1.6km |
09/07/2024 |
CONDITIONAL |
Glen , Collooney , Co. Sligo |
I, Gaven Heeran, intend to apply for Planning Permission for development at Glen, Collooney, Co. Sligo
The development will consist of:
1. Construction of a new sep... login required. |
Details... |
1.8km |
28/05/2024 |
REFUSED |
Abbeytown Ballisodare Co. Sligo , |
a) The construction of 1 no. warehousing building made up of 4 no. units totalling 1,200 m2. b) New site entrance via existing business park, waste water treatment system, associated car parking, service connections and all associated site works... login required. |
Details... |
1.1km |
16/05/2024 |
CONDITIONAL |
Abbeytown , Ballysadare , Co. Sligo |
development will consisting of:
1. Carrying out renovations & alterations to an existing cottage.
2. Erection of an extension to said existing cottage.
3. Installation of new effluent treatment unit.
4. All associated siteworks
... login required. |
Details... |
1.1km |
30/04/2024 |
N/A |
Abbeytown , Ballysadare , Co. Sligo |
The development will consists of:
1. Carrying out renovations & alterations to an existing cottage.
2. Erection of an extension to said existing cottage.
3. Installation of new effluent treatment unit.
4. All associated siteworks
At Abbeytown, Ballysadare, Co. Sligo.... login required. |
Details... |
1.2km |
02/04/2024 |
CONDITIONAL |
Abbeytown Td , Ballisodare , Co. Sligo |
Planning permission to construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works at Abbeytown Td., Ballisodare, Co. Sligo.... login required. |
Details... |
2km |
16/10/2023 |
CONDITIONAL |
Glen , Collooney , County |
a detached storey and a half dwelling house & detached garage, onsite wastewater treatment system/percolation area, new vehicular entrance and all associated site works ... login required. |
Details... |
2.2km |
08/09/2023 |
CONDITIONAL |
Glen , Collooney , Co Sligo |
the construction of a new dwelling house, garage, formation of a new site entrance, new effluent treatment system, new percolation area, and all associated site works... login required. |
Details... |
2.1km |
07/11/2022 |
CONDITIONAL |
Glen , Collooney , Co Sligo |
Development consisting of construction of a new effluent treatment system, new percolation area, revisited site boundaries and all associated site works at Glen, Collooney, Co Sligo... login required. |
Details... |
1.9km |
07/03/2022 |
N/A |
Ballina Rd , Abbeytown , Ballysadare |
development consisting of the following: (a) Construction of a new 520sqm single storey building, comprising of retail area with ancillary off-licence use, 2 no. ancillary food offer counters, seating area, toilets, manager's office and ancillary storage and food preparation areas; (b) 'drive thru' take away facility associated with the food offer including ordering/collection windows; (c) Construction of a new forecourt with 4 no. pump islands and canopy over; (d) Installation of 4 no. 40,000L underground fuel storage... login required. |
Details... |
2.3km |
21/12/2021 |
CONDITIONAL |
Kinnagrelly , Coolooney , Co. Sligo |
Development consisting of permission for retention to retain the existing indoor horse arena of 676 sq metres as constructed along with ancillary site works. Previous planning ref. no: PL 21/48.... login required. |
Details... |
3km |
05/08/2021 |
CONDITIONAL |
Kilnamanagh , Co. Sligo |
development consisting of the retention of (1) revised front elevation incorporating new window to bedroom (2) revised position of dwelling house to that previously granted under PL 11/356 (3) garage as constructed... login required. |
Details... |
1.8km |
16/06/2021 |
CONDITIONAL |
Abbeytown , Ballisodare , Co. Sligo |
development consisting of the retention of alterations to previously granted dwelling planning register reference PL1623. alterations consisting of reduction of glazing on north and south elevations, 2 windows removed, 2 instanc... login required. |
Details... |
1.1km |
05/05/2021 |
CONDITIONAL |
Abbeytown , Ballisodare , Co. Sligo |
Construction of a dwelling house with the proprietary effluent treatment system, soil polishing filter and associated site works.... login required. |
Details... |
2.9km |
21/04/2021 |
CONDITIONAL |
Annaghbeg , Collooney , Co. Sligo |
development consisting of the construction of a single storey type domestic dwelling with livable accommodation in the roof space, a new site entrance, a domestic garage, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works... login required. |
Details... |
2.3km |
19/02/2021 |
CONDITIONAL |
Kinnagrelly , Collooney , Co. Sligo F91 TP08 |
development consisting of the demolition of existing old dwelling house and construct new stables with two agricultural storage sheds along with ancillary works... login required. |
Details... |