1.8km |
26/04/2024 |
n/a |
St. Cecilia's School, Cregg, Rosses Point, Co. Sligo F91 X283 |
A new energy centre comprising a boiler house, heat pump and gas enclosure (combined area 150m2) and ancillary site works.... login required. |
Details... |
2km |
19/03/2024 |
n/a |
Old Bundoran Road, Ballytivnan, Sligo, F91 W7P2 |
development consisting of the following: an as-built extension to rear of existing dwelling house and alteration to rear elevation of existing dwelling house together with all ancillary works... login required. |
Details... |
2.8km |
07/03/2024 |
CONDITIONAL |
Drumcliffe South , Rathcormac , Co. Sligo |
the construction of a dry bedded sheep shed with an effluent storage tank along with all associated site works ... login required. |
Details... |
1.9km |
16/02/2024 |
N/A |
Homeland Plus Deepwater Quay Sligo and Former Bachelor’s Factory Deepwater Quay Sligo F91 HR53 , , Sligo |
(a protected structure RPS no.301 se), application site area 1.087 ha. The development consists of retention of demolition of existing concrete block wall and partial demolition of stone masonry wall within the curtilage of the protected structure, and will consist of proposed revisions to layout of existing car park and yard areas, including those within the curtilage of the protected structure, to provide a total of 100 no. Car parking spaces comprised of an additional 30 no. car parking spaces, comprised of 28 no. car parking spaces within the carpark, and ... login required. |
Details... |
1.9km |
21/12/2023 |
CONDITIONAL |
Kintogher , Co. Sligo , Ireland |
to construct a dwelling house with sewage treatment system and percolation area, access onto public roadway and all associated site works ... login required. |
Details... |
2.3km |
24/11/2023 |
CONDITIONAL |
Tully Hill , Rathcormac , Sligo |
The development will consist of
A: Constructing a single storey extension to the side and front of existing 2 storey dwelling
B: Minor alterations to all existing elevations
and all ancillary site works.... login required. |
Details... |
630m |
10/11/2023 |
CONDITIONAL |
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo |
development consisting of Permission for Retention of 5 X 2000L over ground gas storage tanks with associated landscaping and services... login required. |
Details... |
1.8km |
31/10/2023 |
CONDITIONAL |
219 River Road , Cartron , Sligo |
to extend existing ground floor garage conversion forward to front wall of house and construct a first floor extension above garage conversion to side of two storey house... login required. |
Details... |
1.8km |
18/10/2023 |
CONDITIONAL |
St. Helen's , Cregg Rosses Point , Co. Sligo |
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the fr... login required. |
Details... |
1.9km |
09/10/2023 |
CONDITIONAL |
34 Cartron Bay , Cartron , Sligo |
Development consisting of to apply plaster rendering to the external walls of the building.... login required. |
Details... |
1.9km |
20/09/2023 |
CONDITIONAL |
Cregg Village , Rosses Point , Co. Sligo |
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of... login required. |
Details... |
2km |
19/09/2023 |
CONDITIONAL |
Rahaberna , Sligo , Co. Sligo |
Permission for change of house design from that previously permitted under PL 14/36 with all associated works ... login required. |
Details... |
1.9km |
15/09/2023 |
N/A |
34 Cartron Bay , Cartron , Sligo |
development consisting of the following: to apply plaster rendering to the external walls of the building... login required. |
Details... |
2.4km |
30/08/2023 |
CONDITIONAL |
SECOND SEA ROAD , SLIGO |
The development will comprise the following:
A Large-Scale Residential Development of:
A total of 127 No. residential units consisting of
a) 11 No. – Type A– 4 Bed Semi Detached Houses
4 No. – Type A1 – 5 Bed Semi Detached Houses
60 No. – Type B/B1 – 3 Bed Semi Detached/Terraced/Detached Houses
28 No. – Type C – 2 Bed Apartments
10 No. – Type D – 2 Bed Semi Detached/Terraced Dormer Houses
4 No. – Type E – 2 Bed Semi Detached Bungalow ... login required. |
Details... |
2.5km |
25/08/2023 |
CONDITIONAL |
Rahaberna , Rathcomac , Sligo |
construction of a single storey dwelling, garage, effluent treatment system, percolation area, plus ancillary site works... login required. |
Details... |
1.9km |
19/08/2023 |
N/A |
Rosses Punto Limited , Cregg Village , Rosses Point |
The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site.
The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine.
To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems.
The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the nati... login required. |
Details... |
2km |
08/08/2023 |
CONDITIONAL |
Unit No 1 St Colms Centre , Finisklin , Sligo |
free standing canopy at the loading bay at the east side of Unit No 1 St Colms Centre... login required. |
Details... |
1.8km |
25/07/2023 |
CONDITIONAL |
Deepwater Quay , Sligo , Co. Sligo |
Change of use from a coal yard to a recycling facility. This includes the demolition of an existing storage building (287m2) and the construction of a proposed recycling facility (1124m2). The proposed development also includes: Construction of a maintenance shed (287m2), 3 no. storage containers (3 x 26.5m2), skip storage areas, 15 no. car parking spaces including 1 no. EV charging ... login required. |
Details... |
2.1km |
11/07/2023 |
CONDITIONAL |
Teesan Co. Sligo , |
development consisting of the construction of a new dwelling house with sewage treatment system and separate domestic garage and all associated site development works... login required. |
Details... |