2.5km |
13/08/2024 |
N/A |
Tumgesh , Swinford |
Section 5 Declaration: Dry store shed... login required. |
Details... |
2.8km |
29/05/2024 |
CONDITIONAL |
Doonmaynor , Killasser , Swinford Co. Mayo. |
1. Full Planning Permission for the demolition of existing sheds and decommissioning of existing septic tank system, the construction of a single storey extension to the side of an existing dwellinghouse, together... login required. |
Details... |
2.8km |
17/02/2024 |
N/A |
Cloongullaun , Swinford , Co. Mayo |
The development will consist of a new extension to the existing derelict cottage, new septic tank system and percolation area. The derelict cottage is to be retained and renovated but c... login required. |
Details... |
2.8km |
23/12/2023 |
N/A |
Cloongullaun , Swinford , Co. Mayo |
The development will consist of a new extension to the existing derelict cottage, new septic tank system and percolation area. The derelict cottage is to be retained and renovated but c... login required. |
Details... |
2km |
27/08/2023 |
CONDITIONAL |
Rubble , Killasser , Mayo |
The development will consist of construction of a new single dwelling house, domestic garage, wastewater treatment system and percolation area along with all ancillary site works.... login required. |
Details... |
1.9km |
17/07/2023 |
CONDITIONAL |
Carrowmoremoy , Killasser |
demolish existing derelict dwelling house, construct a proposed new dwelling house, domestic garage, septic tank system and percolation area, complete with all associated works... login required. |
Details... |
2.4km |
18/05/2023 |
CONDITIONAL |
Doonmaynor , Killasser , Mayo |
Construction of a new dwelling house, construction of a domestic garage and provision of a proprietary wastewater treatment system... login required. |
Details... |
2.9km |
08/05/2023 |
CONDITIONAL |
Rathscanlan , Kilbride , Swinford |
Permission for the addition of paired and alternating deflectors, excavation of pools and the addition of random boulders and spawing gravel in the Swinford River. An NIS has been submitted with this application... login required. |
Details... |
2.8km |
09/02/2023 |
CONDITIONAL |
Swinford Waste Water Treatment Plant , Lagcurragh , Swinford |
Ground mounted photovoltaic solar panels with a maximum actual square metreage of 680m2 distributed over grass areas on-site with associated ancillary works. (A NIS is submitted with the application)... login required. |
Details... |
950m |
02/01/2023 |
CONDITIONAL |
Loobnamuck , Kilasser , Swinford |
The construction of a new dwelling house, garage, carport, on-site wastewater treatment system, and connection to existing services together with all ancillary site development works... login required. |
Details... |
2.1km |
07/11/2022 |
N/A |
Rubble , Killasser , Swinford |
Construction of a new dwelling house, domestic garage, septic tank and percolation area along with ancillary site works... login required. |
Details... |
2.7km |
20/05/2022 |
CONDITIONAL |
LAGCURRAGH , SWINFORD |
DEMOLITION OF A DERELICT DWELLING HOUSE, CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |
1.7km |
14/02/2022 |
CONDITIONAL |
DROMADA , (DUKE) , KILLASSER |
CONSTRUCT A PROPOSED NEW DWELLING HOUSE, GARAGE, SEPTIC TANK SYSTEM AND PERCOLATION AREA, COMPLETE WITH ALL ASSOCIATED WORKS... login required. |
Details... |
2.3km |
10/01/2022 |
CONDITIONAL |
LAGCURRAGH , SWINFORD , CO. MAYO |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |
2.3km |
03/12/2021 |
N/A |
LAGCURRAGH , SWINFORD |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS ... login required. |
Details... |
2.3km |
12/08/2021 |
REFUSED |
LAGCURRAGH , SWINFORD , CO. MAYO |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, NEW SITE ENTRANCE TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |
1.8km |
19/05/2021 |
CONDITIONAL |
TUMGESH , SWINFORD |
RETENTION OF CHANGES TO HOUSE TYPE AND SITE LAYOUT TO INCLUDE RETENTION PERMISSION FOR THE ON-SITE EFFLUENT TREATMENT SYSTEM AND DOMESTIC SHED TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |