3km |
06/11/2024 |
N/A |
Keepers Lock, Clonburris, Dublin 22 |
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to e... login required. |
Details... |
2.8km |
14/03/2024 |
GRANT PERMISSION FOR RETENTION |
Keepers Lock, Clonburris, Clonburris SDZ, Co. Dublin |
Kelland Homes Ltd seeks permission for retention development, consisting of the replacement of permitted railing located to the rear of 8 no. duplex blocks under grant of permiss... login required. |
Details... |
160m |
12/02/2024 |
GRANT RETENTION PERMISSION |
Unit 55, Park West Road, Park West Industrial Park, Dublin 12, D12 X9F9 |
RETENTION: Retention of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, Creation of 2no. openings to the south elevation and associated site development works.... login required. |
Details... |
160m |
30/01/2024 |
APPLICATION DECLARED INVALID |
55 Park West Industrial Park, Dublin 12, D12 X9F9 |
RETENTION: retention of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, Creation of 2no. openings to the south elevation and associated site development works.... login required. |
Details... |
2.7km |
15/12/2023 |
GRANT PERMISSION |
The Fonthill Road (R113) roundabout, adjacent to the Ninth Lock Road, all within the townland of Cappagh, Dublin 22. |
Temporary permission for the erection of 2 no. temporary advertising / information signs and 12 no. flags, on 2 no sites, both measuring 67 sq.m, located at (i) Fonthill Road (R113) roundabout, to the west of permitted development granted under Ref. SDZ22A/0010, and (ii) adjacent to the Ninth Lock Road, to the south-east of permitted development granted under Ref. SDZ22A/0010, all within the townland of Cappagh, Dublin 22. The proposed development is comprised of 2 no. advertising / information signs measuring approximately 6.0 m x 4.5 m, on metal structures of 2.4 m. in heigh... login required. |
Details... |
440m |
05/07/2023 |
GRANT PERMISSION FOR RETENTION |
Site at Bluebell Avenue, Bluebell Industrial Estate, Dublin 12 |
Retention of alterations to previously approved plans to increase the warehouse area by 89sq.m to the side of the approved building and alterations to approved elevations.... login required. |
Details... |
2.8km |
03/04/2023 |
GRANT PERMISSION |
The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway, line, north of Cappaghmore housing estate and whitton Avenue, and east of an existing carpark/park, & ride facility at the Clondalkin, Fonthill train statio |
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed developm... login required. |
Details... |
440m |
11/11/2022 |
INVALID - SITE NOTICE |
Site at Bluebell Avenue, Bluebell Industrial Estate, Dublin 12 |
Retention of alterations to previously approved plans to increase the warehouse area by 89sq.m to the side of the approved building and alterations to approved elevations.... login required. |
Details... |
440m |
21/06/2022 |
GRANT PERMISSION |
Site at Bluebell Avenue, Bluebell Industrial Estate, Dublin 12 |
Development comprising 189sq.m of warehouse space and 89sq.m of ancillary office space.... login required. |
Details... |
160m |
03/12/2021 |
GRANT PERMISSION AND RETENTION PERMISSION |
Unit 55, Park West Road, Park West Industrial Park, Dublin 12, D12 X9F9 |
PERMISSION & RETENTION: The development will consist of extension of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, construction of a new mezzanine level in the warehouse area (circa 257 sqm) and a ... login required. |
Details... |
160m |
25/11/2021 |
APPLICATION DECLARED INVALID |
Unit 55, Park West Road, Park West Industrial Park, Dublin 12, D12X9F9 |
PERMISSION & RETENTION: The development will consist of extension of the existing office space at second floor level resulting in an overall office floor space increase of 125 sqm approximately, construction of a new mezzanine level in the warehouse area (circa 257 sqm) and a ... login required. |
Details... |
150m |
22/11/2021 |
GRANT PERMISSION AND RETENTION PERMISSION |
Unit S3A & Unit 2 of S3B, Henry Road & Friel Avenue, Parkwest Business Park, Dublin 12 |
PERMISSION & RETENTION:
Permission for development at this site at Unit S3A & Unit 2 of S3B, Henry Road & Friel Avenue, Parkwest Business Park, Dublin 12.
The development for permission will consist of: construction of an ESB substation adjacent to the northern elevation (facing Freil Avenue) of Unit S3A and Unit 2 of S3B of 7.58m in length, 4.35 m in width and 2.975 m in height;
The development for retention permission consists of:
• Retention of certain aspects previously granted under permission reference 3140/20 but developed in an alternate manne... login required. |
Details... |
280m |
13/05/2021 |
APPLICATION DECLARED INVALID |
139 Cloverhill Road, Ballyfermot, Dublin 10 |
Planning permission for single storey extension to side and associated site works.... login required. |
Details... |
280m |
06/05/2021 |
APPLICATION DECLARED INVALID |
139, Cloverhill Road, Ballyfermot, Dublin 10, D10 W218 |
Single storey extension at side and associated site works.... login required. |
Details... |
480m |
03/03/2021 |
GRANT PERMISSION |
86A Croftwood Green, Cherry Orchard, Dublin 10 |
The development will consist of: (i) Converting the attic space to a home office/study with dormer window to the rear; (ii) A new roof window to the front of the house and (iii) New stair access from the upper floor landing and all associated internal and drainage works.... login required. |
Details... |