460m |
01/10/2024 |
N/A |
The Mission Office 132 - 135 Church Street Dublin 7 |
PROTECTED STRUCTURE permission for development at the Mission Office, 132 - 135 Church Street, Dublin 7, a two storey building and Protected Structure. The development will consist of internal alterations only, including the removal of non-original stud partitions and their replacem... login required. |
Details... |
350m |
27/09/2024 |
N/A |
Site of approx. 0.09 ha on lands at Fegan's 13-18 Chancery Street and 1-1a St. Michan's Place Dublin 7 D07 A275 |
The site is generally bounded by a Dublin City Council car park and multi-use games area to the north; Chancery Street to the south; 19-20 Chancery Street and St. Michan's Place to the west; and 8-12 St. Michan's Street and St. Michan's Street to the east.
The development will consist of:
a) The demolition of all existing buildings and structures on site (1-4 storeys) including reconfiguration of part basement level (total GFA approx. 1,794 sq m) and the construction of a 7 - 8 storey (approx. 26.4 m overall height) over part basement level building (total GFA approx. 5,635 sqm) accommodating 12 no. residential apartment units (approx. 1,180 sq m) and a 96 no. bedroom tourist hostel (approx. 4,455 sq m) with additional plant, tank room and ESB substation.
b) The 12 no. residential apartment units will consist of 6 no. 1-bed units and 6 no. 2-bed units located across first to sixth floor level, each with an associated private open space area in the form of a balcony. Pedestrian access to the residential apartment units is proposed via St. Michan's Street. Communal open space (approx. 76 sqm) for the residential units is provided at seventh floor level in the form of a roof terrace. A total of 28 no. bicycle parking spaces are proposed for the residential units (22 no. at basement level and 6 no. at ground floor).
c) Provision of a 96 no. bedroom tourist hostel accommodating 599 no. bedspaces in a mixture of accessible, twin and 4 - 10 no. person bedrooms from first to s... login required. |
Details... |
460m |
25/09/2024 |
APPLICATION DECLARED INVALID |
The Mission Office 132 - 135 Church Street Dublin 7 |
PROTECTED STRUCTURE : The development will consist of internal alterations only, including the removal of non-original stud partitions and their replacement with new relocated partitions at ground floor level, and the replacement of... login required. |
Details... |
320m |
13/09/2024 |
N/A |
17 Inns Court Winetavern Street Dublin 8 |
The change of use of an existing 2 storey office unit (floor area 59 m²) to residential (1 No. 1 bed apartment for use as short term or long term letting) and all associated external works.... login required. |
Details... |
260m |
06/09/2024 |
N/A |
79 Thomas Street Dublin 8 |
PROTECTED STRUCTURE : Permission for development at 79 Thomas Street, Dublin 8, on corner with Francis Street. A Protected Structure (RPS 8169). The development will consist of repair works to fire damaged stone on the Francis Street Elevation. The works are within a conservation area.... login required. |
Details... |
260m |
05/09/2024 |
N/A |
79 Thomas Street Dublin 8 |
PROTECTED STRUCTURE / RETENTION (RPS. 8169) : the proposed development consists of full cleaning of the exterior facade. The works were carried out within a conservation area.... login required. |
Details... |
260m |
22/08/2024 |
APPLICATION DECLARED INVALID |
79 Thomas Street Dublin 8 on corner with Francis Street. |
PROTECTED STRUCTURE:The development will consist of repair works to fire damaged stone on the Francis Street Elevation. The works are within a conservation area.... login required. |
Details... |
260m |
22/08/2024 |
APPLICATION DECLARED INVALID |
79 Thomas Street Dublin 8 |
RETENTION PERMISSION for development at 79 Thomas Street Dublin 8, on a corner with Francis Street, A Protected Structure (RPS 8362). The proposed development consists of full cleaning of the exterior facade. The works were carried out within a conservation area.... login required. |
Details... |
370m |
06/08/2024 |
ADDITIONAL INFORMATION |
37 Thomas Street The Liberties Dublin 8 |
RETENTION PERMISSION for development at this site 37 Thomas Street The Liberties, Dublin 8. A Protected Structure RPS Ref: No: 8154). The development will... login required. |
Details... |
380m |
24/07/2024 |
GRANT PERMISSION |
Rumi Cafe Bar 28 Francis Street Dublin 8 D08 PF61 |
Permission for installation of an awning to front facade facing at Francis Street at Rumi Cafe Bar, 28 Francis Street, Dublin 8, D08 PF61... login required. |
Details... |
350m |
19/07/2024 |
GRANT PERMISSION |
Cunningham House 130 Francis Street Dublin 8 |
Permission for change of use from commercial use to education use with internal alterations.... login required. |
Details... |
450m |
18/07/2024 |
ADDITIONAL INFORMATION |
