2.4km |
13/03/2024 |
CONDITIONAL |
Aghleam , Blacksod , Ballina Co. Mayo |
Retention planning permission for all alterations and
extensions to the existing dwelling house as built, upgrade existing wastewater
treatment system and to carry out all ancillary site works. (Previous Planning
Permission reference no. P79/998 refers to the property)... login required. |
Details... |
2.4km |
21/02/2024 |
CONDITIONAL |
Scoil Bhreandáin , Eachleim , Belmullet Co. Mayo |
Planning permission to carry out works to existing primary school at Scoil Bhreandáin, Eachleim, Belmullet, Co. Mayo F26P704. Proposed works will consist of: (1) demolition of existing storm porch (2sq.m); (2) construction of new extension (A) to the rear of the school to accommodate 2 new (80sq.m) mainstream classrooms, total floor area of (166.0sq.m). (3) construction of new extension (B) to the front of the school to acco... login required. |
Details... |
870m |
04/12/2023 |
CONDITIONAL |
Newtown , Clogher , Ballina Mayo |
The development shall consist of planning permission for the erection of a dwelling house, installation of a proprietary treatment unit including a percolation/tertiary area and to include all other ancillary site services and development works associated with this permission.... login required. |
Details... |
930m |
20/09/2023 |
CONDITIONAL |
Elly , Clogher , Ballina |
new dwelling with sewage treatment system and percolation area, redevelopment of existing farm entrance for residential use, together with all ancillary site development works... login required. |
Details... |
1.8km |
31/05/2023 |
CONDITIONAL |
Aghleam , Blacksod Ballina , Co. Mayo |
permission for the retention of a dwelling house constructed on revised boundaries, and the installation of a proprietary wastewater treatment system... login required. |
Details... |
2.2km |
23/03/2023 |
REFUSED |
Elly , Clogher , Ballina Co. Mayo |
Construction of a detached dwelling house, domestic garage, proprietary sewage treatment system and all associated site works... login required. |
Details... |
2.2km |
14/07/2022 |
REFUSED |
ELLY , CLOGHER , BALLINA |
CONSTRUCT A DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2km |
14/07/2022 |
CONDITIONAL |
AUGHLEAM , BLACKSOD , BALLINA |
DEMOLITION OF EXISTING SHEDS AND TO ERECT A 2 BEDROOM HOLIDAY DWELLING, THIS WILL ALSO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS... login required. |
Details... |
2.2km |
01/06/2022 |
N/A |
ELLY , CLOGHER , BALLINA |
CONSTRUCTION OF A DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
770m |
18/05/2022 |
CONDITIONAL |
EIR EXCHANGE , NEWTOWN , BALLINA |
REPLACING TWO 12M HIGH WOODEN POLES WITH A 15M HIGH TELECOMMUNICATIONS MONOPOLE STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT ALL ENCLOSED BY SECURITY FENCING... login required. |
Details... |
550m |
08/02/2022 |
CONDITIONAL |
TIRRAUN , CLOGHER , BALLINA |
ERECTION OF A DOMESTIC USE GARAGE/SHED AND TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS ASSOCIATED ... login required. |
Details... |
2.9km |
03/02/2022 |
N/A |
BARRACK SOUTH , CLOGHER , BALLINA |
CHANGE OF USE OF THE EXISTING CAR PARK SERVING THE DISUSED CURRACH LOUNGE BAR TO AN OVERNIGHT MOTOR HOME PARKING FACILITY TOGETHER WITH ALL ASSOCIATED SITE WORKS, SIGNAGE, AND CONNECTION INTO EXISTING SERVICES... login required. |
Details... |
2.9km |
22/07/2021 |
N/A |
BARRACK SOUTH , CLOGHER , BELMULLET |
SECTION 5 DECLARATION:USE OF EXISTING CAR PARK SERVING THE DISUSED CURRACH LOUNGE BAR AS AN OVERNIGHT MOTOR HOME PARKING FACILITY... login required. |
Details... |
1.9km |
09/07/2021 |
CONDITIONAL |
OILIGH (ELLY) , CLOGHER , BALLINA |
DEMOLISH EXISTING DETACHED DWELLING HOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
540m |
10/05/2021 |
CONDITIONAL |
TIRRAUN , CLOGHER , BALLINA |
ERECTION OF A DWELLING HOUSE, INSTALLATION OF A PROPRIETARY TREATMENT UNIT INCLUDING A PERCOLATION AREA AND TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
27/04/2021 |
CONDITIONAL |
AUGHLEAM , BLACKSOD , BALLINA |
CONSTRUCT NEW EXTENSION TO THE SOUTH EASTERN ELEVATION OF THE EXISTING DWELLING ... login required. |
Details... |
910m |
09/04/2021 |
CONDITIONAL |
OILIGH (ELLY) , CLOGHER , BALLINA |
DEMOLISH EXISTING DETACHED DWELLING HOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.5km |
03/03/2021 |
N/A |
AUGHLEAM , BLACKSOD , BALLINA |
CONSTRUCTION OF A NEW EXTENSION TO THE SOUTH EASTERN ELEVATION OF THE EXISTING DWELLING ... login required. |
Details... |