0m |
10/04/2024 |
N/A |
Milano 6 Excise Walk Dublin 1 |
Permission for the installation of: 2 sets of halo illuminated fascia text, 1 set of non illuminated fascia text and 4 non illuminated awnings.... login required. |
Details... |
90m |
08/04/2024 |
N/A |
25-28 North Wall Quay Dublin 1 D01 H104 |
PERMISSION & RETENTION PERMISSION for development at the A&L Goodbody Building, 25-28 North Wall Quay, Dublin 1, DO1 H104. The site is bound by North Wall Quay to the south, an access ramp to existing basement to the east, Alderman Way to the north and the Spencer Hotel/an unnamed laneway to the west.
The proposed development consists of the following amendments to the external elevations, internal layout and
roof layout of the permitted building under Reg. Ref.: 3245/20 (as amended by Reg. Ref.: 4202/21) which is currently under construction:
Planning permission is sought for:
1. Change in materiality to the southern stair cores.
2. Alterations to the main entrance to improve universal access.
3. Changes to the number and location of external doors.
4. Addition of a security gate to the basement car park.
5. Amendments to the reception and main core layouts.
6. Alterations to the landscaping to the south of the building.
7. Amendments to the landscaping to the north, east and west to allow for ESB access requirements (resulting
in the loss of 1 no. car parking space)
8. Provision of a lightwell to the basement area.
9. Changes at basement level to provide additional space for Active commuter Facilities.
10. Reconfiguration of the basement layout resulting in a reduction from 64 no. to 58 no. car parking spaces an... login required. |
Details... |
420m |
04/04/2024 |
N/A |
Plaza 3 Custom House Plaza Harbourmaster Place I.F.S.C. Dublin 1 |
The development will consist of: Change of use of level 3 and level 5 of Plaza 3 from office space to medical use containing consultant suites and various adult outpatient care services. The proposals include modifications to the internal layout of levels 3 & 5 to facilitate the me... login required. |
Details... |
0m |
02/04/2024 |
APPLICATION DECLARED INVALID |
Milano Unit 6 Excise Walk Dublin 1 |
Permission for the installation of:- 2 sets of halo illuminated fascia text, 1 set of non illuminated fascia text and 4 non illuminated awnings.... login required. |
Details... |
330m |
28/03/2024 |
N/A |
On the public footpath at Guild Street corner of Seville Place Dublin 1 |
RETENTION: The development which is in a Strategic Development Zone, will consist of the retention of the existing scrolling internally illuminated double sided 'Metropole' advertising display case mounted on an offset leg.... login required. |
Details... |
330m |
26/03/2024 |
APPLICATION DECLARED INVALID |
On the public footpath at Guild Street corner of Seville Place Dublin 1 |
RETENTION: The retention of the existing scrolling internally illuminated double sided 'Metropole' advertising display case mounted on an offset leg.... login required. |
Details... |
350m |
12/03/2024 |
N/A |
Spar George's Dock I.F.S.C. Dublin 1 |
Change of use from Retail to Coffee Shop/Restaurant/Hot Food Take Away use at ground floor & mezzanine levels & all associated works.... login required. |
Details... |
80m |
23/02/2024 |
REFUSE PERMISSION |
CitiGroup Building 1 North Wall Quay Dublin 1 D01T8Y1 |
We, NWQ Devco Limited, intend to apply for a 10-year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, DO1 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha.
