2.7km |
22/11/2024 |
N/A |
Lands at Citywest Campus, Garters Lane, Saggart, Co. Dublin. |
The construction of a 4-storey Primary Care Centre building which will provide HSE Services such as general primary care, mental health, disability and older person services; The building will accommodate GP rooms, day care centre with associated kitchen facilities and external deck amenity space, pharmacy, treatment/consultation rooms, primary care administrative offices, as well as ancillary accommodation including staff facilities, offices, meeting rooms, reception/waiting areas, ESB substation and plant; The development will be accessed via the existing avenue to the Citywest Campus entered from ... login required. |
Details... |
2.8km |
21/11/2024 |
N/A |
Aylmer Road, Kilmactalway, Newcastle, Co.Dublin, D22 FP46 |
A Single storey self-contained family flat side extension and all associated site works... login required. |
Details... |
2.8km |
20/11/2024 |
N/A |
Grange Castle Business Park, Clondalkin, Dublin 22 |
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entr... login required. |
Details... |
2.6km |
08/11/2024 |
GRANT PERMISSION |
Roadstone Limited, Cookstown Road, Dublin 24, D24 PKK2 |
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The dev... login required. |
Details... |
2.8km |
05/11/2024 |
N/A |
Grangecastle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22 |
The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.... login required. |
Details... |
2.9km |
05/11/2024 |
N/A |
Development Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. |
Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of c.15.6 hectares (on two land parcels) known as 'Development Area 9' Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. The site is principally bounded by the Dublin-Cork railway line to the north, the Grand Canal to the south, the Grange Castle Road (R136) to the south-west and undeveloped lands to the north-west and east. The development will consist of the construction of a mixed-use development, which includes 660 no. residential units comprising: • 264 no. semi-detached and terraced houses (7 No. 2 bed 4 person houses, 238 No. 3 bed houses and 19 No. 4 bed houses), ranging in height from 2 to 3 storeys. • 68 No. duplex apartment units (34 no. 2 bed 4 person units and 34 no. 3 bed units), arranged across 6 No. duplex blocks, ranging
in height from 2 to 3 storeys; • 328 no. apartments (165 no. 1 bed units, 30 no. 2 bed 3 person units, 133 no. 2 bed 4 person units), arranged across 7 No. apartment blocks (Blocks 1, 2, 3, 4, 5a, 5b and 5c), ranging in height from 4 to 6 storeys; and • A creche (c. 615 sq m) at ground floor level within Block 4. The development will also include a Local Node at 'Clonburris Little' which includes the provision of a double-height Park Hub building (c. 8m in height) comprising c. 1,558 sq m of community floorspa... login required. |
Details... |
30m |
04/11/2024 |
INVALIDATE APPLICATION |
Baldonnell Lower, Kingswood Business Park, Dublin 22, D22E9C |
The proposed development will consist of the following: 1. A new truck wash facility to the rear of the existing site. 2. A new truck refuelling station to the front of the site and 3. All of the above works along with all ancillary and associated site works necessary to complete this development.... login required. |
Details... |
2.9km |
01/11/2024 |
N/A |
Clonburris, Parkleigh Drive, Dublin 22 |
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ21A/0022, and as amended under South Dublin County Council Reg. Ref.: SDZ23A/0029, relating to the local node building (Block CR) comprising of the temporary change of use of the permitted flexible community space (c.73.7 sq.) located at gr... login required. |
Details... |
1.6km |
31/10/2024 |
DECLARED EXEMPT |
Unit 7, Kilcarbery Business Park, New Nangor Road, Ballybane, Dublin 22 |
The development will consist of two basic canopy shelters which are to be erected directly above two existing generator compounds for weather protection and maintenance. The canopy design and materials are chosen to have minimal impact on the external appearance.... login required. |
Details... |
2.3km |
30/10/2024 |
DECLARED NOT EXEMPT |
Microsoft DUB Campus, Grange Castle Business Park, Dublin 22 |
Implementation and use of 13 no. temporary replacement generators at the Dub15 Data Centre building within the Microsoft Campus to operate the data hall until the recently permitted Gas Network Ireland (GNI) Skid (SDCC Reg Ref. SD24A/0019) is constructed and operational.... login required. |
Details... |
1.9km |
25/10/2024 |
GRANT PERMISSION & GRANT RETENTION |
The Green Isle Hotel, Boot Road, Clondalkin, Dublin 22 |
Retention permission for the removal of existing scrub plantation and for the plantation and for the placing of clean broken stone at ground level, for the creation of an overflow carparking area for work vehicles and buses and for the erection of a green mesh fence and galvanised palisade... login required. |
