2.5km |
22/02/2024 |
N/A |
Lisduff , Calry , Sligo |
construct a dwelling house, on site effluent treatment system & associated percolation area and all associated site development works deemed necessary... login required. |
Details... |
1.4km |
11/01/2024 |
CONDITIONAL |
Hazelwood Demesne and Bellanode , Sligo , Sligo |
permission for a walking trail recreational development in the townlands HAZELWOOD DEMESNE and BELLANODE, CO. SLIGO. The proposed development includes 1.2km of... login required. |
Details... |
1.7km |
20/12/2023 |
N/A |
Farrell Brewery Hazelwood Road Ballinode Sligo , |
Proposed extension at the south/south east of the premises comprising of store rooms, disable toilet, male & female's toilets, smoking area, mini bar with gathering area and all other associates s... login required. |
Details... |
1.3km |
13/12/2023 |
N/A |
Hazelwood Demense and Bellanode , Sligo , Co. Sligo |
PERMISSION FOR A WALKING TRAIL RECREATIONAL DEVELOPMENT IN THE TOWNLANDS HAZELWOOD DEMESNE AND BELLANODE, CO SLIGO.
THE PROPOSED DEVELOPMENT INCLUDES 1.42KM OF ... login required. |
Details... |
1.9km |
08/12/2023 |
N/A |
Ardaghowen House , Ardaghowen Lane , Sligo |
permission for retention of a single storey double garage ancillary to residential ... login required. |
Details... |
1.8km |
04/12/2023 |
CONDITIONAL |
Colgagh , Calry. , Co. Sligo |
construction of single-story, three-bedroom dwelling house and all associated works, including the installation of a waste water treatment system, tertiary treatment system and distribution area ... login required. |
Details... |
1.4km |
16/11/2023 |
CONDITIONAL |
Manorhamilton Road , Ballytivnan. , Co. Sligo |
Construction of a dwelling house, domestic garage, access road and connection to all public services, including foul and storm drainage with all associated site development works.... login required. |
Details... |
1.7km |
06/10/2023 |
CONDITIONAL |
Hazelwood Demesne , Hazelwood , Co Sligo |
A one and a half storey dwelling, domestic garage, proprietary waste water treatment unit and percolation area and associated site works... login required. |
Details... |
2.5km |
15/09/2023 |
REFUSED |
Lisduff , Calry , Co. Sligo |
development consisting of the following: to construct a dwelling house, on-site effluent treatment system and associated percolation area and all associated site development works deemed necessary... login required. |
Details... |
1.7km |
07/09/2023 |
CONDITIONAL |
Kiltycahill , Calry , Co. Sligo |
To construction a 19.5 meter long, 5 m height concrete wall at end of our exist Astroturf Pitch, so we can develop drills and games using the wall, to improve the skil... login required. |
Details... |
2.7km |
11/07/2023 |
CONDITIONAL |
Teesan Co. Sligo , |
development consisting of the construction of a new dwelling house with sewage treatment system and separate domestic garage and all associated site development works... login required. |
Details... |
1.8km |
10/07/2023 |
N/A |
Colgagh Calry Co. Sligo , |
development consisting of the construction of a single-storey, three-bedroom dwelling house and all associated works, including the installation of a wastewater treatment system, tertiary treatment system and distribution area... login required. |
Details... |
1.8km |
05/07/2023 |
CONDITIONAL |
Kiltycahill , Hazelwood , Co. Sligo |
construction of a domestic single storey dwelling house along with domestic garage, new treatment system and percolation area and all ancillary site development works... login required. |
Details... |
1.8km |
03/07/2023 |
N/A |
Colgagh , Calry , Co. Sligo |
development consisting of a single storey, three bedroom dwelling and all associated works to include the installation of a waster water treatment system, tertiary treatment system and distribution area... login required. |
Details... |
1.2km |
29/06/2023 |
CONDITIONAL |
Sligo Sudbury School , Faughts Doonally , Co Sligo |
(A) Proposed development to the existing Sudbury School, “Former Doonally School”, a protected structure (RPS No. 289) under Sligo and Environs Development Plan, to consist of: (1) Internal works within main school building consisting of reorganisation of non-original fittings in kitchen, upgrading of non-original radiators in school building, and new heating system to Schoolmaster’s House. (2) Internal works to the 1960 Rear Extension of school building. (3) Additional School Accommodation extending from the 1960 Rear Extension of school building. (Floor Area = 545 m² plus 360 m² of covered external space). (B). Development outside the curtilage of the protected structure to consist of: (4) Demolition of existing 1970s prefabricated accommodation (floor area = 47 m²) and of shed structure (10 m²) at rear of site. (5) Retention of (i) barn structure to rear of school site (floor area = 55 m² ) used for spo... login required. |
Details... |
1.3km |
06/06/2023 |
N/A |
22 Mulberry Park , Ballinode , Sligo |
Permission for retention of 2 storey extension constructed to side of dwelling house and used as self-contained residential unit which differs from the extension permitted under PD 04/97 with all associated site works at 22 Mulberry Park, Ballinode, Sligo... login required. |
Details... |
2.9km |
24/05/2023 |
CONDITIONAL |
Ballure , Calry , Co. Sligo |
Planning permission to alter an existing garage flat roof to a pitched roof with all associated site works.... login required. |
Details... |
2.8km |
09/05/2023 |
CONDITIONAL |
Lough Gill Distillery , Hazelwood Demesne , Co. Sligo. |
development will consist of alterations to an existing whiskey maturation storage building (permitted under PL15/296) and will include the following works including any associated site development works: 1) Demolition of a section of the existing building to create a fire break and form a standalone whiskey maturation storage building, 2) modifications to the standalone whiskey maturation storage building which will include, a) lowering the existing high-level roof on the eastern side of the building, b) removing the existing brick cladding on the western and southern façades, c) elevational alteration with the addition of new fire escapes and roller shutter doors, d) the addition of external cladding and louvred vents to the exterior walls, 3) the construction of a sprinkler valve house extension (floor area of 4.0 m²) and sprinkler valve house/electrical room extension (floor area of 10.3 m²) to the western eleva... login required. |
Details... |
1.9km |
24/02/2023 |
CONDITIONAL |
Block G , ATU Sligo , Ash Lane |
development consisting of (i) 336m2 of roof mounted photovoltaic panels, (ii) the erection of a roof mounted heat pump and (iii) the installation of a revolving door and accessible entrance door at the front entrance, together with all associated site works and services.... login required. |
Details... |