The proposed development comprises:
•Demolition of existing 6 no. storey office building and single-level basement;
•Construction of a mixed-use development ranging in height from 9 no. to 17 no. storeys in height (73.4m) over lower ground floor and double basement comprising office accommodation, arts/community/cultural spaces and retail/cafe/restaurant uses;
•The development is divided into 4 no. buildings ranging in heights of 12 no. storeys (Block A), 17 no. storeys (Block B), 10 no. storeys (Block C) and 9 no. storeys (Block D);
• The overall gross floor area of the development comprises 87,209 sq.m. (excluding double basement of 14,420 sq.m.) including 69,258 sq.m. of office space, 2,371 sq.m. arts/community/cultural uses and 196 sq.m. of retail/café/restaurant space;
• Office accommodation is proposed at lower-ground floor to 15th floor with 4 no. double-height office entrance/receptions areas provided at GF level;
• 3 no. internal arts/community/cultural spaces are provided in total. 1 no. arts/community/cultural space is provided over lower ground and ground floor level in Block A, 1 no. at 1st floor level with a GF entrance space in Block B and an arts/community/cultural use with viewing deck is provided at 16th floor level in Block B;
• External arts/community/cultural space will be provided on th... login required. |
Details... |
470m |
18/01/2024 |
GRANT PERMISSION |
49-51 Third Avenue Serville Place Dublin 1 D01 X276 |
Conversion of a previously combined property into its original two dwellings, to create two separate dwellings No 49 Third Avenue, Seville Place, and No 51 T... login required. |
Details... |
470m |
17/01/2024 |
GRANT PERMISSION |
19 Magennis Place Dublin 2 |
Change Of Use from "office" to "educational" use.... login required. |
Details... |
340m |
10/01/2024 |
GRANT PERMISSION |
Building R Spencer Dock Mayor Street Upper Dublin 1 |
The proposed development will consist of the installation of externally illuminated signage to the National College of Ireland campus building at Spencer Dock (previously granted planning permission under Reg. Ref. DSDZ5107/22). The development involves the installation of 2 no. externally illuminated signs to the corner of the south and west elevation of Building R at Level 5 and 1 no.... login required. |
Details... |
470m |
02/01/2024 |
APPLICATION DECLARED INVALID |
49-51 Third Avenue Seville Place Dublin 1 D01 X276 |
Conversion of a previously combined property into its original two dwellings, to create two separate dwellings No 49 Third Avenue, Seville Place, and No 51 T... login required. |
Details... |
340m |
20/12/2023 |
APPLICATION DECLARED INVALID |
Building R Spencer Dock Mayor Street Upper Dublin 1 |
The proposed development will consist of the installation of externally illuminated signage to the National College of Ireland campus building at Spencer Dock (previously granted planning permission under Reg. Ref. DSDZ5107/22). The development involves the installation of 2 no. externally illuminated signs to the corner of the south and west elevation of Building R at Level 5 and 1 no.... login required. |
Details... |
420m |
14/12/2023 |
ADDITIONAL INFORMATION |
No. 26 Pearse Square Dublin 2 D02 NP92 fronting onto Hanover Street |
PROTECTED STRUCTURE:For construction of three storey over partial basement, three bedroom mews house, with a rooflight, and associated boundary walls and site works .RPS. Ref. 6468... login required. |
Details... |
490m |
14/12/2023 |
ADDITIONAL INFORMATION |
10 Pearse Square Dublin 2 D02 YE09 |
PROTECTED STRUCTURE (Ref: 6454): the development will consist of construction of a three-storey, two bedroom mews house, roof terrace and associated boundary walls and site works to the rear of No. 10 Pearse Square, fronting onto Byrne's Lane, Dublin 2, D02 YE09.... login required. |
Details... |
270m |
08/12/2023 |
GRANT PERMISSION |
Unit 2 on the corner of Creighton Street and Windmill Lane Dublin 2 |
Planning permission for development at Unit 2 on the corner of Creighton Street and Windmill Lane, Dublin 2, which forms part of the wider development at the Windmill Quarter.
The development will consist of the replacement of an existing glazing panel at the western elevation at Creighton Street... login required. |
Details... |
280m |
30/11/2023 |
GRANT RETENTION PERMISSION |
The CHQ Building North Wall Quay Dublin 1 |
PROTECTED STRUCTURE (RPS. 2094) / RETENTION : there are no works proposed to the protected structure. The development consists of retention of the freestanding 'EPIC' 3D signage located adjacent to the western elevation of the CHQ Building, No... login required. |
Details... |
490m |
21/11/2023 |
APPLICATION DECLARED INVALID |
Rear of No. 10 Pearse Square fronting onto Byrne's Lane Dublin 2 D02 YE09 |
PROTECTED STRUCTURE:PERMISSION:For construction of a three-storey, two bedroom mews house, roof terrace, and associated boundary walls and site works to the rear of No. 10 Pearse Square, fronting onto Byrne's Lane, Dublin 2, D02 YE09 a protected structure RPS. Ref. 6454.... login required. |
Details... |
450m |
14/11/2023 |
GRANT PERMISSION |
Plaza 2 Custom House Plaza Harbourmaster Place I.F.S.C. Dublin 1 D01 V9V4. |
PERMISSION:The development will consist of: Change of use of office space to medical use containing consultant suites and various adult outpatient care services. The proposals comprise the change of use of all floors in Plaza 2 from office space to a medical use including modifications to the internal layout of the building ... login required. |
Details... |