLYMUNTERHIGGIN , BALLYSHANNON , CO.DONEGAL |
CHANGE OF USE FROM ATTIC STORAGE SPACE TO USE AS DOMESTIC ACCOMMODATION AT FIRST FLOOR LEVEL OF EXISTING DWELLING... login required. |
Details... |
2.4km |
02/02/2024 |
N/A |
BALLYMACAWARD , BALLYSHANNON , CO. DONEGAL |
(1) ERECTION OF 5 NO GLAMPING PODS AND ROOFED BARBEQUE AREA, (2) INSTALLATION OF SEPTIC TANK WITH SECONDARY AND TERTIARY REED BED, PIPED TO INFILTRATION AREA/DISPOSAL AREA, (3) DEVELOPMENT OF KIDS TOY JEEP TRACK AND STORAGE SHED... login required. |
Details... |
2.2km |
21/12/2023 |
CONDITIONAL |
COOLCHOLLY , BALLYSHANNON , DONEGAL PO |
(1) CONSTRUCTION OF 34 NO. RESIDENTIAL UNITS WITH THE BREAKDOWN AS FOLLOWS: (A) 14 NO. SEMI- DETACHED HOUSES (3 BEDROOM UNITS), (B) 12 NO. APARTMENTS (12 NO. 2 BEDROOM UNITS), (C) 8 NO. TERACED HOUSES IN 2 NO. TERACES OF 4 (2 BEDROOM UNITS), (2) NEW SITE ENTRANCE, ACCESSED FROM THE EXISTING R231 PUBLIC ROAD, (3) PASSIVELY SUPERVI... login required. |
Details... |
1.8km |
06/12/2023 |
CONDITIONAL |
THE MALL , BALLYSHANNON , CO DONEGAL |
EXTENDED AREA TO THE REAR OF OFFICE BUILDING GRANTED UNDER PREVIOUS PLANNING REF. NO. 03/54 AND PERMISSION FOR CHANGE OF USE OF THE SAME BUILDING FROM OFFICE SPACE TO DOMESTIC DWELLING... login required. |
Details... |