2.9km |
10/10/2024 |
N/A |
Martinstown , Crookedwood , Co. Westmeath |
construction of 4 no. glamping pods (8 bedrooms) and the installation of a secondary treatment system and soil polishing filter. Permission is also sought for 17 no. car parking spaces and 1 no. bus spac... login required. |
Details... |
2.9km |
26/09/2024 |
N/A |
Martinstown , Crookedwood , Co. Westmeath. |
construction 4 no. glamping pods and the installation of a secondary treatment system and soil polishing filter and all associated site works at the above ad... login required. |
Details... |
2.8km |
22/09/2024 |
CONDITIONAL |
Gaulmoylestown Upper , Knockdrin , Mullingar Co.Westmeath |
development consisting of an educational play centre with sensory rooms, coffee shop, pet farm, outdoor play area, astroturf area, fairy walk, car parking, upgrade site entrance, sewage treatment system and all associated site works... login required. |
Details... |
2.5km |
22/09/2024 |
CONDITIONAL |
Galmoylestown , Knockdrin , Mullingar Co. Westmeath |
construction of a new one and a half story dwelling house, wastewater treatment system and percolation area ... login required. |
Details... |
2.9km |
18/07/2024 |
CONDITIONAL |
Cullenabohoge , Multyfarnham , Co. Westmeath |
demolition of existing side (northeast & southwest) and rear (southeast) extensions. Permission is sought to construct a replacement porch to the southwest elevation, extension to the side (northeast) and rear (southeast) consisting of 3... login required. |
Details... |
2.5km |
04/05/2024 |
REFUSED |
Galmoylestown , Knockdrin , Mullingar Co. Westmeath |
construction of a new one and a half story dwelling house, wastewater treatment system and percolation area ... login required. |
Details... |
2.1km |
28/03/2024 |
CONDITIONAL |
Ballinphort , Multyfarnham , Co. Westmeath |
1. to construct a single storey extension (26sqm) to the northeast elevation of the existing dwelling, to consist of a bedroom, accessible W/C, utility & hotpress.
2. to upgrade the existing agricultural entrance to a shared domestic and agricultural entrance onto the public roadway.
3. for alterations to the 2 existing rear (northeast) first floor windows to be replaced with 1 no. wind... login required. |
Details... |
1.3km |
07/09/2023 |
CONDITIONAL |
The Stables , Mornington , Multyfarnham Co. Westmeath |
development which will consist of change of use of current stables building to two number residential homes. All works are internal configurations and the structure/size of the building will not change from its current form... login required. |
Details... |
1.3km |
30/08/2023 |
N/A |
The Stables , Mornington , Multyfarnham Co. Westmeath |
This proposal outlines the refurbishment of the original stables building into two residential properties. The goal is to preserve the stables' architectural heritage while transforming it into a modern living space. With a focus on sustainability we are looking to provide low-carbon living in a rural setting with minimal changes to the exterior of the building and no addition to the building's footprint.
This project involves converting the stables from a yoga and art space to a residential property occupying the exact same floor area. There will be no demolitions or extensions to the building and therefore no character, externally.
We plan to retain the stable's charm while introducing contemporary elements. The layout will emphasise open spaces and natural light, creating an inviting ambiance for residents with new kitchens, refurbished bathrooms and warm, comfortable living spaces.
Key elements of the refurbishment are:
Preservation: original stonework to external walls to be pointed with lime mortar. All new doors/windows in timber.
Spatial Reconfiguration: The ground floors will feature an open-plan living area, blending the kitchen, dining, and lounge spaces. The upper floors will have private bedrooms... login required. |
Details... |
1.2km |
05/08/2023 |
N/A |
The Stables , Mornington , Multyfarnham Co. Westmeath |
This proposal outlines the refurbishment of the original stables building into two residential properties. The goal is to preserve the stables' architectural heritage while transforming it into a modern living space. With a focus on sustainability we are looking to provide low-carbon living in a rural setting with minimal changes to the exterior of the building and no addition to the building's footprint.
