1.7km |
14/03/2024 |
N/A |
Carrickhenry , Carraroe , Sligo |
(1) the construction of a proposed new 2975sqm single storey warehouse building with a parapet height of 8m inclusive of a two storey office space to the front (2) proposed new waste water treatment system and associated percol... login required. |
Details... |
420m |
04/01/2024 |
CONDITIONAL |
Broc House Aughamore Near , Carraroe , Co. Sligo |
reconfiguration and extension of the existing detached dwelling, decommissioning and removal of the existing on-site treatment system and installation of a new proprietary treatment plant and polishing filter and all associated site works ... login required. |
Details... |
2.2km |
19/12/2023 |
CONDITIONAL |
Ballyfree , Sligo , CO SLIGO |
he development will consist of:
1. The demolition of an existing derelict house.
2. The construction of a new split level house.
3. The construction of a new sewage treatment plant with raised soil polishing filter.
4. And all ancillary site works at this site, Ballyfree, Sligo, Co Sligo.... login required. |
Details... |
1.3km |
24/11/2023 |
CONDITIONAL |
GREEN ROAD , CAIRNS HILL , SLIGO |
Changes to box window on front elevation of house, retention for change of roof design, and alterations to window placement on garage and all associated site works, as previously granted under planning permission number 08/830.... login required. |
Details... |
1.6km |
20/09/2023 |
CONDITIONAL |
Unit 12 , Sligo Retail Park , Sligo |
development consisting of: Change of use of the unit from retail warehouse to warehouse with trade counters (selling building related products principally to trade but also for sales to the general public). External changes to the rear of the unit include: i... login required. |
Details... |
1.5km |
08/09/2023 |
CONDITIONAL |
Tonaforbes , Carraroe , Co. Sligo |
permission for the construction of a single-storey 3-classroom extension with ancillary accommodations and associated site work... login required. |
Details... |
1.5km |
07/09/2023 |
CONDITIONAL |
Drumiskabole , Carraroe , Co. Sligo |
proposed demolition of existing dwelling, decommissioning of existing wastewater treatment system, and their replacement with the proposed construction of a new dwelling, new ... login required. |
Details... |
1.9km |
01/09/2023 |
CONDITIONAL |
Sligo Park Hotel , Pearse Road , Sligo |
the installation of solar panels to the roof of 3 No. bedroom blocks (total area of panels approximately 1280 sq. mtrs.), together with all ancillary works. We are also applyi... login required. |
Details... |
2.8km |
03/07/2023 |
CONDITIONAL |
Dublin Road Business Park Old Dublin Road , Carrowgobbadagh Td. , Co. Sligo |
Increase in size of storage unit from 545 sq. m. as granted previously under planning reference no: PL21/201 to 654 sq. m. together with associated elevational changes... login required. |
Details... |
1.5km |
29/06/2023 |
CONDITIONAL |
Unit 9 , Sligo Retail Park Dublin Road (N4) , Carraroe |
development consisting of the proposed change of use of this unit from retail warehouse to use as a gym, proposed internal alterations to facilitate this change of use, proposed new signage to the front elevation, propos... login required. |
Details... |
2.1km |
09/05/2023 |
CONDITIONAL |
Lough Gill Distillery , Hazelwood Demesne , Co. Sligo. |
development will consist of alterations to an existing whiskey maturation storage building (permitted under PL15/296) and will include the following works including any associated site development works: 1) Demolition of a section of the existing building to create a fire break and form a standalone whiskey maturation storage building, 2) modifications to the standalone whiskey maturation storage building which will include, a) lowering the existing high-level roof on the eastern side of the building, b) removing the existing brick cladding on the western and southern façades, c) elevational alteration with the addition of new fire escapes and roller shutter doors, d) the addition of external cladding and louvred vents to the exterior walls, 3) the construction of a sprinkler valve house extension (floor area of 4.0 m²) and sprinkler valve house/electrical room extension (floor area of 10.3 m²) to the western eleva... login required. |
Details... |
240m |
20/04/2023 |
CONDITIONAL |
Aghamore Near , Carraroe , Co. Sligo |
The Development consisting of:
1. Construction of a single level dwelling house.
2. Provision of a proprietary wastewater treatment system & soil polishi... login required. |
Details... |
230m |
17/04/2023 |
CONDITIONAL |
Aughamore Near , Carraroe , Co. Sligo |
Planning Permission for the following development to my existing dwelling house
(1) remove existing conservatory
(2) construction of an extension to the re... login required. |
Details... |
50m |
04/04/2023 |
CONDITIONAL |
Island View , Aughamore Near , Carraroe Co. Sligo |
development consisting of (a) conversion of integral garage to living accommodation and (b) extension to ground floor bedroom... login required. |
Details... |
1.5km |
01/03/2023 |
CONDITIONAL |
Carrickkhenry , Carrowroe , Co. Sligo |
development consisting of erection of a modular unit to be used as a car rental hub along with the construction of an adjoining canopy to be used as a car wash/valeting bay. Site works to consist of a n... login required. |
Details... |
2.8km |
31/01/2023 |
CONDITIONAL |
Carrowgobbodagh , Carraroe , Co. Sligo |
1. Permission for construction of extension to rear of existing dwelling with associated alterations to existing plan and elevations
2. Permission to upgrade existing... login required. |
Details... |
1.9km |
19/01/2023 |
CONDITIONAL |
39 Heathview , Tonaphubble , Sligo |
development consisting of conversion of existing garage to living room, bathroom and utility room also to construct new bedroom and walk in wardrobe at first floor level to dwellinghouse... login required. |
Details... |
2.9km |
22/12/2022 |
CONDITIONAL |
Dublin Road Business Park Carrowgobbadagh Td. , Carraroe , Co. Sligo |
development consisting of construction of a 1152m2 warehouse unit to include the construction of a surface water attenuation system, connection to all services, installation of signage on the building, external lighting, boundary treatment, parking and all ancillary site works ... login required. |
Details... |
1.5km |
28/11/2022 |
CONDITIONAL |
Drumaskibbole Td. , Co Sligo |
development consisting of the construction of a new entrance to facilitate existing dwelling house... login required. |
Details... |