2.3km |
23/03/2024 |
n/a |
Srananagh, Sooey, Sligo, F52 AK63 |
Construct a Two-Storey Extension to the front of the House consisting of an Entry Vestibule on the Ground Floor and a small Storage Area on the First Floor adding a Total of 7 sq. Metres Internal Floor Area to the existing Dwelling... login required. |
Details... |
1.8km |
23/12/2023 |
N/A |
Kingsfort Manor , Ballintogher , Sligo |
(a) construct one detached two storey dwelling house on vacant site number one, (b) construct two semi-detached two storey dwelling houses on vacant site number thirty six and thirty seven and (c) construct one detached two storey dwelling house on vacant site number thirty eight... login required. |
Details... |
1.6km |
14/11/2023 |
CONDITIONAL |
Woodfield , Ballintogher , Co. Sligo |
Permission for retention of single storey porch extension to front of dwelling house and retention of 2 storey extension to rear of dwelling house built as replacement for previous 2 storey extension to the rear with all associated site works... login required. |
Details... |
2.8km |
16/12/2022 |
CONDITIONAL |
Lavally , Ballintogher , Co. Sligo |
development consisting of the following: To construct a single storey type domestic dwelling, a new site entrance, a domestic garage, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works... login required. |
Details... |
1.8km |
22/11/2022 |
CONDITIONAL |
Lavally , Bloomfield , Ballintogher |
development consisting of the refurbishment of an existing single stores cottage (approx. 40sq.m.) including 2 no. rooflights to rear of existing house, demolition of a flat roof extension (22sq.m.) and porch (1sq.m.), construction of a single storey extension to the nort... login required. |
Details... |
730m |
09/11/2022 |
N/A |
Townland of Ballysumaghan , Fannybrook , Quarry Lane |
development consisting of the development of a battery energy storage system. The development will consist of a 10 year planning permission for the construction of a: (1) enclosed battery energy storage system compound on a total of up to c. 1.7 hectare site, to include: 1 no. single storey customer substation and 1 no. TSO substation (c. 182m2), control and switch rooms, up to 174 battery units set inside storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), transfo... login required. |
Details... |
1.1km |
27/10/2022 |
CONDITIONAL |
Ballysumaghan , Sooey , County Sligo |
development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 7 No. electrical equipment containers (containing ancillary power supply products including static frequency converters, MV switchgear, exciters, LV distribution, control room); 4 No. external cooler units; main, auxiliary & start-up electrical transformers, generator circuit breakers, switchgear equipment, and 1 No. back up diesel generator and associated diesel storage tank; (b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6 high g... login required. |
Details... |
1.3km |
26/10/2022 |
CONDITIONAL |
Ballysumaghan , Co. Sligo |
development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound th... login required. |
Details... |
1.6km |
12/10/2022 |
CONDITIONAL |
Woodfield Td. , Ballintogher East ED , Co. Sligo |
development consisting of (i) demolish existing derelict dwelling (ii) construct a storey and half dwelling house with a single storey wing attached to the rear (iii) install a proprietary wastewater treatment system and percolation area (iv) carry out all ancillary site works... login required. |
Details... |
2.7km |
06/09/2022 |
CONDITIONAL |
Cartronhugh , Ballintogher , Co. Sligo |
development consisting of construction of single storey type domestic dwelling with liveable accommodation in the roof space, a new site entrance, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works... login required. |
Details... |
3km |
29/07/2022 |
CONDITIONAL |
Kilross , Ballygawley , Co. Sligo |
development consisting of the following: provision of an alternative entrance to serve existing dwelling house, new parking area, all ancillary site works including landscaping and closure of existing entrance... login required. |
Details... |
120m |
01/06/2022 |
CONDITIONAL |
Kiltycloghan , Balintogher , Co Sligo |
development consisting of construction of a new dwelling house with sewage treatment system and separate domestic garage and all associated development works... login required. |
Details... |
1.7km |
24/05/2022 |
N/A |
Woodfield Td. , Ballintogher East ED. , Co Sligo |
Development consisting of (1) construction of a storey and half dwelling house with a single storey wing attached to the east, (ii) installation of a wastewater treatment system and percolati... login required. |
Details... |
1.9km |
11/02/2022 |
CONDITIONAL |
9 Kingsfort , Ballintogher , Co Sligo |
Development consisting of the following works: 1. Retention of existing first floor attic conversion from storage to habitable rooms along with 3 roof lights to front and 1 one rear, 2. Replace 2 no. existing Velux windows to the rear with 2 flat roof dormers with windows suitable for escape a... login required. |
Details... |
2.6km |
19/10/2021 |
CONDITIONAL |
Lavally , Ballintogher , Co. Sligo |
development consisting of the construction of a single storey type domestic dwelling, domestic garage, a new site entrance, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works... login required. |
Details... |
140m |
20/09/2021 |
CONDITIONAL |
Kiltycloghan , Ballintogher , Co Sligo |
Development consisting of retention of an existing domestic garage and all associated ancillary works, parent application No. 03/333.
... login required. |
Details... |
1.5km |
16/09/2021 |
CONDITIONAL |
Ballysumaghan , Ballintogher , Co Sligo |
Development consisting of upgrading treatment system at existing house by installing new waste water treatment system and Ter 3 Packaged Tertiary unit
... login required. |
Details... |
2.8km |
13/08/2021 |
CONDITIONAL |
Clooskirt , Coola , Co. Sligo |
development consisting of (1) retention of alterations to elevations of dwelling house as constructed which differ from those previously permitted under PL 04/533 (2) retention of domestic sheds constructed on site with all associated site works... login required. |
Details... |
2.5km |
11/08/2021 |
N/A |
Lavally , Ballintogher , Co. Sligo |
development consisting of the following: to construct a single storey type domestic dwelling, domestic garage, a new site entrance, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works... login required. |
Details... |