950m |
12/12/2024 |
N/A |
Killeenduff Td , Easkey , Co. Sligo |
Planning permission to demolish existing derelict ruin, construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works at Killeenduff Td, Easkey, Co. Sligo... login required. |
Details... |
0m |
16/10/2024 |
N/A |
Seafield Lodge Killeenduff Td. , Easkey , Co. Sligo |
The development will consist of 1) permission to retain and complete a partially constructed stairwell and lift core to the east elevation of the building 2) permission for alterations and amendments to exist... login required. |
Details... |
1.4km |
29/07/2024 |
CONDITIONAL |
Curraghnagap Td , Easkey , Co. Sligo |
to construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works ... login required. |
Details... |
780m |
28/06/2024 |
CONDITIONAL |
Inver View , Adervoher TD , Easkey Co. Sligo |
to carry out repair and renovation work to a protected structure (RPS No. 4) as follows; 1) Demolition of existing rear non original extension. 2) New windows to be added to the rear wall on the ground floor and first floor. 3) Replace existing pvc windows with timber sash windows to ... login required. |
Details... |
1.3km |
12/06/2024 |
CONDITIONAL |
Castletown , Easkey , Co. Sligo F26 VX75 |
to construct an extension to the existing dwelling, relocation of existing metal garden shed and to carry out ancillary site works... login required. |
Details... |
2.4km |
14/05/2024 |
CONDITIONAL |
Castletown , Easkey , Co. Sligo |
1. To retain existing dwelling
2. to retain waste water treatment system, with aeration unit, packaged tertiary intermitted filter and 300mm
deep gravel infiltration layer with all ancillary works.
3. Permission to construct 55 sq meter storage shed for domestic use.... login required. |
Details... |
520m |
18/04/2024 |
N/A |
Aderavoher , Easkey , Co. Sligo |
(1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed de... login required. |
Details... |
520m |
09/04/2024 |
N/A |
Aderavoher , Easkey , Co. Sligo |
Planning permission for (1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detach... login required. |
Details... |
1.9km |
27/03/2024 |
CONDITIONAL |
Killeenduff , Easkey , Co.Sligo. |
To construct Roofed Walled Silo together with all ancillary site works and services.... login required. |
Details... |
2.6km |
01/03/2024 |
CONDITIONAL |
Clooneen Td. Dromore West Co. Sligo. , |
to construct a two-storey dwelling house and domestic garage, install a wastewater treatment system and percolation area and carry out all ancillary site works... login required. |
Details... |
2.9km |
12/02/2024 |
CONDITIONAL |
Fortland , Easkey , Co Sligo |
Planning permission to demolish existing domestic sheds, construct new extension to existing dwelling house, together with all associated alterations and including all associated site works... login required. |
Details... |
2.4km |
31/01/2024 |
N/A |
Castletown , Easkey , Co. Sligo |
1. to retain waste water treatment system, with aeration unit, packaged tertiary intermitted filter and 300mm deep gravel infiltration layer with all ancillary works.
2. Permission to construct 55 sq meter storage shed for domestic use.... login required. |
Details... |
1.1km |
02/01/2024 |
CONDITIONAL |
Killeenduff , Easkey , Co. Sligo |
proposed alterations to developments previously granted under planning re PL21/330 - (1) Reposition roofed manure pit (2) Construction of a new walled silage slab & storage/loose shed along with all associated site works... login required. |
Details... |
2.4km |
19/12/2023 |
N/A |
Castletown , Easkey , Co. Sligo |
to retain waste water treatment system, with aeration unit, packaged tertiary intermitted filter and 300mm
deep gravel infiltration layer with all ancillary works.
Permission to construct 55 sq meter storage shed for domestic use.... login required. |
Details... |
1.3km |
24/11/2023 |
REFUSED |
eir Exchange , Castletown , Easkey Co.Sligo |
To erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.... login required. |
Details... |
1.3km |
20/11/2023 |
N/A |
eir Exchange , Castletown , Easkey Co.Sligo |
To erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.... login required. |
Details... |
1.3km |
20/09/2023 |
N/A |
eir Exchange , Castletown , Easkey Co.Sligo |
to erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing... login required. |
Details... |
1.3km |
25/08/2023 |
N/A |
eir Exchange , Castletown , Easkey Co.Sligo |
To erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing.... login required. |
Details... |
1.1km |
02/06/2023 |
CONDITIONAL |
Main Street , Easkey , Co. Sligo |
carry out repairs and maintenance work to a protected structure (RPS 181) as follows; 1) Repair sagging roof, 2) New full height window to be installed in lieu of the existing rear door opening, 3) General... login required. |
Details... |