2.3km |
29/10/2024 |
N/A |
Lands north of Meakstown Cottages access road, Dubber, Co. Dublin |
The proposed development... login required. |
Details... |
2.6km |
09/10/2024 |
N/A |
Unit 1 Vantage,, Business Park,, North Road,Coldwinters,, Co. Dublin |
The proposed development consists of permission relate to Unit 1 only;... login required. |
Details... |
2.6km |
02/10/2024 |
Invalid Application |
Unit 1 Vantage,, Business Park,North Road,, Coldwinters Dublin 11, Co. |
The proposed development consists of permission relate to Unit 1 only;... login required. |
Details... |
2.9km |
02/10/2024 |
N/A |
Huntstown Power Station, In the townlands of Hunstown and J, Co.Dublin |
1) A Battery Energy Storage System facility to include up to 85 no. co... login required. |
Details... |
390m |
27/09/2024 |
N/A |
2, Wellmount Crescent, Dublin 11 |
Demolition of existing garage to Side, with construction of a new Detached, 2 Storey, 4 Bed Dwelling House, site works include new
vehicular access for existing & new dwelling, with associated site works.... login required. |
Details... |
130m |
27/09/2024 |
N/A |
43, Mellowes Road, Dublin 11 |
Permission construction of a single storey flat roof kitchen/dining room extension to the rear of the house, conversion of attic space including construction of a dormer type roof window to the rear and 3No. 'Velux' type ... login required. |
Details... |
2.7km |
08/08/2024 |
GRANT PERMISSION FOR RETENTION |
Unit 2, Vantage Business Park, North Road, Coldwinters, Dublin 11, D11 |
Retention Permission for: Construction of a single storey storage shed... login required. |
Details... |
100m |
31/07/2024 |
GRANT PERMISSION |
31, Mellowes Road, Dublin 11 |
Planning Permission is sought for a new vehicular entrance with ancillary site works.... login required. |
Details... |
210m |
18/07/2024 |
ADDITIONAL INFORMATION |
Site located to the west of Cardiffsbridge Road, Finglas, Dublin 11 |
Permission for development at a site located to the west of Cardiffsbridge Road, Finglas, Dublin 11. The overall site includes lands at Colaiste Ide Sports and Leisure, City of Dublin Education and Training Boards, Coláiste Eoin, and lands known as 'Fergal's Field'. The development will consist of: Part demolition of existing ESB substation/boiler house building on site; . The removal of the existing sports pitches and demolition of the enclosures to the same. The construction of a 4 no. storey (plus roof plant level and associated access stair) Primary Care Centre with a total Gross Internal Floor Area of c. 10,517 sqm and associated landscaped courtyards and terraces; Provision of HSE and Tusla signage to the Primary Care Centre; The provision of 3 no. astro pitches (c. 1,970 sqm), accompanying fenced enclosures, public seating and landscaping. Provision of a GAA Pitch (c. 4,500 sqm) and walking track (c. 1,610 sqm) and accompanying flood lights and pedestrian pathway; Relocation of vehicle entrance from Cardiffsbridge Road and provision of a n... login required. |
Details... |
2.7km |
04/07/2024 |
Invalid Application |
Unit 2, Vantage Business Park, North Road, Coldwinters, Dublin 11, D11 |
Retention Permission for: Construction of a single storey storage shed... login required. |
Details... |
350m |
02/07/2024 |
REFUSE PERMISSION |
1, Patrickswell Court, Dublin 11 |
Permission for a for a development on this site: PATRICKSWELL COURT 1 FINGLAS, DUBLIN 1 1, D11DT04. The development will consist of: New 2 storey detached 3 bedrooms house. New boundary walls New vehicular access Off street car parking . Associated site works.
... login required. |
Details... |
470m |
10/06/2024 |
N/A |
9 Church Street, Finglas, Dublin 11 |
PROTECTED STRUCTURE: the development will consist of the demolition of 3 no. existing dwellings on site, the construction of a new two-storey 10-bed mental health unit with ancillary accommodation, new vehicular and pedestrian site access, 2 no. car parking spaces, provision ... login required. |
Details... |
340m |
24/05/2024 |
APPLICATION DECLARED INVALID |
1, Patrickswell Court, Finglas West, Dublin 11, D11 DT04 |
The development will consist of :
1. new 2 storey detached 3 bedrooms house,
2. new boundary walls,
3. new vehicular access,
4. off street car parking,
5. associated site works.... login required. |
Details... |
470m |
29/04/2024 |
APPLICATION DECLARED INVALID |
No. 9 Church Street, Finglas, Dublin 11 |
PROTECTED STRUCTURE:Permission for the demolition of 3 no. existing dwellings on site and the construction of a new two-storey mental health unit with ancillary accommodation at No.9 Church Street, Finglas, Dublin 11.
The development will consist of the demolition of the 3 no. existing dwellings on site, the construction of a new two-storey 10- bed mental health unit with anc... login required. |
Details... |
470m |
22/04/2024 |
APPLICATION DECLARED INVALID |
9 Church Street, Finglas, Dublin11 |
PROTECTED STRUCTURE: permission for the demolition of 3 no. existing dwellings on site and the construction of a new two-storey mental health unit with ancillary accommodation at no. 9 Church Street, Finglas, Dublin 11. The development will consist of the demolition of the 3 no. existing dwellings on site, the construction of a new two-storey 10 bed mental health unit with anc... login required. |
Details... |
500m |
18/04/2024 |
GRANT PERMISSION |
7, Wellmount Road, Finglas West, Dublin 11, D11 YCR9 |
Ground floor extension to front/side to create family ancillary accommodation, with internal modifications, new 1st floor extension to side, Attic Conversion with Dormer Window to Rear with associated site works... login required. |
Details... |
2.6km |
01/03/2024 |
GRANT PERMISSION |
Lands at Huntstown BioEnergy Plant, Huntstown, Dublin 11, D11 N28R |
The development will consist of upgrade works abd alterations to an ex... login required. |
Details... |
180m |
29/01/2024 |
GRANT PERMISSION AND RETENTION PERMISSION |
3, Cardiff Castle Road, Dublin 11 |
PERMISSION AND RETENTION: Attic conversion for storage with dormer window to the rear and dormer window to the front. Two Velux windows to the front roof area. Rear shed for retention. New gable side window. Rear single-story extension. Front single storey extension with roof window.... login required. |
Details... |
2.9km |
02/01/2024 |
GRANT PERMISSION |
Coldwinters, North Road, North of Finglas, Co. Dublin |
The development will consist of the construction of a... login required. |
Details... |
2.2km |
18/12/2023 |
GRANT PERMISSION |
Lands at Huntstown Townland and Coldwinters Townland, County Dublin |
We Rathdrinagh Land Unlimited Company (Trading as Irish Recycling LTD)... login required. |
Details... |