2.2km |
24/12/2024 |
N/A |
Chapel Hill, Lucan, Co. Dublin. |
Removal of existing prefabricated structure on site with replacement permanent detached two storey/dormer structure located to the south-west of the site for mixed flexible community uses (such as childcare/creche/playschool/c... login required. |
Details... |
2.3km |
22/12/2024 |
N/A |
Chapel Hill, Lucan, Co. Dublin. |
Permission for the removal of existing prefabricated structure on site with replacement permanent detached two storey/domer structure located to the north-east of the site for mixed flexible community uses (such as childcare/creche/playsch... login required. |
Details... |
1.8km |
20/12/2024 |
N/A |
Cooldrinagh Lane, Leixlip, Co.Dublin |
Permission for the development of 6 Nr dwelling houses at Cooldrinagh Lane, Leixlip, Co. Dublin, in the townland of Cooldrinagh. The Site is located to the south of ''Cooldrinagh Lane'' (house), and to the west of Cooldrinagh Lane. The proposed development will consist of the construction of 6 No. 2 storey detached 4-bedroom houses. The proposed development will be served ... login required. |
Details... |
2km |
20/12/2024 |
N/A |
Site within the townland of Gollierstown, (West of Grange Castle Business Park), Newcastle, Co. Dublin. |
The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers a... login required. |
Details... |
450m |
11/12/2024 |
N/A |
8, Airlie View, Finnstown, Lucan, Co. Dublin. |
Construction of a two storey extension to the side and a first floor extension to the side and a first floor extension over the existing single storey rear return and a new first floor window facing the public road and all ancillary site works.... login required. |
Details... |
310m |
11/12/2024 |
N/A |
64, The Paddocks Drive, Adamstown, Lucan, Co. Dublin, K78 R6H3. |
Single storey extension to the rear of existing house... login required. |
Details... |
410m |
25/11/2024 |
GRANT PERMISSION |
62, Dodsboro, Lucan, Co. Dublin |
Construction of a two storey detached dwelling with attic conversion; New vehicular entrance at the rear of the existing site accessed from Shackleton Way roadway; All together with all associated site works.... login required. |
Details... |
570m |
22/11/2024 |
GRANT PERMISSION |
St Helens Avenue, Finnstown, Adamstown, Co Dublin, K78 A2H6 |
The proposed development comprises the provision of a new access road (approx. 28.5m in length) to facilitate the creation of a future vehicular entrance to the site of Airlie House (a Protected Structure) from St. Helens Avenue; and all associated and ancillary site development works including the relocation of 6no. existing unallocated car parking spaces on St. Helen's Avenue to th... login required. |
Details... |
2.9km |
21/11/2024 |
N/A |
Thomas Omer Way,, (east of Kishoge Community College), Balgaddy, Lucan, CO DUBLIN |
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with ... login required. |
Details... |
1.6km |
20/11/2024 |
GRANT PERMISSION & GRANT RETENTION |
Maxol Service Station Site, Newcastle Road, Adamstown, Co. Dublin, K78 X4E1 |
Permission and Retention permission for development at this site (total c. 0.42 ha) at Maxol Service Station, Newcastle Road, Adamstown, Lucan, Co. Dublin, K78 X4E1 (c. 0.29 ha) and the adjoining unused lands (c. 0.13 ha) to the south located at the junction of Newcastle Road and the Adamstown Industrial Estate access road.
The development for which permission is sought will consist of: Change of use and incorporation of the unused lands (c. 0.13 ha) into the service station site and removal of the intervening boundary; Construction of an EV Charging Hub (consisting of 6 No. EV charging car parking spaces, canopy, substation and ancillary plant, and associated signage (6 No. x 2.5 sq m above the charging spaces, and 2 No. x 9.5 sq m single-sided internally illuminated totem signs)); Revisions to the overall site layout (resulting in the provisions of 33 No. car parking spaces (an increase of 15 No. car parking spaces) excluding the EV Hub spaces), motorbike and bicycle parking, alterations to vehicular circulation, relocation of air and water services, offset fills, vents and associated chambers; Provision of replacement foul water treatment plant wi... login required. |
Details... |
2.2km |
20/11/2024 |
N/A |
Grange Castle Business Park, Clondalkin, Dublin 22 |
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entr... login required. |
Details... |
360m |
19/11/2024 |
N/A |
5, Shackleton Lodge, Lucan, Co Dublin |
The construction of a single storey rear extension incorporating an extended kitchen/dining /Living space, Plus all associated site works within a Strategic Development Zone... login required. |
Details... |
520m |
08/11/2024 |
GRANT PERMISSION |
11, Shackleton Square, Lucan, Co. Dublin, K78 Y0C0 |
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, new gable window, 4no. roof windows to the front and 2no. roof windows to the rear.... login required. |
Details... |
2.4km |
05/11/2024 |
REQUEST ADDITIONAL INFORMATION |
Grangecastle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22 |
The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.... login required. |
Details... |
2.8km |
05/11/2024 |
REQUEST ADDITIONAL INFORMATION |
Development Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. |
Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of c.15.6 hectares (on two land parcels) known as 'Development Area 9' Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. The site is principally bounded by the Dublin-Cork railway line to the north, the Grand Canal to the south, the Grange Castle Road (R136) to the south-west and undeveloped lands to the north-west and east. The development will consist of the construction of a mixed-use development, which includes 660 no. residential units comprising: • 264 no. semi-detached and terraced houses (7 No. 2 bed 4 person houses, 238 No. 3 bed houses and 19 No. 4 bed houses), ranging in height from 2 to 3 storeys. • 68 No. duplex apartment units (34 no. 2 bed 4 person units and 34 no. 3 bed units), arranged across 6 No. duplex blocks, ranging
in height from 2 to 3 storeys; • 328 no. apartments (165 no. 1 bed units, 30 no. 2 bed 3 person units, 133 no. 2 bed 4 person units), arranged across 7 No. apartment blocks (Blocks 1, 2, 3, 4, 5a, 5b and 5c), ranging in height from 4 to 6 storeys; and • A creche (c. 615 sq m) at ground floor level within Block 4. The development will also include a Local Node at 'Clonburris Little' which includes the provision of a double-height Park Hub building (c. 8m in height) comprising c. 1,558 sq m of community floorspa... login required. |
Details... |
400m |
01/11/2024 |
GRANT PERMISSION |
9, Shackleton Wood, Lucan, Co. Dublin, K78 Y2C0 |
Attic conversion to non-habitable storage space with roof windows to front and rear of existing roof all with associated ancillary works.... login required. |
Details... |
2.8km |
30/10/2024 |
DECLARED NOT EXEMPT |
Microsoft DUB Campus, Grange Castle Business Park, Dublin 22 |
Implementation and use of 13 no. temporary replacement generators at the Dub15 Data Centre building within the Microsoft Campus to operate the data hall until the recently permitted Gas Network Ireland (GNI) Skid (SDCC Reg Ref. SD24A/0019) is constructed and operational.... login required. |
Details... |
970m |
29/10/2024 |
GRANT PERMISSION |
7, Aderrig Place, Adamstown, Lucan, Co. Dublin, K78 C9C4 |
Proposed development within Area 8 of the Adamstown Strategic Development Zone comprising part change of use of existing dwelling to allow a crèche (46.5 sqm) to operate from the premises for a temporary period of five years, involving minimal internal alterations at first-floor level.... login required. |
Details... |
2.9km |
25/10/2024 |
GRANT PERMISSION |
Site located in the townlands of Coolscudden, Brownstown and Milltown, West of Grange Castle Business Park, Newcastle, Co. Dublin |
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (total... login required. |
Details... |