This project involves converting the stables from a yoga and art space to a residential property occupying the exact same floor area. There will be no demolitions or extensions to the building adn therefore no chareacter, externally.
We plan to retain the stable's charm while introducing contemporary elements. The layout will emphasise open spaces and natural light, creating an inviting ambiance for residents with new kitchens, refurbished bathrooms and warm, comfortable living spaces.
Key elements of the refurbishment are:
Preservation: original stonework to external walls to be pointed with lime mortar. All new doors/windows in timber.
Spatial Reconfiguration: The ground floors will feature an open-plan living area, blending the kitchen, dining, and lounge spaces. The upper floors will have private bedroom... login required. |
Details... |
2.4km |
15/06/2023 |
CONDITIONAL |
Multyfarnham GAA , Multyfarnham , Co. Westmeath |
construction of a new 47.5m by 57m all-weather sports pitch with artificial (AstroTurf) playing surface to the southeast of the site and all associated site works... login required. |
Details... |
1.3km |
17/12/2022 |
CONDITIONAL |
Ballinriddera , Multyfarnham , Co. Westmeath |
to construct (i) Cubicle shed with slatted tanks incorporating Dairy, storage and office and all associated site works. Permission for Demolition of existing silage pit. Permission for retention of (i) slatted cubicle shed (ii) calf shed (iii) and silage pit extension is also required... login required. |
Details... |
1.1km |
10/11/2022 |
CONDITIONAL |
Ballinriddera & Monintown , Multyfarnham , Co. Westmeath |
to construct cattle underpass with underground effluent tank, access ramps, field access gate and all associated site works... login required. |
Details... |
2.8km |
29/09/2022 |
CONDITIONAL |
Ballindurrow , Multyfarnham , Co.Westmeath |
construct a single-storey house, install a domestic wastewater treatment plant and polishing filter and carry out all associated site works. The site of the proposed ... login required. |
Details... |
1.4km |
09/09/2022 |
CONDITIONAL |
Blackmiles Townland , Crookedwood , Mullingar |
continuance of use of the existing quarry and associated processing previously permitted under P. Ref. 98/1235 (ABP PL25.113179) and P. Ref. 04/5530 (ABP PL25.212150) within an application area of c. 14.2 hectares and for a period of 8 years to allow the previously permitted rock extraction be completed. The appropriate period of planning register reference 04/5530 was extended by order dated 18/01/2018. The development proposed seeks to utilise existing permitted ancillary buildings... login required. |
Details... |
2.7km |
29/08/2022 |
CONDITIONAL |
Culleendarragh , Multyfarnham , Co.Westmeath |
extend existing dwelling at the rear to include a kitchen, dining area with 2 velux windows, a lobby, bathroom and playroom with all ancillary site works ... login required. |
Details... |
2.8km |
22/06/2022 |
REFUSED |
Froghanstown , Multyfarnham , Co Westmeath |
to construct a new single storey dwelling house, wastewater treatment system and polishing filter and all associated site works... login required. |
Details... |
2.8km |
22/06/2022 |
REFUSED |
Froghanstown , Multyfarnham , Co Westmeath |
to construct a new single storey dwelling house, wastewater treatment system and polishing filter and all associated site works... login required. |
Details... |
2.1km |
21/04/2022 |
CONDITIONAL |
Tyfarnham , Down & Rathlevanagh Townlands , Knockdrin |
Continuance of use of existing quarry and associated processing previously permitted under P.Ref. 93/607, Section 261A Substitute Consent (ABP Ref. SU0026) and P.Ref. 21/460. Extension to rock, and sand and gravel extraction areas, works proposed consist of the following; 1. Extraction of rock including blasting operations to a depth of c.28m above OD within an overall quarry extraction area of c.12.5 hectares, with associated mobile crushing and screening plant and the provision of a new internal quarry access ramp, and provision of perimeter screening berms; 2. Lateral extension of c.7.6 hectares to the current sand and gravel extraction area, with dry working above the water table and processing that includes crushing, washing, and screening, and provision of perimeter screening ber... login required. |
Details... |