1.1km |
16/10/2024 |
N/A |
Seafield Lodge Killeenduff Td. , Easkey , Co. Sligo |
The development will consist of 1) permission to retain and complete a partially constructed stairwell and lift core to the east elevation of the building 2) permission for alterations and amendments to exist... login required. |
Details... |
2.5km |
29/07/2024 |
N/A |
Curraghnagap Td , Easkey , Co. Sligo |
to construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works ... login required. |
Details... |
1.9km |
28/06/2024 |
CONDITIONAL |
Inver View , Adervoher TD , Easkey Co. Sligo |
to carry out repair and renovation work to a protected structure (RPS No. 4) as follows; 1) Demolition of existing rear non original extension. 2) New windows to be added to the rear wall on the ground floor and first floor. 3) Replace existing pvc windows with timber sash windows to ... login required. |
Details... |
1.6km |
18/04/2024 |
N/A |
Aderavoher , Easkey , Co. Sligo |
(1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed de... login required. |
Details... |
1.6km |
09/04/2024 |
N/A |
Aderavoher , Easkey , Co. Sligo |
Planning permission for (1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detach... login required. |
Details... |
1km |
27/03/2024 |
CONDITIONAL |
Killeenduff , Easkey , Co.Sligo. |
To construct Roofed Walled Silo together with all ancillary site works and services.... login required. |
Details... |
2km |
01/03/2024 |
CONDITIONAL |
Clooneen Td. Dromore West Co. Sligo. , |
to construct a two-storey dwelling house and domestic garage, install a wastewater treatment system and percolation area and carry out all ancillary site works... login required. |
Details... |
0m |
02/01/2024 |
CONDITIONAL |
Killeenduff , Easkey , Co. Sligo |
proposed alterations to developments previously granted under planning re PL21/330 - (1) Reposition roofed manure pit (2) Construction of a new walled silage slab & storage/loose shed along with all associated site works... login required. |
Details... |
430m |
22/08/2022 |
CONDITIONAL |
Killeenduff , Co Sligo |
development consisting of the construction of an extension to the rear of our existing house along with the removal of the existing pebble dash finish on the existing house, and refinishing the house with a painted nap plaster sand cement finish along with any other ancillary works attached... login required. |
Details... |
2.2km |
03/05/2022 |
CONDITIONAL |
Curraghnagap Td , Easkey , Co Sligo |
construction of a mobile home / caravan site to consist of: (1) 45 no mobile home bases; (2) serviced parking area for 10 no motor homes; (3) office chalet (floor area = 76.6m2); (4) shower and laundry block (floor are... login required. |
Details... |
1.6km |
12/04/2022 |
CONDITIONAL |
Adervoher Td , Easkey East ED , Co. Sligo |
development consisting of proposed development of lands consisting of 0.8853 hectares as 'Easkey Glamping Village' to consist of the following elements: (i) Works to the front roadside boundary to enable safe access and suitable sightlines, (ii) Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room, bathrooms & bin store (Total area of 223.60 m2), (iii) Communal Area with Firepit, BBQ, outdoor seating and play area, (iv) 3no. storey and ha... login required. |
Details... |
1.2km |
15/03/2022 |
CONDITIONAL |
Cloonagleavragh , Easkey , Co. Sligo |
development consisting of construction of a loose shed, walled silage slab & slatted cubicle shed with underground slurry storage tank along with all associated site works... login required. |
Details... |
1.6km |
07/03/2022 |
CONDITIONAL |
Ballymeeney Td , Dromore West , Co. Sligo |
development consisting of permission for the following: (1) Construct dwelling house, effluent treatment system and percolation area (2) Construct domestic garage/shed (3) Carry out all ancillary site works... login required. |
Details... |
1.4km |
28/02/2022 |
REFUSED |
Killeenduff , Easkey , Co Sligo |
Development consisting of the construction of a new Agricultural Machinery Shed including all other ancillary site work and services... login required. |
Details... |
3km |
30/08/2021 |
CONDITIONAL |
Ballymeeny (Armstrong) Td , Easkey East ED , Dromore West |
Development consisting of the construction of a dormer dwelling house and domestic garage, install a wastewater treatment system and percolation area and carry out all ancillary site works... login required. |
Details... |
0m |
19/08/2021 |
CONDITIONAL |
Killeenduff , Easkey , Co. Sligo |
development consisting of (1) demolition of existing buildings (2) construction of a new roofed manure pit, 4 bay enclosed dry shed with storage/office space, walled silage slab, roofed handling facility and 6 bay enclosed dry bedded shed along with all associated site works... login required. |
Details... |
350m |
12/08/2021 |
CONDITIONAL |
" Anu" Killeenduff , Easkey , Co. Sligo F26KV67 |
development consisting of the construction of an extension to existing dwelling house... login required. |
Details... |
2.1km |
03/08/2021 |
CONDITIONAL |
Clooneen , Dromore West , Co. Sligo |
Development consisting of construction of a new walled silage slab & effluent storage tank along with all associated site works... login required. |
Details... |
1.6km |
21/07/2021 |
N/A |
Adervoher Td , Easkey East ED , Co Sligo |
Development of lands consisting of .8853 hectares as 'Easkey Glamping Village' to consist of the following elements: Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room and bathrooms. (Total area of 223.60m2); Communal area with Firepit, BBQ, outdoor seating and play area; 3 no. storey and half Glamping Barns (21sqm. each X 4.1 high); 7 no. Glamping Pods (21sqm. eac... login required. |
Details... |