1.2km |
23/10/2024 |
N/A |
Platin , Duleek , Co. Meath |
the development consists of retention permission for the revised location of the as constructed site entrance and access road from approved planning applications 22/1081 & 24/60126... login required. |
Details... |
2.3km |
05/10/2024 |
N/A |
Wintergrass , Bellewstown , Co Meath |
the Proposed development consists of the construction of a detached one storey house with a finished height of 4892mm and a habitable living space of 61 SQM. The proposed bungalow floor plan includes a Kitchen/Living space, entrance, storage, bathroom, and 2 bedrooms. There is a proposed 3 met... login required. |
Details... |
1.8km |
26/09/2024 |
N/A |
St Martin's , Drogheda Road , Duleek Co Meath |
a domestic garage and a shed for log storage to the rear of my house at St Martin's, Drogheda Road, Duleek, Co Meath. The work will include the removal of two existing sheds and the ancillary site development works. The existing entrance will be retained ... login required. |
Details... |
1.9km |
15/07/2024 |
CONDITIONAL |
Crufty , Beymore , Drogheda |
formation of a new vehicular entrance, to include recessed gate & fencing, and associated siteworks, to a field to replace the existing unauthorized entrance, which will be closed... login required. |
Details... |
1.7km |
08/07/2024 |
REFUSED |
Kilsharvan , Bellewstown , County Meath |
retention permission for change of use of former motorway works office to residential accommodation including conversion of attic to Living space and access laneway to structure and completion... login required. |
Details... |
2.1km |
14/06/2024 |
CONDITIONAL |
Newhaggard , Bellewstown Drogheda , County Meath |
dwelling house, waste water treatment system and percolation area and all associated site works... login required. |
Details... |
1.7km |
07/05/2024 |
N/A |
Kilsharvan , Bellewstown , County Meath |
change of use of former motorway works office to Living Accommodation including conversion of attic to living space ., new waste water treatment system and percolation area , decommission existing septic tank , new access gate and entrance lane and all associated site works... login required. |
Details... |
2.7km |
17/04/2024 |
CONDITIONAL |
77-83 Kestrel Manor , Platin Rd Drogheda , Co. Meath |
the development is for minor revisions to the Disability Bungalows as already granted planning permission under ref. 180611 and will consist of: 4no. new first floor dorm... login required. |
Details... |
3km |
11/03/2024 |
CONDITIONAL |
Newtown , Platin , Co. Meath A92 V9DH |
the development consists of a new side and rear extension, the relocation of the existing waste water treatment plant and percolation area and revised site boundary from previously granted planning permission reference no SA802920 including all associated site works... login required. |
Details... |
1.2km |
22/02/2024 |
CONDITIONAL |
Platin , Duleek , Co. Meath |
the development consists of the construction of agricultural grain storage sheds, including new concrete yard, surface water drainage and all associated site works and retention permission for an as constructed plant room.... login required. |
Details... |
1km |
13/10/2023 |
CONDITIONAL |
Annagor , Duleek , Co. Meath |
The development will consist of a facility for the recovery of waste concrete on a 1.8ha area at Annagor Quarry, as conducted previously at this site. ... login required. |
Details... |
1km |
10/10/2023 |
N/A |
Annagor , Duleek , Co. Meath |
Permission is sought for an inert waste recovery facility, previously permitted under Planning Register Reference Number SA140257, which has expired. The development will consist of an inert construction and demolition waste recovery facility which provides for the importation, storage, processing, and recovery of waste concrete arising from concrete plants operated by Kilsaran Concrete Unlimited Company and external construction and demolition projects within the Greate... login required. |
Details... |
1.7km |
27/09/2023 |
CONDITIONAL |
Horse yard buildings , Kilsharvan Bellewstown , Drogheda Co. Meath A92 HYE8 |
.The development will consist of extension and alteration to the existing farm building and the provision of a dwelling house within it, a new wastewater treatment plant, and associated site works - (all within a curtilage of protected structure ref. No 91007)... login required. |
Details... |
1.8km |
22/09/2023 |
CONDITIONAL |
Horse yard buildings Kilsharvan , Bellewstown Drogheda , Co. Meath |
The development will consist of provision of 14 No. residential units, including alterations and extensions to existing horse yard buildings (A, B & C) and conversion thereof into residential units, construction of a new residential building (D), and a new stable building with overnight staff accommodation, new wastewate... login required. |
Details... |
1.5km |
30/08/2023 |
CONDITIONAL |
Carranstown , Duleek , Co. Meath |
A new natural grass football pitch with all associated site works, including the erection of 4 No. flood-lights, 15m in height, a 20m long open spectator stand and a warm up side pitch.... login required. |
Details... |
2.4km |
28/08/2023 |
CONDITIONAL |
The Gate Lodge , Platin Hall , Co. Meath |
The development shall consist of 1) Restoration and upgrading works to the existing gate lodge 2) A rear single-storey extension. 3) Formation of a new site entrance to service the existing gate lodge, and all associated site development works.... login required. |
Details... |
900m |
11/08/2023 |
CONDITIONAL |
Carranstown , Caulstown , Platin Duleek County Meath |
the proposed development will comprise a 170MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant. The proposed development will comprise an electricity generating plant which will use Hydrotreated Vegetable Oil (HVO) as fuel and will be connected to a previously consented 110kV substation (ABP-303678-19) and associated site works and improved access from the R152. The development comprises the following elements:
a) Three gas turbine buildings (each 990m2) each housing 1 no. turbine, 1 no. generator and auxiliary equipment with a total of 269 MWth (thermal output) generating capacity all on concrete plinths. b) The power plant will have three exhaust stacks (25m in height), one exhaust stack per OCGT. Therefore, each OCGT will comprise a standalone Large Combustion Plant. The power plant may need to utilise, selective catalytic reduction (SCR) (18m high, 4.5 width, 14m length) for nitrogen oxides abatement.
c) Water treatment plant comprising: • a 275m2 Deionising Building (6m high x 11m wide x 25m long) • a raw water treatment tank of 2,262m3 ( 12.8m high) • a deionised water tank (max. volume of 3,925m3). 15.4m high • a processed water tank of 450m3 (9m high)
• 1 no. 20m2 firefighting water tank of 45m3 (2m hi... login required. |
Details... |
1.6km |
04/08/2023 |
CONDITIONAL |
Crufty , Beamore , Co. Meath A92 X6R0 |
planning permission for a replacement dwelling, proprietary effluent treatment system with percolation area and all ancillary site works. The existing dwelling house on the site is to be demolished ... login required. |
Details... |
1.6km |
20/07/2023 |
N/A |
Crufty , Beamore , Co. Meath A92 X6R0 |
planning permission for a replacement dwelling, proprietary effluent treatment system with percolation area and all ancillary site works. The existing dwelling house on the site is to be demolished ... login required. |
Details... |