2.6km |
16/08/2024 |
CONDITIONAL |
CARRICKNAGORE , BRUCKLESS , DONEGAL PO |
CONSTRUCTION OF 1 NO. SINGLE STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS ... login required. |
Details... |
1.5km |
15/06/2024 |
REFUSED |
TOWNLANDS OF FAIAFANNAN & CUNLIN , 3.5KM NORTH OF KILLYBEGS HARBOUR , CO DONEGAL |
10 YEAR PLANNING PERMISSION WHICH WILL CONSIST OF (1) UPGRADING OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRANCE, (2) CONSTRUCTION O... login required. |
Details... |
2.6km |
10/06/2024 |
N/A |
CARRICKNAGORE , BRUCKLESS , CO DONEGAL |
CONSTRUCTION OF 1 NO. SINGLE STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS. (OUTLINE PERMISSION REF. NO. 23/50346 REFERS)... login required. |
Details... |
1.5km |
07/06/2024 |
N/A |
TOWNLANDS OF FAIAFANNA & CUNLIN , APPROX. 3.5KM NORTH OF KILLYBEGS HARBOUR , KILLYBEGS |
10 YEAR PLANNING PERMISSION FOR WORKS RELATING TO BRADÁN WIND FARM WHICH WILL CONSIST OF (1) THE UPGRADE OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRAN... login required. |
Details... |
2.8km |
23/10/2023 |
CONDITIONAL |
CASHELREAGH GLEBE , BRUCKLESS , DONEGAL PO |
DEMOLITION OF AN EXISTING GARAGE AND CONSTRUCTION OF A NEW GARAGE TO THE REAR OF EXISTING HOUSE AND ASSOCIATED SITE WORKS ... login required. |
Details... |
2.7km |
21/08/2023 |
CONDITIONAL |
CULLION , KILLYBEGS , CO. DONEGAL |
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 169M, (B) THE CONSTRUCTION OF WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY A... login required. |
Details... |
2.5km |
04/07/2023 |
CONDITIONAL |
CORPORATION , KILLYBEGS , DONEGAL PO |
(1) CONSTRUCTION OF A SINGLE-STOREY DWELLING HOUSE, ANCILLARY DOMESTIC GARAGE AND LEAN TO COVERED AREA, (2) INSTALLATION OF A NEW SEWERAGE TREATMENT UNIT AND PERCOLATION AREA AND (3) CONSTRUCTION OF A NEW ENTRANCE ONTO THE ADJOINING ROADWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.6km |
20/03/2023 |
CONDITIONAL |
CARRICKNAGORE , BRUCKLESS , DONEGAL PO |
CONSTRUCTION OF 1 NO. 1 & 1/2 STOREY DWELLING WITH MECHANICAL AERATION TANK AND WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS... login required. |
Details... |
2.5km |
09/12/2022 |
N/A |
CORPORATION TD , KILLYBEGS , DONEGAL PO |
CONSTRUCTION OF (1) A SINGLE STOREY DWELLING HOUSE, ANCILLARY DOMESTIC GARAGE AND LEAN TOO COVERED AREA AND INSTALLATION OF A NEW SEWERAGE TREATMENT UNIT AND PERCOLATION AREA (2) A NEW ENTRANCE ONTO THE ADJOINING ROADWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.3km |
23/11/2022 |
CONDITIONAL |
STARGAR , KILLYBEGS , DONEGAL PO |
(1) DEMOLITION OF EXISTING COTTAGE (2) ERECTION OF A REPLACEMENT DWELLING WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS... login required. |
Details... |
2km |
11/11/2022 |
N/A |
STRALEENY , KILLYBEGS , DONEGAL PO |
A HOLIDAY RESORT TO INCLUDE THE FOLLOWING: (1) RENOVATION FOR (A) EXISTING HOLLY BUSH BAR TO PROVIDE A NEW GASTRO PUB TO GROUND FLOOR WITH A GUEST ACCOMMODATION SUITE TO THE FIRST FLOOR INCLUDING A NEW ACCESS STAIRWELL, (B) EXISTING OUTBUILDING TO PROVIDE A TWO STOREY GUEST ACCOMMODATION SUITE INCLUDING NEW ACCESS STAIRWELL, (2) CONSTRUCTION OF (A) AN EXTENSION LINKING THE EXISTING BAR AND OUTHOUSE BUILDINGS TO INCLUDE A NEW RESTAURANT AND ASSOCIATED KITCHEN AND RESTROOM FACILITIES, (B) A DETACHED RECEPTION BUILDING AND ESB TRANSFORMER BUILDING, (C) 14 NO. TWO STOREY DETAC... login required. |
Details... |
1.3km |
03/11/2022 |
N/A |
STARGAR , KILLYBEGS , DONEGAL PO |
DEMOLITION OF EXISTING COTTAGE AND THE ERECTION OF A REPLACEMENT DWELLING WITH WASTEWATER TREATEMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED WORKS... login required. |
Details... |
2.4km |
15/07/2022 |
REFUSED |
CORNACAHAN AND CUNLIN , KILLYBEGS , DONEGAL PO |
(1) CONSTRUCTION OF (A) ONE ENERCON E138 WIND TURBINE ON AN 81M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 149.38 (B) THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBL... login required. |
Details... |
2.3km |
14/07/2022 |
REFUSED |
MULTINS , BRUCKLESS , KILLYBEGS |
CONSTRUCTION OF A WIND TURBINE WITH AN OPERATIONAL LIFESPAN OF 30 YEARS FROM COMMISSIONING, WITH A TIP HEIGHT OF APPROXIMATELY 150 METRES, CONTROL BUILDING, UPGRADING OF SITE ENTRANCE, SITE ACCESS ROAD (APPROXIMATELY 195 METRES), HARDSTAND AREAS, UNDERGROUND CABLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
29/06/2022 |
CONDITIONAL |
CROCKNAFEOLA , KILLYBEGS , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
27/06/2022 |
CONDITIONAL |
CORPORATION , KILLYBEGS , DONEGAL PO |
(1) REFURBISHMENT (2) ERECTION OF (A) AN EXTENSION AND ALTERATIONS TO AN EXISTING DISUSED HOUSE/ COTTAGE TO INCLUDE REFURBISHMENT OF THE EXISTING COTTAGE (B) A NEW GLAZED PORCH AND (C) A SINGLE STOREY FLAT ROOF EXTENSION TO THE SIDE AND REAR TO PROV... login required. |
Details... |
2.2km |
14/06/2022 |
CONDITIONAL |
CARRICKNAGORE , BRUCKLESS , DONEGAL PO |
(1) EXTENSION TO DWELLING HOUSE, INCLUDING ALTERATIONS TO THE REAR & SIDE ELEVATIONS (2) DOMESTIC GARAGE... login required. |
Details... |
2.1km |
16/02/2022 |
CONDITIONAL |
TULLAGHCULLION & CASHELREAGH GLEBE , KILLYBEGS , DONEGAL PO |
CONSTRUCTION OF EXTENSIONS TO EXISTING NET MAKING BUILDING TO PROVIDE ADDITIONAL MANUFACTURING AND STORAGE FACILITIES AND ALL OTHER ASSOCIATED SITE WORKS... login required. |
Details... |
2.1km |
20/01/2022 |
CONDITIONAL |
TULLAGHACULLION , BRUCKLESS , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE, PROPRIEARY SEWERAGE TREATMENT SYSTEM & PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |