2.9km |
28/08/2024 |
CONDITIONAL |
Castlereagh , Killala , Co. Mayo |
Planning permission for retention of domestic shed and to carry out all ancillary site works.... login required. |
Details... |
2.9km |
23/05/2024 |
CONDITIONAL |
Kilroe Townland , Killala |
extend and renovate existing dwelling house including an upgrade and relocation of septic tank/proprietary effluent treatment system together with all ancillary site works and services... login required. |
Details... |
1.9km |
14/05/2024 |
CONDITIONAL |
Killala Business Park , Tawnaghmore Lower , Killala Co.Mayo |
Planning permission sought for (1) Installation of 2 no. proposed bulk storage silos (13.1m high) to the rear of existing building with all associated siteworks, (2) Alterations to site boundaries, (3) Retention of detached temporary prefabrication office ancill... login required. |
Details... |
730m |
18/09/2023 |
CONDITIONAL |
Farragh , Killala , Co.Mayo |
The application will consist of planning permission to (1) Demolish part of existing house and existing porch, (2) Demolish existing shed, (3) Construct extension and carry out alteratio... login required. |
Details... |
1.7km |
10/07/2023 |
N/A |
Old Ashai Plant , Killala Business Park , Killala |
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the south of the site ,will consist of a Double Storey Electrolyser Building of up to 24m height; Fin Fan Coolers of up to 10.5m height; Hydrogen Storage Area of 7m height; Hydrogen Gas Tube Filling Station of up to 9m height, Gas Injection Compound and Gas Above Ground Installation Building of 4m height; Electrical Substation up to 15m height and Ancillary Equipment Building of up to 3m height; Fire Water Tank of up to 14m height; Pump House of up to 5m height; Administration/welfare building and control block building of up to 4m height.
The Energy Centre, to the north of the site, will consist of 9no. Gas Engines generating up to 106MW of power, housed in a Gas Engine Building of up to 13.6m height with two stacks of up to 25m height, Distillate fuel tank of up to 11.2m height, Firewater tank of up to 10m height, associated pumps, sludge tank of 2.1m height and Pump house of 5... login required. |
Details... |
290m |
22/05/2023 |
CONDITIONAL |
Mullafarry Townland , Killala , Co. Mayo |
The development will consist of an Inert Waste Recovery Facility within an application area of c. 1.8 Ha.... login required. |
Details... |
1.8km |
28/04/2023 |
CONDITIONAL |
Tawnaghmore Upper and Tawnaghmore Lower , Killala , Co. Mayo |
A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no.), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no.), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no.), boiler additive conveyors with associated magnetic separators, boiler additive ... login required. |
Details... |
1.7km |
21/04/2023 |
N/A |
The townlands of Tawnaghmore Lower and Meelick , Killala , Ballina |
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the south of the site ,will consist of a Double Storey Electrolyser Building of up to 24m height; Fin Fan Coolers of up to 10.5m height; Hydrogen Storage Area of 7m height; Hydrogen Gas Tube Filling Station of up to 9m height, Gas Injection Compound and Gas Above Ground Installation Building of 4m height; Electrical Substation up to 8m height and Ancillary Equipment Building of up to 3m height; Fire Water Tank of up to 14m height; Pump House of up to 5m height; Administration/welfare building and control block building of up to 4m height.
The Energy Centre, to the north of the site, will consist of 9no. Gas Engines generating up to 106MW of power, housed in a Gas Engine Building of up to 13.6m height with two stacks of up to 25m height, Distillate fuel tank of up to 11.2m height, Firewater tank of up to 10m height, associated pumps, sludge tank of 2.1m height and Pump house of 5m Height, ... login required. |
Details... |
3km |
13/12/2022 |
CONDITIONAL |
Rathcash , Killala |
demolish existing detached dwelling house, construct replacement detached dwelling house, construct domestic shed (adjoining existing shed) together with all associated site works... login required. |
Details... |
2.7km |
24/10/2022 |
CONDITIONAL |
CARROWREAGH , KILLALA , CO. MAYO |
DEMOLISH EXISTING DETACHED DORMER BUNGALOW DWELLING HOUSE AND CONSTRUCT A REPLACEMENT TWO STOREY DWELLING HOUSE WITH ALL ASSOCIATED ANCILLARY SITE WORKS... login required. |
Details... |
1.8km |
15/08/2022 |
CONDITIONAL |
RATHOWEN WEST , KILLALA , CO. MAYO |
REMOVAL AND REPLACEMENT OF THE EXISTING ROOF STRUCTURE TO CREATE A FIRST FLOOR LEVEL, EXTENSION TO SIDE AND REAR ELEVATIONS, ALTERATIONS TO FRONT ELEVATION, NEW ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |
2.1km |
08/07/2022 |
CONDITIONAL |
KILLALA BUSINESS PARK , KILLALA , CO. MAYO |
ERECTION OF A ONE-STOREY EXTENSION TO EXISTING CABLE LANDING STATION, PROPOSED ESB SUBSTATION AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.1km |
09/06/2022 |
CONDITIONAL |
RATHOWEN EAST , KILLALA , CO. MAYO |
CONSTRUCT NEW CLUBHOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA INCLUDING ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.8km |
09/06/2022 |
CONDITIONAL |
MOYNE , KILLALA , BALLINA |
CONSTRUCTION OF 1 NO. DWELLING HOUSE, DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM WITH SOIL POLISHING FILTER, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |
2.3km |
12/04/2022 |
CONDITIONAL |
MEELICK , KILLALA , CO. MAYO |
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH EFFLUENT TREATMENT SYSTEM AND FOR ALL ASSOCIATED SITE WORKS ON THIS SITE... login required. |
Details... |
2.5km |
09/12/2021 |
CONDITIONAL |
MEELICK , KILLALA , CO MAYO |
CONSTRUCTION OF NEW DWELLING HOUSE AND ON SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
09/12/2021 |
CONDITIONAL |
MEELICK , KILLALA , CO MAYO |
RETENTION OF ALTERATIONS TO EXISTING DWELLING HOUSE ON ALTERED SITE BOUNDARIES... login required. |
Details... |
2.6km |
15/10/2021 |
CONDITIONAL |
CARROWREAGH , KILLALA |
DEMOLISH EXISTING DWELLING HOUSE, CONSTRUCT NEW DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND DETACHED DOMESTIC GARAGE INCLUDING ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.7km |
09/09/2021 |
CONDITIONAL |
CARROWREAGH , KILLALA |
RETENTION OF SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING. DEMOLITION OF EXISTING DETACHED DWELLING HOUSE, TO EXCLUDE REAR EXTENSION, CONSTRUCTION OF REPLACEMENT DWELLING HOUSE, REVISED SITE BOUNDARIES FROM PREVIOUS PL REF 04/1510 TOGETHER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |