460m |
09/10/2024 |
GRANT PERMISSION |
Galco House, Ballymount Road, Walkinstown, Dublin 12 |
Design alterations to development permitted under ref. SD21A/0347 (extension to paint workshop) involving removal of existing 436sq.m store unit and enlargement of the permitted 980sq.m extension to 1,661.1sq.m (an increase of 681.1sq.m, bringing the tot... login required. |
Details... |
460m |
28/08/2024 |
GRANT PERMISSION |
16, St RIta's, Corrig Close, Greenpark, Walkinstown, Dublin 12, D12 P6F9 |
Full Planning Permission for a proposed new dwelling to side of existing dwelling , as well as demolition, alterations and extensions to the existing dwelling. The works will include the following: 1. The subdivision of the site to provide for a new adjoining 139.64m2 two storey dwelling, including revised car parking, access and connection to all services. 2. The demolition and remo... login required. |
Details... |
320m |
12/08/2024 |
REQUEST ADDITIONAL INFORMATION |
Former Exertis Ireland Ltd Premises, M50 Business Park, Ballymount Road Upper, Ballymount, Dublin 12 |
The reconfiguration of 47No existing staff car parking spaces to allow for safer movement of vehicles and temporary storage of materials elsewhere in the existing yard, including new ... login required. |
Details... |
2.9km |
30/05/2024 |
DECLARED NOT EXEMPT |
Newlands Golf Club, Belgard Road, Dublin 22, D22 R867 |
Kazuba Toilet - stand alone self contained unit - no power or running water.... login required. |
Details... |
490m |
09/05/2024 |
REQUEST ADDITIONAL INFORMATION |
Block B, Adjacent Lands South of Units G & F, Ballymount Drive, Ballymount Industrial Estate, Dublin 12 |
Construction of 6 warehouse units with associated offices, associated signage for each unit, boundary treatment, associated drainage and ancillary siteworks.... login required. |
Details... |
440m |
13/03/2024 |
REFUSE PERMISSION |
Applegreen Ballymount, M50 Business Park, Kilnamanagh, Dublin |
The development will consist of change of use from Retail use to retail use with ancillary off licence use... login required. |
Details... |
410m |
16/01/2024 |
GRANT PERMISSION & GRANT RETENTION |
Johnson Brothers Building, Ballymount Avenue, Dublin 12, D12 VFED |
Retention of the existing covered loading bay to the north of the building, and permission for the widening of an existing vehicular entrance located to the south west of the site together with associated ancillary site works.... login required. |
Details... |
460m |
18/12/2023 |
GRANT PERMISSION |
Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12 |
Construction of 3 no. enterprise / light industrial / wholesale outlet units (Units A, B and C), including ancillary office / administration areas over two levels, with a total GFA of 1,576 sq.m. The proposal includes 25 no. car parking spaces (which includes 2 no. van parking spaces), 20 no. cycle spaces, a Unit Substation, signage zones for the units delivery / loading areas, landscaping, boundary treatments, lighting, PV panels, foul and surface water drainage and all associ... login required. |
Details... |
330m |
21/11/2023 |
REFUSE PERMISSION FOR RETENTION |
Unit 4, Crossbeg industrial Estate, Ballymount Road Upper, Dublin 24 |
Retention permission is sought for an existing free standing advertisement sign located within the subject grounds fronting onto the junction of Upper Ballymount Road and Calmount Road Dublin 24.... login required. |
Details... |
410m |
25/10/2023 |
INVALIDATE APPLICATION |
Johnson Brothers Building, Ballymount Avenue, Dublin 12 D12 VFE0 |
Retention of the existing covered loading bay to the north of the building, and permission for the widening of an existing vehicular entrance located to the south west of the site together with associated ancillary site works.... login required. |
Details... |
2.8km |
24/08/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal l... login required. |
Details... |
320m |
07/07/2023 |
GRANT PERMISSION |
Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12 |
The change of use from warehouse to data repository facility, alterations to external facades, provision of a new 1100mm parapet, reclad roof, internal alterations, refurbishment of the existing office space, solar panels at roof level, external plant at ground and roof levels and equipment to include 12 condenser modules, an emergency back-up generator and associated fuel storage tank, transformer, extension to the existing s... login required. |
Details... |
2.8km |
27/06/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showe... login required. |
Details... |
210m |
25/05/2023 |
GRANT PERMISSION FOR RETENTION |
M50 Business Park, Unit 1, Ballymount Ave, Ballymount, Dublin 12, D12 HP11 |
Retention of partial change of use from warehouse to office space to include Retention of additional first floor, second floor offices and meeting rooms also to include all associated site works to facilitate the development.... login required. |
Details... |
410m |
06/04/2023 |
DECLARED WITHDRAWN |
Lands at Greenhills Industrial Estate, Greenhills Road, Dublin 12 |
Change of use from yard which is ancillary to an industrial storage building to recycling facility; provision of a recycling facility for the recycling of non-hazardous household and commercial waste; The development provides for the erection of a single storey payment booth, internal one-way road providing access to the site fro... login required. |
Details... |
500m |
08/03/2023 |
GRANT PERMISSION |
M50 Business Park, Ballymount Industrial Estate, Dublin 12 |
Two storey extension to rear of existing building to accommodate additional vehicle service bays on the ground floor and additional office space and ancillary accommodation on the first floor.... login required. |
Details... |
2.8km |
28/02/2023 |
DECLARED EXEMPT |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
The erection of a replacement glasshouse superstructure onto an existing masonry base. Formation of pad footings for the glasshouse support frame. Associated electrical, plumbing & rainwater drainage works associated with the glasshouse.... login required. |
Details... |
290m |
24/11/2022 |
GRANT PERMISSION |
Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12 |
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum... login required. |
Details... |
320m |
09/08/2022 |
REQUEST ADDITIONAL INFORMATION |
Unit 1, M50 Business Park, Ballymount Avenue, Dublin 12 |
Whether the use of the building as a data repository facility with associated internal alterations is, or is not exempted development... login required. |
Details... |