1.1km |
11/11/2024 |
N/A |
4 Quignalecka , Ballina , Co. Mayo |
The development will consist of 1 no. detached residential unit. The application will include for associated car parking, landscape and all ancillary site works.... login required. |
Details... |
1.1km |
07/11/2024 |
N/A |
4 Quignalecka , Ballina , Co. Mayo |
The development will consist of 1 no. detached residential unit.. The application will include for associated car parking, landscape and all ancillary site works.... login required. |
Details... |
1.5km |
29/10/2024 |
N/A |
Downhill Road , Ballina |
demolish existing dwelling and attached garage together with the construction of a replacement dwelling house with detached garage. Including all other ancillary site work and services... login required. |
Details... |
710m |
01/10/2024 |
N/A |
The Moorings , Quignalecka , Ballina |
The development will consist of the construction of new dwelling house, connection to public utilities, new site entrance together with ancillary site development works.... login required. |
Details... |
2.5km |
01/10/2024 |
N/A |
Knockatinole , Ballina , Co Mayo |
Replacement of the existing septic tank with a new effluent treatment system and percolation area and for all associated site works at an existing dwelling house... login required. |
Details... |
1.1km |
30/09/2024 |
N/A |
3 Moyvale Park , Quignalecka , Ballina Co. Mayo. |
Full planning permission for the following: (1) Demolish existing detached two-story dwelling house, (2) Construct replacement detached two-story dwelling hous... login required. |
Details... |
1.7km |
25/09/2024 |
N/A |
Site 29 Belleek Manor , Ballina , Co Mayo |
Retention and completion of 1 no. 4 bedroom dwelling houses on site number 29, for connection to public services and for all associated site works, previous planning permission reference number P15 7840... login required. |
Details... |
2.5km |
16/09/2024 |
CONDITIONAL |
Bellanira Or Iceford , Ballina , Co.Mayo |
(1) Construction of a new detached dwelling house, (2) Construction of a domestic
garage, and(3) proposed effluent treatment system and percolation area with all
associated site works at, Bellanira Or Iceford, Ballina , Co.Mayo.... login required. |
Details... |
2.4km |
11/09/2024 |
N/A |
Claddagh House , Ballina |
Section 5 Declaration: Use of guesthouse/B&B accommodation, repurposed and used by Ukranians as accommodation for International Protection Applicants... login required. |
Details... |
2.4km |
02/09/2024 |
CONDITIONAL |
Dooeaghney , Ballina , Co. Mayo |
The development will consist of construction of a single storey extension to existing dwelling house and alterations for front elevation together with ancillary site development works.... login required. |
Details... |
1.5km |
29/08/2024 |
N/A |
Downhill Road , Ballina , Co Mayo |
demolish existing dwelling house and attached garage together with the construction of a replacement dwelling house with detached garage. Including all other ancillary site work and services... login required. |
Details... |
2.7km |
23/08/2024 |
N/A |
Bellanira or Iceford Td. , Ballina , Co.Mayo |
Planning Permission to construct a single storey dwelling house, garage, install a septic tank and infiltration system, and to carry out all ancillary site works at Bellanira or Iceford Td., Ballina, Co. Mayo.... login required. |
Details... |
1.8km |
06/08/2024 |
N/A |
Bohernasup , Ballina , Co Mayo |
The development will consist of:
1. Demolition of existing unfinished terrace block structures on site.
2. Construction of a housing development with a total of 19 no. dwellings in semi-detached and terrace configurations, consisting of 6 no. 3-bed terrace houses and 3 no. 2-bed terrace houses, 4 no. 3-bed semi-detached and 6 no. 4-bed semi-detached houses.
3. Associated development and works including ... login required. |
Details... |
1.5km |
29/07/2024 |
CONDITIONAL |
Belleek , Belleek Manor , Ballina Co.Mayo |
Retention permission for the
following: (1) 2 No. roof lights located on northern roof pitch and (2) 2 No. gable windows located on east elevation, together with all associated site works at Belleek, Belleek Manor, Ballina, Co. Mayo.... login required. |
Details... |
2km |
15/07/2024 |
N/A |
5 Clare Street , Ballina , Co. Mayo |
Proposed Renovations and Extension to Existing Dwelling House including Raising the Roof Level to Match Neighbouring Property to the Right Hand Side.... login required. |
Details... |
1.8km |
07/07/2024 |
CONDITIONAL |
French road , Belleek Ballina , Co Mayo |
Planning application to (1): Construct new dwellinghouse and domestic garage (2): Install on site waste water treatment system and (3): Carry out all Ancillary Site Works at French road, Belleek, Ballina, County Mayo... login required. |
Details... |
1.8km |
27/06/2024 |
N/A |
Bohernasup , Ballina , Co Mayo |
The development will consist of:
1. Demolition of existing unfinished terrace block structures on site.
2. Construction of a housing development with a total of 19 no. dwellings in semi-detached and terrace configurations, consisting of 6 no. 3-bed terrace houses and 3 no. 2-bed terrace houses, 4 no. 3-bed semi-detached and 6 no. 4-bed semi-detached houses.
3. Associated development and works including ... login required. |
Details... |
1.8km |
05/06/2024 |
CONDITIONAL |
53 Lansyn , Bohernasup , Ballina Co. Mayo |
full planning permission for the following: (1) Demolish existing semi-detached two-story dwelling house, (2) Construct replacement semi-detached two-story dwelling house, together with all associated site works... login required. |
Details... |
2.1km |
21/05/2024 |
CONDITIONAL |
Ballyholan Td. , Ballina , Co. Mayo |
Planning permission for the following: (1) filling of land with inert soil & stones and mixtures of inert concrete, bricks, tiles & ceramics, to an approximate area of 12,00... login required. |
Details... |
1.5km |
10/05/2024 |
N/A |
Belleek , Ballina , Co. Mayo |
The development will consist of a solar PV farm on a total site area of 16.5 hectares (ha.), to include the following elements:
• linear solar photovoltaic (PV) panel arrays, providing an output of up to 23MW, ground mounted on steel supported structures with associated cabling and ducting;
• 42 no. ground mounted inverters;
• 3 no. transformer substations;
• 9 no. battery storage containers (providing up to 16MW of battery storage);
• construction of culverts along an existing drain;
• a new site access;
• Upgrades to an existing site entrance, including... login required. |
Details... |