1.5km |
15/11/2024 |
N/A |
Munny Lower , Tullow , Co. Wicklow |
The construction of a part two storey, part single storey dwelling, new entrance, appropriate waste water treatment system, bored well, single storey garage and
all ancillary site works and landscaping.... login required. |
Details... |
1.8km |
24/09/2024 |
N/A |
Coolkenno Sports Field , Coolkenna , Tullow |
a In Line Amplification Site which consists of 2 no. fibre equipment cabins, 2 no. emergency generators, security fencing, access via right of way and associated works... login required. |
Details... |
2.1km |
17/06/2024 |
N/A |
Killinure , Coolkenno , Tullow |
a dwelling house with services and all associated site works... login required. |
Details... |
2km |
13/03/2024 |
N/A |
Munny House , Tullow , Co. Carlow |
change of use to a ninety day plus rentable unit... login required. |
Details... |
2.6km |
29/01/2024 |
CONDITIONAL |
Barnacashel , Coolkenno , Co. Wicklow |
construct a slatted cattle shed with concrete aprons and all associated site works in my farmland... login required. |
Details... |
2.1km |
09/10/2023 |
N/A |
Killinure , Coolkenno , Tullow |
to construct a dwelling house with services and all associated site works... login required. |
Details... |
2.7km |
11/04/2023 |
CONDITIONAL |
Coolkenna , Tullow , Co. Wicklow |
to construct and install a slurry bag and all associated site works... login required. |
Details... |
2km |
14/02/2023 |
REFUSED |
Money Upper , Coolkenna , Co. Wicklow |
1) 3 no. glamping pods, 1 no. log cabin and existing toilet/shower block facility all for short term camping use 2) conversion of part of existing traditional stone building for use as kitchenette and games room as part of camping facilities and 3) Permissi... login required. |
Details... |
2.2km |
10/01/2023 |
CONDITIONAL |
Newstown , Ardattin , Tullow |
to construct 1) 2No. Grain stores, 2) Modular Malting Units 3) Storage Shed to house 2No. Water Filtration Units with 4No. Stainless Steel Cylindrical Water Storage Tanks and 4) 3 No. Silos with concrete aprons and all associated site works ... login required. |
Details... |
2.2km |
07/12/2022 |
N/A |
Newstown , Ardattin , Tullow |
1) 2No. Grain Stores, 2) Modular Malting Units 3) Storage Shed to House 2No. Water Filtration Units with 4No. Stainless Steel Cylindrical Water Storage Tanks and 4) 3 No. Silos with concrete aprons and all associated site works... login required. |
Details... |
2.2km |
14/11/2022 |
N/A |
Newstown , Ardattin , Tullow |
to construct 1) 2No. Grain Stores, 2) Modular malting units 3) Storage Shed to House 2No. Water Filtration Units with 4No. Stainless Steel Cylindrical Water Storage Tanks and 4) 3 No. Silos with concrete aprons and all associated site works ... login required. |
Details... |
2.7km |
25/08/2022 |
CONDITIONAL |
Coolkenna , Tullow , Co. Wicklow |
(1) renovation of existing traditional workers dwelling in my existing farmyard with services (2) permission for extension to rear of existing traditional workers dwelling and (3) permission for change of use of same to short-term letting use with all associated site works... login required. |
Details... |
2km |
19/04/2022 |
REFUSED |
Money Upper , Coolkenna , Co. Wicklow |
change of use of 2 no. traditional stone buildings from agricultural use to commercial short term letting use consisting of 3 no. short term letting units with services and all associated site works... login required. |
Details... |
920m |
08/04/2022 |
CONDITIONAL |
Killenure , Coolkenno , Co. Wicklow |
the construction of a two storey dwelling, detached double garage, onsite wastewater treatment system and polishing filter, a bored well and all associated ancillary site works... login required. |
Details... |
2.5km |
21/02/2022 |
CONDITIONAL |
Leany , Ardattin , Tullow |
to construct 2 no. silage pits, concrete aprons and all associated site works... login required. |
Details... |
1.5km |
16/12/2021 |
CONDITIONAL |
Killinure , Coolkenno , Co. Wicklow |
dwelling house with domestic garage, new effluent disposal system to current EPA standards, bored well and new site entrance along with all ancillary site works... login required. |
Details... |
2.8km |
01/12/2021 |
CONDITIONAL |
Rath East , Tullow , Co. Wicklow |
construction of a pig finishing shed with roof mounted solar/PV panels on south facing rake and connections to existing storm water drainage system and slurry management network a... login required. |
Details... |
1.6km |
03/09/2021 |
CONDITIONAL |
Munny Lower , Tullow , Co Carlow |
construction of a part two storey , part single storey dwelling, new site entrance, wastewater treatment system to current EPA standards, private well and all ancillary site works ... login required. |
Details... |
890m |
22/07/2021 |
N/A |
Killenure , Coolkenno , Co. Wicklow |
construction of a two storey dwelling, detached garage, onsite wastewater treatment system and polishing filter, a bored well and all associated ancillary site works... login required. |
Details... |