1.1km |
09/08/2024 |
CONDITIONAL |
Craans , Ardattin , Co. Carlow |
retention is sought for existing installed Eurotank Wastewater Treatment System and associated 90 square meters fully pumped soil polishing filter as a change to that permitted under PL21/138 and all associated ancillary works... login required. |
Details... |
1.1km |
26/07/2024 |
N/A |
Craans , Ardattin , Co. Carlow |
retention is sought for existing installed Eurotank Wastewater Treatment System and associated 90 square meters fully pumped soil polishing filter as a change to that permitted under PL21/138 and all associated ancillary works... login required. |
Details... |
1.3km |
05/07/2024 |
CONDITIONAL |
Coolroe , Clonegal , Co. Carlow |
to construct a dwelling house with services, agri workshop shed and all associated site works on lands... login required. |
Details... |
1.6km |
09/01/2024 |
N/A |
Leany , Ardattin , Co Carlow |
to erect 4 no Grain Silos and all associated site works... login required. |
Details... |
1.6km |
28/11/2023 |
N/A |
Leany , Ardattin , Co Carlow |
2 no Portal Frame Storage Units as constructed and a concrete yard as constructed. Full Planning Permission for the construction of an additional portal frame storage unit, new concrete yard and all associated site works... login required. |
Details... |
2.9km |
05/10/2023 |
CONDITIONAL |
Altamont Gardens , Drummin , Tullow |
2 no. disabled parking spaces and 2 no. EV charging points to the existing public parking area. The proposal also includes for a proposed new length of circa 327.35 sq.m concrete post and w... login required. |
Details... |
920m |
26/05/2023 |
CONDITIONAL |
Broomville , Ardattin , Co. Carlow |
new vehicle entrance, and closing existing entrance that services the existing storey and a half house, and all associated site works... login required. |
Details... |
1.2km |
15/03/2023 |
CONDITIONAL |
Coolroe , Clonegal , Co Carlow |
the demolition of an existing sunroom and construction of a two story extension to the side of an existing dwelling house, extension to existing perculation area and all associated site and landscaping works... login required. |
Details... |
1.4km |
18/11/2022 |
CONDITIONAL |
Woodlands , Ardattin , Co. Carlow |
to construct a one and a half storey extension to existing single storey dwelling, minor alterations to existing elevations, new septic tank and percolation area, decommissioning of existing septic tank, use of existing entrance and all associated site works... login required. |
Details... |
2.6km |
30/08/2022 |
CONDITIONAL |
Ardattin Inn , Newtown Cross Roads , Ardattin |
the erection of an outdoor sitting area to the fore of an existing pub/restaurant... login required. |
Details... |
2.5km |
22/08/2022 |
CONDITIONAL |
Newstown , Ardattin , Co. Carlow |
for a new agricultural entrance and all associated site works... login required. |
Details... |
2.6km |
09/08/2022 |
N/A |
Ardattin Inn , Newtown Cross Roads , Ardattin |
the erection of an outdoor sitting area to the fore of an existing pub/restaurant... login required. |
Details... |
2.1km |
20/06/2022 |
CONDITIONAL |
Craans , Ardattin , Co. Carlow |
Permission for the construction of an Aviary Building, an Imprint Building, a Hack Pen, a hard surface laneway to serve the buildings and all ancillary site works.... login required. |
Details... |
2.7km |
04/03/2022 |
CONDITIONAL |
Ardattin National School , Ardattin , Tullow |
for the demolition of existing standalone shelter / store / water tower structure (floor area to be demolished = 30sqm) and the provision of a single storey extension to side / front consisting of an Entrance ... login required. |
Details... |
2.7km |
21/02/2022 |
CONDITIONAL |
Leany , Ardattin , Tullow |
to construct 2 no. silage pits, concrete aprons and all associated site works... login required. |
Details... |
1.7km |
03/12/2021 |
CONDITIONAL |
Leaney , Tullow , Co. Carlow |
The development will consist of the construction of a single storey dwelling, on-site wastewater treatment system, private well, new splayed entrance and all ancillary site works... login required. |
Details... |
920m |
22/10/2021 |
CONDITIONAL |
Ballintemple , Ardattin , Co. Carlow |
single storey residence, garage and the installation of a septic tank and wastewater treatment system and all ancillary site works
... login required. |
Details... |
1.5km |
30/09/2021 |
CONDITIONAL |
Craans , Ed. Ballintemple , Ardattin |
Permission to erect a fully serviced dwelling house, domestic garage and associated site works ... login required. |
Details... |
1.6km |
09/07/2021 |
CONDITIONAL |
Monaughrim , Clonegal , Co. Carlow |
single storey office building, along with all associated site works... login required. |
Details... |