390m |
01/11/2024 |
N/A |
Scoil Aonghusa SNS and JNS Buildings at, Scoil Aonghusa Campus, Balrothery, Dublin 24, D24 YN34 |
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new app... login required. |
Details... |
360m |
28/09/2024 |
N/A |
Tymon Lane, Tymon Park, Tallaght, Dublin 24 |
A proposed Sports Changing Rooms Pavilion at Tymon Park South, in the townland of Tymon North. In accordance with the
requirements of the above, notice is hereby given that South Dublin County Council proposes:
• One single storey pavilion building consisting of two individual team changing
rooms each with one WC area, one club storage area, and one plant room, all with individual access.
• 2 No. Storage facility for equipment with a Plant room.
• Ancillary landscaping works adjacent to the pavilion building.
• All associated ancillary works in adjacent areas including but not li... login required. |
Details... |
400m |
02/08/2024 |
GRANT PERMISSION FOR RETENTION |
Unit 13, Greenhills Business Centre, Hibernian Industrial Estate, Greenhills Road, Dublin 24, D24N673 |
The development consists of the retention of existing 60 sq. m. of additional first floor offices within Unit 13.... login required. |
Details... |
3km |
05/06/2024 |
GRANT PERMISSION |
20, Dodderbrook Park, Dublin24, D24R81W |
The development will consist of the conversion of existing attic space to a new dormer bedroom with ensuite bathroom and storage. The work includes a 3-meter-wide box dormer to the front elevation and Velux windows to rear of the existing roof, together with all associated site works and services... login required. |
Details... |
150m |
19/05/2023 |
GRANT PERMISSION |
2, Tymon North Green, Tallaght, Dublin 24 |
Construction of single storey front extension to increase living and hallway space and associated works.... login required. |
Details... |
2.9km |
28/02/2023 |
DECLARED EXEMPT |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
The erection of a replacement glasshouse superstructure onto an existing masonry base. Formation of pad footings for the glasshouse support frame. Associated electrical, plumbing & rainwater drainage works associated with the glasshouse.... login required. |
Details... |
470m |
27/09/2022 |
GRANT PERMISSION |
192, Castle Park, Dublin 24 |
Single storey extension with tiled roof to the front & first floor extension with a tiled roof over existing rear extension to the existing two storey end of terra... login required. |
Details... |
450m |
20/06/2022 |
DECLARED EXEMPT |
Former Shinko Microelectronics Site, Greenhills Business Park, Greenhills Road, Tallaght, Dublin 24. |
The development will comprise: (1) The Installation of 2 no. new Air Handling Units & associated ducts externally to the existing south façade in place of the previously permitted ( Planning Permission SD13A/0266) generator units. (2) External alterations to exist... login required. |
Details... |
420m |
26/04/2022 |
GRANT PERMISSION FOR RETENTION |
13, Castle Lawns, Tallaght, Dublin 24, D24 X5WT |
Ground floor, single storey extension with canopy/apex roof over to front of house.... login required. |
Details... |
390m |
05/04/2022 |
GRANT PERMISSION |
Scoil Aonghusa Senior National School, Balrothery, Dublin 24 |
Provision of 1 approx. 100sq.m single storey temporary prefab (prefab 01 comprising 1 classroom & 3 resource rooms) adjacent to the south-east boundary of the site a... login required. |
Details... |
280m |
04/02/2022 |
GRANT PERMISSION |
Unit 1, Greenhills Business Park, Dublin 24. |
Part change of use from offices and warehouse to ancillary trade counter and showroom, offices and warehouse; reduction in area of first floor; new signage to front; relocating fire exit door to side; ancillary works.... login required. |
Details... |
240m |
09/11/2021 |
PART 8 APPROVED BY COUNCIL |
Castletymon Shopping Centre, Tallaght, Dublin 24 |
Upgrading and modernisation of Castletymon Shopping Centre and its environs. This will involve improvements within and around the shopping centre and along the roadway from the new Library / Bancroft Park and Tymon Park / National Basketball Arena. South Dublin County Council, In conjunction with the National Transport Authority, is actively trying to develop an improved cycle network throughout the county. This new network is intended to provide more sustainable transport options for commuters as well as active travel benefits for local communities. The proposed route no. 27 of the Cycle South Dublin is the Castletymon Road Cycle Scheme. It will provide cycle connectivity from Greenhills's Road to Tallaght Main Street and has a length of 1.8m. Under this scheme South Dublin County Council proposed to construct 250m length of cycleway as a first stage of this network. This provides a better active travel link to Castletymon shopping centre, local amenities, NBA arena, schools, and parks within the length of the road. Scheme objectives: The Castletymon Shopping Centre District Centre Enhancement Programme has a number of objectives; To modernise and support local businesses; To enhance pedestrian and cycle facilities to and within the centre; To create links to and between the shopping centre, Bancroft Park and Tymon Park; To create more amenity space within the centre; To widen pedestrian areas in front of the shops footpaths; To combat anti-social behaviour; To modernise the look and support local businesses; To create a vibrant and distinctive place. Works include: Working with traders regarding the scheme and shopfront upgrades; Narrowing the carriageway; Provision of new cycle way; Creation of a landscaped plaza with street furniture; Rationalisation of ... login required. |
Details... |
380m |
28/05/2021 |
GRANT PERMISSION |
80, Tymonville Road, Dublin 24 |
Ground floor extension to the side and rear and all ancillary works necessary to facilitate the development.... login required. |
Details... |
330m |
22/04/2021 |
GRANT PERMISSION |
Greenhills NCT Centre, Greenhills Road, Tallaght, Dublin 24 |
Construction of an acoustic wall, 4.5m high with cranked top to north facing (back) & east and west facing (side) boundaries of existing NCT testing centre and revised operating hours to granted permission Ref: PL 06S.245111 together with all associated site works.... login required. |
Details... |
170m |
18/03/2021 |
GRANT PERMISSION |
35, Tymon North Lawns, Tallaght, Dublin 24 |
Construction of a new single storey rear extension (22sq.m) with pitched roof and all associated site works.... login required. |
Details... |