2.7km |
31/05/2024 |
CONDITIONAL |
Castlegal , E.D. Cliffoney North , Co. Sligo F91 XT45 |
1. construction of single storey flat roof extension to north-west elevation, 2. construction of a new pitched roofed extension and new enlarged porch to south-west elevation and 3. alterations to north-west, south-east and north-east elevations all to existing dwelling... login required. |
Details... |
3km |
29/04/2024 |
CONDITIONAL |
Gortnahoula Ballintrillick Co.Sligo F91 CR44 , |
Relocation of Existing vehicular Entrance to serve existing dwelling... login required. |
Details... |
2.7km |
17/01/2024 |
CONDITIONAL |
Gortnahoula , Ballintrillick , Co. Sligo |
development consisting of the following: permission to construct of a new extension including the partial demolition of rear outbuildings, to decommissioning of the existing septic ... login required. |
Details... |
1.6km |
21/12/2023 |
CONDITIONAL |
Bunduff , Cliffoney , Co. Sligo |
installation of upgraded proprietary effluent treatment system and percolation area to serve existing semi-detached dwelling... login required. |
Details... |
1.9km |
11/12/2023 |
REFUSED |
Bunduff , Cliffoney , Co. Sligo. |
construction of new dwelling house with septic tank and percolation area and all associated site works... login required. |
Details... |
2.6km |
05/10/2023 |
CONDITIONAL |
Tawly , Kinlough , Co. Leitrim |
(1) Retain the existing domestic dwelling, (2) construct a new waste water treatment system, (3) upgrade the existing access road and all ancillary works... login required. |
Details... |
850m |
26/08/2023 |
CONDITIONAL |
Creevykeel , Cliffoney , Co. Sligo |
construction of a detached domestic dwelling, garage, a proprietary effluent treatment system and all associated site works... login required. |
Details... |
3km |
11/07/2023 |
CONDITIONAL |
Castlegal , Cliffoney North E.D , Co. Sligo. |
Construction of new dwelling house with proprietary effluent treatment system and percolation area, domestic garage and all associated site works... login required. |
Details... |
1.6km |
20/06/2023 |
CONDITIONAL |
CLOONKEEN , CLIFFONY , CO. SLIGO |
the construction of a dwelling house with domestic effluent treatment plant and polishing filter, together with all ancillary works and services... login required. |
Details... |
1.3km |
08/03/2023 |
CONDITIONAL |
Cloonkeen , Cliffoney , Co. Sligo |
development consisting of (a) demolish existing dwelling house on site, (b) demolish existing agricultural shed on site, (c) upgrade vehicular access, (d) construct a Dwelling house, Garage, Septic tank and Percolation area, toget... login required. |
Details... |
1.8km |
26/12/2022 |
CONDITIONAL |
Cartronkillerdo , Cliffoney , Co. Sligo |
development consisting of single storey sunroom extension constructed to side of dwelling house with all associated site works... login required. |
Details... |
1.3km |
19/12/2022 |
CONDITIONAL |
Bunduff , Castelgal , Co. Sligo |
development consisting of 1. Extension to house. 2. Change of use from common areas on ground floor and guest accommodation on first floor to one residential unit. 3. Raised roof level over boat store, attic storage area with external access door, 2 no. Velux windows and a gable window... login required. |
Details... |
1.6km |
13/12/2022 |
REFUSED |
Cloonkeen Td. , Cliffoney , Co. Sligo |
development consisting of construction of a dwellinghouse with domestic effluent treatment plant and polishing filter, together with all ancillary works and services... login required. |
Details... |
1.9km |
30/11/2022 |
CONDITIONAL |
The Cottages , Chapel Road , Cliffoney |
development consisting of construction of a new extension to the rear and side of the existing dwelling, comprising gross floor area at ground floor of 71sqm and 13 sqm at first floor level.... login required. |
Details... |
1.3km |
17/11/2022 |
CONDITIONAL |
Cloonkeen , Cliffoney , Co. Sligo |
development consisting of permission for demolition of existing stone outbuildings, to renovate and extend an existing single storey dwelling, tertiary treatment system and infiltration/treatment area and ... login required. |
Details... |
1.8km |
29/07/2022 |
CONDITIONAL |
Cartronplank , Cliffoney , Co. Sligo |
development consisting of the following: (1) construction of extension to south east elevation, (2) alterations to north east, north west and south west elevations, (3) upgrade of existing septic tank to new proprietary effluent treatment system and percolation area all to existing dwelling... login required. |
Details... |
850m |
01/04/2022 |
CONDITIONAL |
Creevykeel , Cliffoney , Co. Sligo |
development consisting of construction of a detached domestic dwelling, garage, a proprietary effluent treatment system and all associated site works and services... login required. |
Details... |
1.8km |
02/03/2022 |
N/A |
Cartronplank , Cliffoney , Co Sligo |
Development consisting of: 1. construction of extension to south east elevation, 2. alterations to north east, north west and south west elevations all to existing dwelling... login required. |
Details... |
2km |
17/12/2021 |
CONDITIONAL |
Bunduff townland , E.D Cliffony North , Co. Sligo |
Development consisting of the upgrading of an existing farm entrance to a forestry standard entrance... login required. |
Details... |