Details... |
30m |
03/10/2024 |
INVALID - SITE NOTICE |
Baldonnell Lower, Kingswood Business Park, Dublin, D22 E9C3 |
1. A new truck wash facility to the rear of the existing site. 2. A new truck refuelling station to the front of the site and 3. All of the above works along with all ancillary and associated site works necessary to complete this development.... login required. |
Details... |
2.4km |
17/09/2024 |
GRANT PERMISSION |
Within the townlands of Kilmactawlay and Milltown, Newcastle, Co. Dublin |
Development at this site on lands that include the Aylmer Road (L6003); Baldonnel Road (L2001); and lands that include a small section to the north, but are primarily to the south, of the Aylmer Road, including part of the Griffin allotments, within the townland of Kilmactawlay and Milltown, Newcastle, Co. Dublin consisting of the widening, to its south, of the existing Aylmer Road (L6003) from its junction with the Baldonnel Road (L2001) for a distance of c. 520m to the west. The widened road will tie in with the existing road to the west of a proposed new roundabout. The new roundabout will be created by utilising lands to the north and south of Aylmer Road to facilitate access to a new internal estate road (270m in length) to its south-east with a new roundabout at its end that will provide future ... login required. |
Details... |
2.8km |
26/08/2024 |
REFUSE EXT. OF DURATION OF PERMISSION |
Grange Castle Business Park, Clondalkin, Dublin 22 |
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entr... login required. |
Details... |
2.9km |
14/08/2024 |
GRANT PERMISSION FOR RETENTION |
Unit 648, Greenogue Business Park, Jordanstown Aveue, Rathcoole, Co. Dublin |
Charles River Microbial Solutions International Limited intend to apply to South Dublin County Council for retention permission at unit no. 648, Jordanstown Drive, Greenogue Business Park, Rathcoole, Co Dublin.
The retention permission consists of: Retention of minor alt... login required. |
Details... |
2.3km |
31/07/2024 |
GRANT PERMISSION |
Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22, D22F1W8 |
Microsoft Ireland Operations Ltd. intend to apply for PERMISSION for development at this site at Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation.
The development will co... login required. |
Details... |
1.1km |
26/07/2024 |
GRANT PERMISSION |
Lands East Of Barney's Lane, Brownsbarn, Baldonnell, Co. Dublin |
Development on a site of c7.29 ha located on lands east of Barney's Lane, Brownsbarn, Baldonnell, Co. Dublin. The proposed development is comprised of change of use of the lands from vehicle distribution centre car park to a logistics warehouse campus. The proposed development includes 4 no. new logistics / warehouse units as follows; 1. Unit 1 - GFA c. 5,936 sq m (warehouse area c. 5,248 sq m, with c. 688 sq m ancillary office and staff facility spaces); 2. Unit 2 - GFA c. 3,632 sqm (warehouse area c. 3181 sq m, with c. 451 sq m ancillary office and staff facility spaces); 3. Unit 3 - GFA c. 6,389 sqm (warehouse area c. 5658 sq m, with c. 730 sq m ancillary office and staff facility spaces); 4. Unit 4 - GFA c. 4,089 sqm (warehouse area c. 3,591 sq m, with c. 498 sq m ancillary office and staff facility spaces); A... login required. |
Details... |
2.3km |
25/07/2024 |
REFUSE PERMISSION FOR RETENTION |
21, Parklands Bolevard D24 PT8W, Saggart, Co. Dublin, D24 PT8W |
Retention and change of use of one single storey detached 2.85m high home office unit to a self-contained living unit.... login required. |
Details... |
2.4km |
23/07/2024 |
GRANT PERMISSION |
Fortunestown Lane and, Parklands Parade, Saggart, Co. Dublin. |
Greenacre Residential DAC intends to apply for permission for modifications to previously approved development SHD ABP-305563-19 at this site at Fortunestown Lane and Parklands Parade, Saggart, Co. Dublin. The proposed development will consist of modifications to the development permitted under Reg. Ref. SHD ABP-305563-19 which comprised 488no. apartments and 1,985sq.m of non-residential floorspace within 5no. blocks (Blocks A to E) ranging in height from 5 to 9 storeys. The proposed modifications relate to the previously permitted 5 storey Blocks C, D & E only and consist of an additional storey on each block and reconfiguration of the previously permitted floor levels to provide an additional 86no. apartment units and a total of 396no. apartments and 752sq.m of non-residential floorspace in lieu of the previously permitted 310no. apartments and 896sq.m of non-residential floorspace. Overall, the permitted Blocks A & B and the modified Blocks C, D & E will accommodate 574no. apartments and 1,841sq.m of non-residential floorspace. The modified blocks will consist of: - Block C: 6-storey block accommodating 129no. units (26no. 1 bed units, 84no. 2 bed units and 19no. 3 bed units) with 3no. retail/ commercial units (555sq.m) an... login required. |
Details... |