1.5km |
19/09/2024 |
N/A |
Kilshalvy , Gurteen , Co Sligo |
(1) a new effluent treatment system and percolation area (2) to retain revised site boundaries (3) to retain existing garage (4) to retain existing domestic shed (5) to retain existing windows in gables of existing house (6) and all associated site works... login required. |
Details... |
2.3km |
15/08/2024 |
CONDITIONAL |
Moydough , Gurteen , Co Sligo |
(1) construct a new 4.60 Sq.m porch to front of existing dwelling and (2) construct a 6.30 Sq.m bathroom extension to the rear of the existing dwelling (3) remove a chimney along with associated site works... login required. |
Details... |
600m |
18/04/2024 |
CONDITIONAL |
Green Isle Foods Ballymote Road Gurteen Co Sligo F56 PC62 , |
(1) Retain the existing two number steel tech shed office extensions to the existing building (total floor area 52sqm), (2) Retain the existing two number cold storage container extensions to the existing building (total floor area 102sqm), (3) and all associated site works ... login required. |
Details... |
920m |
21/03/2024 |
CONDITIONAL |
Rathmadder , Gorteen , Co. Sligo |
development consisting of the following: the construction of single storey extension to national school (circa 361 sqm). Accommodation will include mainstre... login required. |
Details... |
920m |
01/03/2024 |
N/A |
Rathmadder , Gorteen , Co. Sligo |
development consisting of the following: the construction of single storey extension to national school (circa 632 sqm). Accommodation will include mainstream... login required. |
Details... |
2.3km |
24/10/2023 |
CONDITIONAL |
Riverstown , Gorteen , Co. Sligo |
Planning permission for a renewable wind energy development of a one (1) turbine wind farm. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo.
The development will comprise of one (1) electricity generating wind turbine, which will have an overall maximum tip ... login required. |
Details... |
1.2km |
20/09/2023 |
CONDITIONAL |
Main Street , Gorteen , Co Sligo |
(1) part demolition of the existing single storey extension to the rear of my dwelling house (2) a new single-story extension to the side and rear of my existing dwelling house (3) modifications to the existing fro... login required. |
Details... |
1.5km |
16/07/2023 |
CONDITIONAL |
Cuilmore , Gurteen , Co. Sligo |
1. An extension to the rear of an existing cottage. 2. A new front porch. 3. A new sewage treatment plant with raised tricel puraflo modules and a distribution area. 4. Minor alterations to existing cottage. 5. And all ancillary site works at this site... login required. |
Details... |
240m |
06/04/2023 |
CONDITIONAL |
7 Cluain Dara , Gurteen , Co. Sligo |
development consisting of construction of a side and rear extension to existing dwelling house, together with all ancillary site works and connection to existing services on site... login required. |
Details... |
0m |
27/03/2023 |
CONDITIONAL |
Knocknashammer , Gurteen , Co Sligo. |
development consisting of the following: to construct 5 no. 2 storey detached houses and 8 no. 2 storey semi detached houses with new access onto public road and all associated site works including connection to existing public sewer... login required. |
Details... |
990m |
10/03/2023 |
CONDITIONAL |
RATHMADDER , GURTEEN , CO. SLIGO |
(1) Construction of an all weather pitch with associated fencing, dugouts and floodlighting, (2) Proposed new vehicular access road to existing parking area, (3) Signage indicating location of proposed football pitch, together with all associated site works ... login required. |
Details... |
2.5km |
03/11/2022 |
CONDITIONAL |
Kilfree , Gurteen , Co. Sligo |
development consisting of (a) retain independent living unit to the front of existing dwelling house (b) retain extension to rear of existing dwelling house where it differs from that previously granted PL11/243 (c) retain entrance porch to fr... login required. |
Details... |
760m |
28/09/2022 |
CONDITIONAL |
Rathmadder Td , Gorteen , Co. Sligo |
development consisting of (1) retention of rear extension to the northeast and northwest of the existing workshop (2) retention of first floor flat roof dwelling extension (3) reduce the curtilage of the house for use as private garden for the dwelling with the remainder for use ancillary to the workshop (4) change the first floor door on the northwest ele... login required. |
Details... |
1.5km |
11/02/2022 |
CONDITIONAL |
Cloonsillagh , Gurteen , Ballymote |
Development consisting of: 1) Alterations to elevations of dwelling permitted under PL02/145, 2) Garage as constructed differs in size and location from that permitted ... login required. |
Details... |
620m |
18/01/2022 |
CONDITIONAL |
Rathmadder , Gurteen , Co. Sligo |
Development consisting of permission to (a) retain location of dwelling house as built on site, (b) retain location of garage as built on site, (c) retain existing site boundaries, (d) retain exis... login required. |
Details... |
1.3km |
16/11/2021 |
CONDITIONAL |
Kilstraghlan or Ragwood Td. , Gurteen , Co. Sligo |
development consisting of the following (a) retention of dwelling house as constructed on site where it differs to that granted in previous planning reference PL15/429, (b) ... login required. |
Details... |
1.6km |
28/09/2021 |
N/A |
Cuilmore , Gurteen , Co. Sligo |
Development consisting of (1) The demolition of a single storey side extension (2) The construction of a front and side single storey extension (3) Alterations to the roof design of the existing dwelling house with all associated site works ... login required. |
Details... |
1.8km |
30/06/2021 |
CONDITIONAL |
Lisbaleely , Co. Sligo |
Development consisting of (1) construction of a new detached dwelling house (2) construction of a domestic garage and (3) proposed effluent treatment system and percolation area and all associated site works... login required. |
Details... |
220m |
28/05/2021 |
CONDITIONAL |
Rathmadder , Gurteen , Co. Sligo |
development consisting of the following; (a) remove the existing temporary childcare unit on site, (b) erect a permanent classroom unit on site and connect to existing services on site, together with all ancillary site works... login required. |
Details... |