450m |
19/04/2024 |
N/A |
26, Cois na hAbhann, Old Bawn, Tallaght, Dublin 24 |
Construction of 2 new semi-detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden.... login required. |
Details... |
1.1km |
17/04/2024 |
N/A |
7 Elder Heath Green, Kiltipper, Dublin, D24 X5DP |
Garden Room/Home Office... login required. |
Details... |
2.3km |
10/04/2024 |
N/A |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (218sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.... login required. |
Details... |
2.8km |
28/03/2024 |
N/A |
Ballymaice House, Ballymaice, Bohernabreena, D24 TV70 |
A single-storey side extension (62.2sqm) to the main bungalow. Also reconfiguring the current internal layout of the bungalow adding one extra bedroom with a total of three. It consists of relocating the bungalow's main entrance door to the front (west) elevation, changing the original entrance to fenestration and adding new exterior finishes includin... login required. |
Details... |
1.2km |
27/03/2024 |
N/A |
3, Elder Heath Hill, Killinardan, Dublin 24 |
Retention for 3 no. roof lights (2 facing east a 1 facing south). A detached garden room of 16sq.m floor area. Permission for a rear, ground floor extension of 22sq.m floor area with a stove flue. A gable window facing south at attic level.... login required. |
Details... |
210m |
05/03/2024 |
GRANT PERMISSION |
Blenders, Whitestown Road, Tallaght, Dublin, D24 VY75 |
Construction of a finished goods warehouse (including freezer room) at the south side of the existing Blenders manufacturing facility. The proposed extension will have a gross floor area of 3,900 sq.m and a maximum height of 20.5m. Also, ancillary works including: PV panels to new proposed warehouse roofs, 3 no. additional loading dock levellers, Relocation of existing carparking (no change in numbers) including provision of 4 no. EV charging spaces and 2 no. ac... login required. |
Details... |
1.6km |
02/01/2024 |
REFUSE PERMISSION |
Thomas Davis GAA Club, Kiltipper Road, Tallaght, Co. Dublin |
Install a 21 metre monopole carrying telecommunications and broadband equipment, together with associated equipment and cabinets enclosed within a 2.4 metre palisade fence compound at Thomas Davis GAA Club, Kiltipper Road, Tallaght, Dublin.... login required. |
Details... |
2.9km |
15/12/2023 |
GRANT PERMISSION |
South/South-West of Oldcourt Road, Oldcourt, Dublin 24 |
Residential development on a site measuring c. 2.56 hectares within the lands designated for the Ballycullen-Oldcourt Local Area Plan 2014 (as extended) consisting of 71 dwellings comprised of 41 three & four bed, two and three storey, detached, semi-detached and terraced houses and 30 two, three & four bed apartments & duplex units accommodated in 1 two/three storey block and 2 three storey blocks; Access to the proposed development will be from Oldc... login required. |
Details... |
2.9km |
31/10/2023 |
GRANT PERMISSION & GRANT RETENTION |
10, The View, Ballycullen Gate, Firhouse, Dublin 24 |
Retention permission & permission for development on a site of c. 0.044 hectares (c. 444 sq.m) which has the approved name of No. 10 The View, Ballycullen Gate, Firhouse, Dublin 24 (i.e., the proposed development is located within the permitted Ballycullen Gate development granted permission under Ref.'s SD17A/0468 and SD22A/0356, which is located south of Oldcourt Road, Firhouse, Dublin 24, and is currently under construction). The proposed development seeks retention... login required. |
Details... |
2.2km |
18/10/2023 |
GRANT PERMISSION |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement ... login required. |
Details... |
490m |
10/10/2023 |
GRANT PERMISSION FOR RETENTION |
89, Cill Cais, Old Bawn, Dublin 24 |
Retention of existing garage conversion with raised pitched roof extended to rear over utility room and at front over hall door.... login required. |
Details... |
270m |
19/09/2023 |
GRANT PERMISSION |
Parcel of land on the western side of Whitestown Way, adjacent South City Business Park, within the Townlands of Tallaght, centered at approx., Irish Traverse Mercator |
Development of a welfare facility to accommodate a future bus layover which was approved as part of the D24 Neighbourhood Cycle Network Scheme. The proposed development consists of a bus dri... login required. |
Details... |
2.6km |
06/09/2023 |
GRANT PERMISSION |
The Waterworks, Bohernabreana, Co Dublin, D24V128 |
The proposed development will consist of the modification to the existing bungalow into two-storey dormer bungalow. Removal of part of the front (west) and rear (east) roof areas. The construction of front and rear dormer windows. Modif... login required. |
Details... |
2.4km |
28/08/2023 |
REFUSE PERMISSION & REFUSE RETENTION |
Ballymana Lane, Kiltipper, Dublin 24 |
Permission is sought to retain a single storey family farm house located on the applicant's farm holding, along with all associated site development works; the development will be accessed via an existing... login required. |
Details... |
2.7km |
24/08/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal l... login required. |
Details... |
2.5km |
24/08/2023 |
GRANT PERMISSION |
2, Dodderbrook Place, Oldcourt, Dublin 24 |
Conversion of existing attic into a bedroom & ensuite which incorporates a new Velux Quattro Window to the roof on the front elevation.... login required. |
Details... |
1.7km |
24/08/2023 |
REFUSE PERMISSION |
Tallaght Town AFC, Carolan Park, Ballmena Lane, Kiltipper, Tallaght, Dublin 24 |
Construction of a new all-weather pitch complete with perimeter fencing and floodlights and all associated site works.... login required. |
Details... |
1.9km |
14/08/2023 |
GRANT PERMISSION |
Katonah, Ballymana Lane, Dublin 24 |
Single storey extension to the rear of home... login required. |
Details... |
2.8km |
21/07/2023 |
INVALID - SITE NOTICE |
Ballymaice House, Ballymaice, Bohernabreena, D24 TV70 |
A single-storey side extension (62.2sqm) to the main bungalow. Also reconfiguring the current layout of the bungalow adding one extra bedroom with a total of three. It consists of relocating the bungalow's main entrance door to the front (west) elevation, changing the original entrance to fenestration and adding new exterior finishes including st... login required. |
Details... |