370m |
11/11/2024 |
N/A |
Former Gallaher's Cigarette Factory site, at the junction of Airton Road and Greenhills Road, Tallaght, Dublin 24 |
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residenti... login required. |
Details... |
2.4km |
08/11/2024 |
N/A |
Roadstone Limited, Cookstown Road, Dublin 24, D24 PKK2 |
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The dev... login required. |
Details... |
360m |
06/11/2024 |
GRANT PERMISSION |
30, Bancroft Ave, Tallaght, Dublin 24, D24 XWE0 |
The change of use and conversion of existing attic space to storage space with dormer window to the rear, hipped roof to new gable wall, with ground floor single storey extension to the rear, and conver... login required. |
Details... |
2.9km |
24/10/2024 |
N/A |
Tallaght Town AFC, Carolan Park, Ballmana Lane, Kiltipper, Tallaght, Dublin 24 |
New all-weather pitch complete with perimeter fencing and all associated site works.... login required. |
Details... |
490m |
23/10/2024 |
N/A |
5, Bancroft Ave, Tallaght, Dublin 24, D24E6HE |
for the construction of single storey extension to the front of existing dwelling which will include new bay window, new pitched roof, and front elevation alterations/chang... login required. |
Details... |
350m |
17/10/2024 |
N/A |
AIB, OLD BAWN ROAD, TALLAGHT, Dublin, D24 X006 |
a) Alterations to existing south elevation including removal of window, widening of existing window opening, installation of new entrance door and glazed screen; b) Reconfiguration of existing ramp and steps; c) Relocation of existing ATM and canopy from south ele... login required. |
Details... |
2.5km |
24/09/2024 |
N/A |
Townlands of Bohernabreena, Oldcourt & Kilininny, Dublin 24. |
Capami Ltd. wishes to apply for a seven year planning permission for a Large Scale Residential Development (LRD) on a site measuring c.20.4Ha, located in the townlands of Bohernabreena, Oldcourt, and Killininny, Dublin 24. The development site is located to the east of
Bohernabreena Road, north and east of Bohernabreena cemetery, south and south-east of St. Anne's GAA club, south and south-west of the Dodderbrook residential estate, west of the Ballycullen Gate residential development (currently under construction) and west of Oldcourt Road (R113). The proposed development consists of 523 no. residential units comprised of 255 no. 2, 3 & 4 bed, 2 & 3 storey, detached, semi-detached and terraced houses, 206 no. 1, 2 & 3 bed duplex units in 20 no. 2 & 3 storey blocks, and 62 no. 1, 2 & 3 bed apartments in 7 no. 2-3 & 3-4 storey blocks (i.e. Blocks A, B2 & D, and 2 no. Blocks B1 & 2 no. Blocks C), along with a 2 storey childcare facility of c. 457sq.m. Private amenity space for the residential units is provided in the form of rear gardens for houses and ground floor terraces / upper floor balconies for apartments and duplex units. The proposed development provides for a total of c. 7.3Ha of public open space, and c. 5,505sq.m of communal open space associated with proposed residential units. Vehicular access to the development will be via 4 no. access points, as follows: (i) from the west of the site, via 2 no. accesses, l... login required. |
Details... |
310m |
22/07/2024 |
GRANT PERMISSION |
TU Dublin, Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24 |
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.... login required. |
Details... |
2.5km |
05/06/2024 |
GRANT PERMISSION |
20, Dodderbrook Park, Dublin24, D24R81W |
The development will consist of the conversion of existing attic space to a new dormer bedroom with ensuite bathroom and storage. The work includes a 3-meter-wide box dormer to the front elevation and Velux windows to rear of the existing roof, together with all associated site works and services... login required. |
Details... |
2.9km |
03/05/2024 |
GRANT PERMISSION |
37, Ballycullen Green, Dublin 24, D24 KDY6 |
Attic conversion with 1 bedroom and an en-suite bathroom with dormer window to the front roof area.... login required. |
Details... |
310m |
26/04/2024 |
GRANT PERMISSION |
TU Dublin, Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24 |
Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.... login required. |
Details... |
2.5km |
17/04/2024 |
DECLARED EXEMPT |
7 Elder Heath Green, Kiltipper, Dublin, D24 X5DP |
Garden Room/Home Office... login required. |
Details... |
2.9km |
10/04/2024 |
GRANT PERMISSION |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.... login required. |
Details... |
2.7km |
27/03/2024 |
GRANT PERMISSION & GRANT RETENTION |
3, Elder Heath Hill, Killinardan, Dublin 24 |
Retention for 3 no. roof lights (2 facing east a 1 facing south). A detached garden room of 16sq.m floor area. Permission for a rear, ground floor extension of 22sq.m floor area with a stove flue. A gable window facing south at attic level.... login required. |
Details... |
300m |
27/03/2024 |
WITHDRAW THE APPLICATION |
TU Dublin, Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24 |
Development on a site of c. 0.017 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground firefighting storage tank.... login required. |
Details... |
2.9km |
22/02/2024 |
GRANT PERMISSION |
14, Ballycullen Green, Oldcourt Road, Ballycullen, Dublin 24 |
The Conversion of existing attic in to a bedroom & ensuite bathroom which incorporates a new dormer window to the roof on the front elevation... login required. |
Details... |
2.9km |
22/02/2024 |
GRANT PERMISSION |
27, Ballycullen Green, Dublin 24, D24 WRW8 |
The conversion of existing attic into a storage space which incorporates a new dormer window to the roof on the front Elevation... login required. |
Details... |
260m |
19/02/2024 |
GRANT PERMISSION |
Molloy's Bar & Grill, The Foxes Covert, Main Street, Tallaght, Dublin 24, D24 R5X0 |
Erection of a pergola structure with retractable roofing system including sliding glazed screens and doors to west perimeter over proposed new external di... login required. |
Details... |
310m |
01/02/2024 |
DECLARED NOT EXEMPT |
Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24 |
90m3 underground fire fighting tank... login required. |
Details... |