1.3km |
21/12/2023 |
CONDITIONAL |
Kintogher , Co. Sligo , Ireland |
to construct a dwelling house with sewage treatment system and percolation area, access onto public roadway and all associated site works ... login required. |
Details... |
1.2km |
10/11/2023 |
CONDITIONAL |
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo |
development consisting of Permission for Retention of 5 X 2000L over ground gas storage tanks with associated landscaping and services... login required. |
Details... |
1.9km |
16/10/2023 |
CONDITIONAL |
Ballyweelin , Rosses Point , Co. Sligo |
Development of a two storey dwelling and attached domestic carport with roof terrace over, along with new vehicular entrance and connection to public services and all ancillary site development works
(height of proposed building 8,175mm)... login required. |
Details... |
470m |
20/09/2023 |
CONDITIONAL |
Cregg Village , Rosses Point , Co. Sligo |
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of... login required. |
Details... |
2.8km |
30/08/2023 |
CONDITIONAL |
SECOND SEA ROAD , SLIGO |
The development will comprise the following:
A Large-Scale Residential Development of:
A total of 127 No. residential units consisting of
a) 11 No. – Type A– 4 Bed Semi Detached Houses
4 No. – Type A1 – 5 Bed Semi Detached Houses
60 No. – Type B/B1 – 3 Bed Semi Detached/Terraced/Detached Houses
28 No. – Type C – 2 Bed Apartments
10 No. – Type D – 2 Bed Semi Detached/Terraced Dormer Houses
4 No. – Type E – 2 Bed Semi Detached Bungalow ... login required. |
Details... |
1.8km |
25/08/2023 |
N/A |
Hazelhatch , Ballincar , Rosses Point |
development consisting of ground floor pitched roof extension to rear and shallow flat roof extension to proposed master bedroom, closing off existing set back porch on southeast corner to in... login required. |
Details... |
470m |
19/08/2023 |
N/A |
Rosses Punto Limited , Cregg Village , Rosses Point |
The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site.
The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine.
To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems.
The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the nati... login required. |
Details... |
1.2km |
06/06/2023 |
CONDITIONAL |
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo |
the erection of 22 no. single story glamping pods, and 1 no. storage building, with associated landscaping, site works and services... login required. |
Details... |
1.2km |
04/04/2023 |
CONDITIONAL |
Ballincar , Co. Sligo , N/A |
The development will consist of the provision of 3 no. new dwelling houses which will comprise:
- House Type A - 4-bedroom detached family home (267.4sqm) with storage shed (15.7sqm);
- House Type B - 4-bedroom detached family home (265.5sqm) with storage shed (15.7sqm); and
- House Type C - 4-bedroom detached family... login required. |
Details... |
1.9km |
03/04/2023 |
CONDITIONAL |
Joppa Lodge , Ballyweelin , Co.Sligo |
development consisting of the demolition of an existing two storey dwelling and replacement with a new two storey dwelling... login required. |
Details... |
1.9km |
03/01/2023 |
CONDITIONAL |
Creggyconnell , Rosses Lower Rosses Point , County Sligo |
development consisting of construction of a single storey detached domestic dwelling; a waste water treatment system; and all associated site works... login required. |
Details... |
730m |
16/12/2022 |
CONDITIONAL |
Cregg , Rosses Point , Co. Sligo |
development consisting of (1) demolish existing dwelling house and construct new single storey dwelling house with new onsite wastewater treatment system and all associated site works (2) relocate the existing vehicular entrance and all associated site works... login required. |
Details... |
1.5km |
13/10/2022 |
CONDITIONAL |
Doonierin , Rosses Point , Co. Sligo |
development consisting of the following: to extend and renovate my existing derelict dwelling house with elevational amendments to all facades. Proposed new sewerage treatment system and detached domestic garage together with all associated site development works... login required. |
Details... |
2.9km |
28/09/2022 |
CONDITIONAL |
Tully , Rathcormack , Co. Sligo |
development consisting of construction of new domestic garage and to carry out all associated ancillary site works... login required. |
Details... |
2.8km |
08/09/2022 |
CONDITIONAL |
Lisnalurg , Co. Sligo |
development consisting of single storey extensions to the side and rear of our dwelling... login required. |
Details... |
670m |
11/07/2022 |
CONDITIONAL |
Cregg , Rosses Point , Co. Sligo |
development consisting of (a) the demolition of existing adjoining garage, (b) the extension and renovation of the existing house, and (c) the decommissioning of existing septic tank and upgrade to new on-site wastewater treatment system, together with all other associated site works and services... login required. |
Details... |
2.7km |
07/06/2022 |
N/A |
Second Sea Road , Sligo , Co. Sligo |
development consisting of the following: (a) a total of 95 no. residential units consisting of 5 no. - type A - 4 bed semi detached houses 4 no. - type A1 - 5 bed semi detached houses 46 no. - type B/B1 - 3 bed semi detached/terraced houses 18 no. - type C - 2 bed apartments 8 no. - type D -1 bed semi detached/terraced bungalow houses 4 no. - type E -2 bed semi detached bungalow houses 10 no. - type F/F1 - 4 bed detac... login required. |
Details... |
100m |
26/04/2022 |
REFUSED |
Cregg , Rosses Point , Co. Sligo |
development consisting of (1) partial demolition of existing boat shed (2) conversion of boat shed & erection of dwelling in lieu (3) wastewater treatment system (4) and all associated site works... login required. |
Details... |
1km |
25/02/2022 |
CONDITIONAL |
Glenard , Ballincar , Co. Sligo |
development consisting of the following: relocation and upgrading of the existing onsite wastewater treatment system serving the dwelling house and demolition of glass house extension with all associated site works, together with alterations to existing site boundaries
... login required. |
Details... |