15 Usher's Island Dublin 8 D08XN67 |
PROTECTED STRUCTURE : Permission Brimwood Unlimited for development at 15 Usher's Island Dublin 8, DO8 XN67- A Protected Structure, Ref. RPS 8198. The development consists of: (i) Change of use from visitor centre to residential development comprising 10 no. apartments (3 no. x studios and 7 no. x one-bed units); (i) Provision of a communal external terrace to rear at ground floor level; (iii) Internal alterations to facilitate apartment layouts including erection of partition walls to facilitate fire lobbies & bathrooms in each unit; (iv) Part removal of non-original eastern ground floor return; (v) Replacement of roof light and installation of roof vents; (vi) Cleaning of existing brickwork to front and repair and repointing of brickwork to rear; (vii) Repair and replacement where requ... login required. |
Details... |
460m |
17/07/2024 |
REFUSE PERMISSION |
Site at Thomas Street including No. 144 Thomas Street (the site is bounded by No. 143 Thomas Street and Marshalsea Lane to the east and No's 151-156 Thomas Street to the west) Dublin 8 |
The proposed development comprises site clearance works, including the demolition of all existing buildings /structures on site, including the existing boundary wall and gates along the Thomas Street frontage, and the construction of a new Part 3-; Part 4-; Part 6- and Part 7- storey Aparthotel building over basement level with a total Gross Floor Area (GIA) of 6,790 sq.m together with the formation of a new vehicular access ramp (with integrated bicycle lane) off Thomas Street leading to basement level. The basement level will accommodate 16 no. cycle parking spaces; staff changing-rooms/showers; a service yard and ancillary plant and storage rooms; waste/refuse storage; ancillary gy... login required. |
Details... |
320m |
15/07/2024 |
GRANT PERMISSION |
Tailors Hall 8 Back Lane Dublin 8 D08 X2A3 |
PROTECTED STRUCTURE:1. The erection/fixing of wall mounted black cased LED floodlights and associated service cables, affixed to the external fabric of the protected structure facing into the rear yard which bounds High Street. 2. The fixing/erection of wall mounted black security cameras, black speakers and associated service cables affixed to the external fabric of the protected structure facing the rear yard which bounds High Street. 3. The placing of horse box trailer to facilitate the sale of tea/coffee, on the rear yard which bounds High Street. 4. The placing of numerous picnic style table/ seating benches in both the front garden bounding Back Lane and in the rear yard bounding High Street. 5. The fixing of a canvas banner type sign to the high level railings adjacent to the rear yard which bounds High Street. 6. The erection/ placing of 5 number lamp posts running through the non- original boundary railings at various locations along the party boundary, which bounds High Street. 7. The erection/fixing of a wall mounted ... login required. |
Details... |
400m |
05/07/2024 |
N/A |
8 Meath Street Dublin 8 |
PERMISSION The development consists of the demolition of a part 2 storey part single storey area to the rear of 8 Meath Street facing Hanbury Lane Dublin 8 and for alterations to the ground ... login required. |
Details... |
410m |
18/06/2024 |
GRANT PERMISSION |
Dublin City Council Headquarters Civic Offices Block 1 Woodquay Dublin 8 |
Permission to install spectrum monitoring equipment on the chimney of block 1. This spectrum monitoring equipment consists of three receive only antennas, along with a radio control unit.... login required. |
Details... |
340m |
04/06/2024 |
GRANT PERMISSION |
Centra 50 Thomas Street The Liberties Dublin 8 D08 E89T |
Installation of an ATM machine to the existing North street facing shop front.... login required. |
Details... |
290m |
29/05/2024 |
GRANT PERMISSION |
Staycity Christchurch Hall High Street Dublin 8 D08E188 |
The development will consist of the erection of new signage consisting of: • A horizontal sign (2.7m x 0.7m) over the main entrance on High Street; • A horizontal sign (3.2m x 1m) on the corner of Back Lane and High S... login required. |
Details... |
410m |
27/05/2024 |
APPLICATION DECLARED INVALID |
Dublin City Council Headquarters Civic Offices Wood Quay Dublin 8 |
The Commission for Communications Regulations (ComReg) intend to apply for permission to install spectrum monitoring equipment on the chimney of Block 1 Dublin City ... login required. |
Details... |
310m |
20/05/2024 |
GRANT PERMISSION |
Staycity Aparthotel 135 Francis Street Dublin 8 D08 P5N2 |
The development will consist of the erection of new signage consisting of: - • A horizontal sign (2.4m x 0.6m) over the main entrance on Francis Street; • A horizontal sign (2.4m x 0.6m) in the internal courtyard; • 2 no. illuminated plaques (0.5m x 0.5m) loca... login required. |
Details... |